Measurement of Building Works

(QUS 102)
SEQUENCE FOR TAKING OFF ITEMS OF WORK IN SUBSTRUCTURE USING BESMM 4

S/NO. ITEM BRIEF DESCRIPTION PAGE


1 1.5:4 Site Clearance 119
2 1.5:5 Site preparation 120
3 1.5:5.2 *Topsoil excavation 120
4 1.5:6 Excavation 121
5 1.5:6.1 *Bulk excavation (Reduce level) 121
6 1.5:6.2 *Foundation excavation (Trench) 122
7 1.5:10 Retaining excavated material 125
8 1.5:10.1 *Topsoil 125
9 1.5:10.2 *All other excavated materials 125
10 1.5:9 Disposal 124
11 1.5:9.1 *Ground water 124
12 1.5:8 Support 124
13 1.11:2 Horizontal work 148
14 1.11:2.1.1 *Blinding (Bottom of excavation - C7) 148
15 1.11:2.1.2 *Structures (Foundation: Strip - C7) 148
16 1.14:1 Walls 165
17 1.14:1.2 *Blockwork 165
18 1.14:16 Damp proof course 170
19 1.5:11 Filling obtained from excavated material 126
20 1.5:11 *Backfilling foundations (M22) 126
21 1.5:9 Disposal 124
22 1.5:9.2 *Excavated material offsite 125
23 1.5:12 Imported filling 127
24 1.5:12.2.1.1 *Making up levels (Laterite - M22) 127
25 1.5:12.2.1.1 *Making up levels (Hardcore - M22) 127
26 1.11:2 Horizontal work 148
27 1.11:2.1.1 *Blinding (Hardcore) 148
28 1.5:16 Damp proof membrane 128
29 1.11:2 Horizontal work 148
30 1.11:2.1.1.0 *Blinding (On damp proof membrane) 148
31 1.11:33 - 37 Reinforcement 155
32 1.11:37 *Mesh 156
33 1.11 Formwork 151
34 1.11:14 *Edges of bed 151
35 1.11:2 Horizontal work 148
36 1.11:2.1.2 *Structure (Bed: Oversite/Ground floor slab - C7) 148
37 1.28 Wall finishings 232
38 1.28:7 *Finish to walls (Rendering) 236
39 1.29 Decoration 242
40 1.29:1 *Painting to general surfaces (Rendered surfaces) 243