You are on page 1of 33

Acknowledgment

First of all I would like to Thanks my God to giving me spiritual fulfillment and moralstrength
to complete this practical attachment. Next I would like to thanks DebreberhanUniversity
College of Business and Economics Department of Logistics and SupplyChain Management to
give me this opportunity and also I would like to thanks
allmembers of purchasing department of in Debreberhan university fiancé and economicdevelop
ment those who are facilitating my practical attachment especially mulukn fikre(purchasing
manager), and others who are supervisors of some department.
Abstract
This summer practical attachment was conducted. To analyze the real workingenvironment with
that field of study. It focuses to identify for the purchasing systemfrom the heist level up to
lowest level of organization structure. In Ethiopia government policy purchasing system is
mixed economy. But,The main objective of this report wasto investigate the challenges of
purchasing management in Debreberehan university andidentifying the existing problem of the
organization and describe the possible alternativesolution that can alleviate the existing
challenges in the company operation.

 
 3 
Table of content page
Acknowledgments…………………………………………………………………………………
…2
 
Abstract…………………………………………………………………………………………….
.
2
Table content………………………………………………………………………………………
.3
-4
CHAPTER ONE………………………………………………………………………………
51. Background of the organization
……………………………………………………………
51.1 Cardinal
issues………………………………………………………………………………
51.2
Mission…………………………………………………………………………………
51.3 Vision
…………………………………………………………………………………
51.4 Values
…………………………………………………………………………………
51.5
Objective………………………………………………………………………………
61.6
Organizational Structure…………………………………………………………….
6-71.7
Responsibility of Some specific Department………………………………………..
71.8
Administrative department …………………………………………………..
.71.9 Purchasing
department ………………………………………………………..
81. 2.1
SOWT Analysis………………………………………………………………
.81.2.2 Strength
………………………………………………………………………...
81.2.3
Weakness……………………………………………………………………….
81.2.4 Opportunity
…………………………………………………………………….
91.2.5 Threats
………………………………………………………………………….
91.2.6 The problem I observed in organization
…………………………………….
91.2.7 possible solution for
those problem …………………………………………..
10
CHAPTER TWO…………………………………………………………………………..
10
2 Activity report……………………………………………………………………………
102.1
Background of the department……………………………………………………….
102.2
Objective and major responsibility of the department as well as activity………….
112.3 My responsibility and major activit
y as member of department……………………
122.4 Performance
evolution of my activity………………………………………………….
122.5 Problem
encountered on job and remedial I have taken …………………………..
132.6
Problem of division or department and suggested solution ………………………….
14
CHAPTER THREE…………………………………………………………………...
153
Attachment of evaluation ………………………………………………………………...
153.1
Rational of practical attachment ……………………………………………………..
153.2
Significance of practical attachment …………………………………………………
153.3
major problems during attachment ………………………………………………….
163.
4 suggested solution and way forward for attachment ………………………………..
163.
5 Relevance of organization and my activity to my study……………………………..
17

 
 4 
3.6 The real world practical attachment………………………………………………….
17
CHAPTER FOUR………………………………………………………………………….
17
4 conclusion and Recommendation………………………………………………………..
17
4.1 conclusion ……………………………………………………………………………….
17
4.2 Recommendation ………………………………………………………………………..
18
4.3 Reference……………………………………………………………………………...
.....19

 
 5 
C H A P T E R O N E
INTRODACTON1.
BACKGROUND OF THE ORGANIZATION
 
Debreberhan university procurement and property administration directorate is located inamahra
regional state, North Shao zone with the distance about 130km from capital cityof Addis Abeba.
The finance and economic development of the Debreberhan universitywere established in 1999
E.C right from the establishment, the procurement manage theeconomic resource of the
Debreberhan university for the sustained resource availabilityof the university. Now a day this
department; procurement and property administrationdevelopment of Deberberhan university is
at good stage or somewhat stabled.
1.1 CARDINAL ISSUE
1.2 Mission

 
Producing efficient graduates by offering research assisted qualityeducation

 
Undertaking a problem solving research based on national need and benefiting the community
with theOutcome

 
Offering government and community centered training consultancyservice ,transferring
technology and undertaking innovation
1.3 Vision
 

 
Aspires to be the best university in Ethiopia by 2020
1.4
 
Values

 
Shared vision

 
Quality service

 
Attention to cross-cutting issues

 
 6 

 
Diversity

 
Professionalism

 
Equality effectiveness

 
Democracy
1.5
Objective
 

 
reduce the gap between supply and demand of the reordered in theorganization.

