CC1 CC2
SR.
ID REVISION DATE SIGN
NO
12/16/20
1 0 NEW DRAWING GENERATED
21
REINFORCING
REINFORCING
COLUMN SIZE
COLUMN SIZE
TIES ZONE-A
TIES ZONE-B
TIES ZONE-C
TIES ZONE-A
TIES ZONE-B
TIES ZONE-C
SECTION
SECTION
STORY2
10@100 mm 10@100 mm
(EL. 9000 MM)
TITLE
SHEET
4000 mm
Story4
10@150 mm
CONCRETE COLUMN SCHEDULE
PROJECT
12-16 (600.00)
CLIENT
USER
Story2
CONSULTANT
200 MMX300 MM
10@100 MM
10@150 MM
10@150 MM
10@100 MM
10@150 MM
10@150 MM
A
5000 mm
Story1
10@150 mm
12-16 (1,948.38)
12-16 (600.00)
Base
10@100 mm
CC1:Elevation-1
M. NURIL
(Scale = 1:50) SHEET NO. DESIGNED
HIDAYAT
DATE CHECKED AH
APPROVED