This document provides a sequence for taking off items of work in substructure using the Building and Engineering Services Measuring Rules (BESMM) 4. It lists 40 items numbered from 1 to 40 with their corresponding item descriptions and page references in the BESMM 4. The items cover various stages of substructure work from site clearance to wall finishings and decoration.
This document provides a sequence for taking off items of work in substructure using the Building and Engineering Services Measuring Rules (BESMM) 4. It lists 40 items numbered from 1 to 40 with their corresponding item descriptions and page references in the BESMM 4. The items cover various stages of substructure work from site clearance to wall finishings and decoration.
This document provides a sequence for taking off items of work in substructure using the Building and Engineering Services Measuring Rules (BESMM) 4. It lists 40 items numbered from 1 to 40 with their corresponding item descriptions and page references in the BESMM 4. The items cover various stages of substructure work from site clearance to wall finishings and decoration.