 
Reports every purchase activity of the week, and in the early daysin the first month of the year.
 

 
Planning in consideration of regional development
 

 
Minimizing the cost of the organization with maximum quality.
 

 
Recording pad code and sending timely report to the concerned person.
 

 
Controlling government resource and property.
 
1.6 ORGANIZATIONAL STRUCTURES
Organizational structure means the chain of the authority from higher level tolower level. The
mean important of the organizational structure is to accomplishthe activity planned in efficient
and effective manner at it is the crucial part forthe office to achieve its objective.In generally,
there are faive major departments such as: - budgeting and planningdepartment, auditing and
inspection department,administration and purchasingdepartment. Each of the department is
responsible for their respective duties andaccountable for their customers. The organizational
structures of the FinanceOffice of Debreberhan University were summarizing as the following
diagram.

 
 7 
1.7. Responsibility of some specific department1.8. Administrative department

 
This is the main department of the sector.

 
It is responsible to lead the information.

 
It insures the proper and efficient execution of the activities of eachdepartment.

 
Supervise the work of employ under the division.
BOARD
Academic vicepresident
Research andcommunity servicevice residantBusiness anddevelopmentvice
residantAdministration and studentservice vice resident
President
FinancedevelopmentProcurement andproperty administrationGovernmentservice
directorProcurementteamPropertyadministrationteamHuman resourcemanagement
 
 8 
1.9. Purchasing department

 
Make purchase announcement in order to purchase particular material usedto run the
organization activities.

 
Maintaining and administering the in and out flow material of theorganization.

 
Maintaining and controlling office employees that is checking or followingeach employs when it
is get office at a time or not.
1.2.1SWOT analysis (strength, weakness, opportunity and treaties)
1.2.2Strength
The strength of the organization internally can describe as follows.

 
Smooth relationship between employees and management to achieve the overallgoal of the
finance

 
Employees Promotion and transfer depend up on their experience and performance

 
Employees have the habit of team work in finance

 
The finance provides service for it employees

 
Employees have ability to serve customers

 
Keeping the organizational policy or behavior

 
It gives highly morale for its workers
1.2.3.
Weakness
 
The weakness of the organization can be representing as follows.

 
 No proper plan

 
In ability of doing their activity effectively

 
Shortage of guiding written document which base for new comer

 
Some of the employees not respect the office hour

 
 9 

 
Using office materials for their own purpose
1.2.4.
Opportunities
 
There is transparency and willingness to office of workers.

 
High chance to be employed depends on level of education and experience

 
Conductive environment work in the organization

 
Access to have information about organization

 
Presence of plenty of resources
1.2.5
Threats
 These are unfavorable condition that exists outside the organization which negativelyaffects the
performance of the finance. These include the following

 
The customer of organization may not get enough service because some workersare not punctual

 
Using of government resource for personal use
 

 
Excess and unlimited meeting which takes much of the work times
 
1.2.6 The problem I observed in the organization
 
There are many problems I had observed in the office of finance and economicdevelopment
of Debreberhan University in my 30 days. There are many points thatinfluence the achievement
of the organization objectives and mission.Some of them are as follows:-

 
Absence of the right person at right position because of this disagreement created between
employees at some position

 
Lack of punctuality of many employees

 
Shortage of written documentation like different vouchers

 
 10 

 
Weak internet connection because of this IBEX (integral budget and expendituresystem) is not
working most employees unable to do their responsibility
1.2.7 Possible solution for those problems
 

 
Solving the disagreements by making the right person at right position thoughdiscussion

 
Take possible measurement for unpunctual employee

 
Protect documents by modernized way or mechanism like using computer

 
Make IBEX active connection though using wireless

 
Assign the qualified and experienced person for the organization

 
Allocating enough budgets for office material

 
The budget should be allocate according to planned and budget carefully
CHAPTER TWO
2. Activity report
2.1 Background of department
In Debreberhan University procurement and property administration directorate I wasconducted
my attachment in purchasing department. This department is one
ofDebreberhan university procurement and property administration directorate divisionand at the
time of the establishment of the organization in 1999.The responsibility of thisdepartment is
buying material for sectors that found in zone. It has four employees thefirst one is market
survey, the second one is market coordinator and two employees are purchaser .finally the
department play great role for the achievement of the organizationand even for growth of
country.

Trusted by over 1 million members


Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!

Start Free Trial


Cancel Anytime.

 
 11 
2.2 Objective and major responsibility of the department as well as itsactivity.
As mentioned above the main objective of purchasing department is that buying materialfor
different sector found in this zone. Buying method is based on purchasing qualitymaterial at
lowest price ,at right time, at right place, at right quality for all sectors. Beforeconducting their
purchasing activity the department make announcement for competitoror supplier with
the following criteria:

 
Trade license

 
Address of supplier

 
Period of Paying tax
The major responsibility assign to the department include:

 
Preparing purchasing plan

 
Preparing bidding document

 
Purchasing material by bidding

 
Checking whether the price that the supplier set is in accordance with exist
marketsituation or not

 
Works to make the payment system effective and efficiency

 
Identify the winner from the supplier
Purchasing procedures of this organization
 

 
mission of the need

 
Selection of source of supply and evaluation of suppliers

 
Prepare and placement the purchase order

 
Receive and inspect the material

 
 12 
Activity of the departmentThe major activity involves six major steps
:

 
Collecting need

 
Purchasing plan

 
Bidding

 
Purchasing

 
Deliver to store

 
Distribute to concerning sector after recognized by finance administration body
2.3 My responsibility and major activity as member of the department
During my stay in organization I have done some activity. Me have performed includesarranging
bidding document, receiving need documents from different sector and also Ihave organized
some recorded data.To improve the performance of organization I have mentioned some useful
ideaespecially for purchasing department.
My overall responsibility as member of department

 
I was supported department staff in preparation of documents which related to purchasing

 
I consider myself as staff and worked all in whic
h I’m assigned by my sup
ervisor

 
Developed harmonious relationship with department staff and also which that ofother department
2.4. Performance evaluation of my activity
While I was in organization I can say that I have performed activity assigned to meeffectively
and efficiently. I have used my time, effort and property accurately and

 
 13 
respect the command of senior worker and try to do what they ordered me. As themember of
purchasing department during my internship period I accomplished a lot ofactivities as to level of
my understanding I performed the task assigned to me honestlyactively, efficiently and
effectively I also learned a lot from my practice I was punctualand image every possible effort to
get knowledge and skills by practicing in real worldsituation.
2.5. Problem encountered on the job and remedial I have taken
Some problems were faced me during my internship these are

 
Lack of organized documentation

 
Problem of getting rapid response for my request.

 
Problem of speed and confusion.

 
Unwillingness of senior workers to provide information.
Remedial measures taken

 
I tried to originally translate sentence into English rather consuming my time

 
I tried to consult different staff from different department to access information.

 
I try to communicate employees about the purpose of attachment in goodmanner.

 
I try to approach to employee in former or polite way.

 
 14 
2.6. Problem of division or department and suggested solution.
The main problem that faced the purchasing department includes the following.

 
Lack of punctuality.

 
Poor of computer and electronics material

 
Lack of electronics maintenance
Suggested solution

 
Changing the labor working system into computerized system.

 
Motivating the worker by giving rewards.

 
Bringing electronic material.

 
Allocating enough budgets for market survey.

 
Bringing well skilled man power.

 
 15 
CHAPTER THREE:
 3 .ATTECHMENT EVALUATION 3.1. RATIONALE OF PRACTICAL ATTACHMENT
This attachment has great importance behind it. It is primarily planned to check how
thetheoretically learned courses and gained knowledge and skills are applied in real
worldenvironment. It is also aimed of evaluating how relevant and applicable theoretically
courses learned are in real world it also looks into challenge and opportunities’ prevailing
in the real world and; to suggest some possible solution in the real world. The main anddecisive
purposes internship and practical training program is to give
practical professional training to the students. The major significance are mentioned below asfoll
ows.

 
It helps students to relate theoretically learned course and gained knowledgeand skills with
working environment.

 
It helps students to know working environment which they will join aftergraduation.

 
Its greater chance for students to develop knowledge and skills become practice oriented
professional in his / her work after graduation.

 
It is an opportunity student to evaluate themselves with what theoreticallylearned and how to
change in to work.

 
It makes the student to be more experienced and creative.

 
It is device which tells the students to aware what is expected from themtomorrow.

 
It measured the ability and cooperativeness students.
3.2. Significance of practical attachment

 
Helps to easily understand the theoretical though and improve analytical ability.

 
Families with the working environment

 
To know more the working system.

 
 16 

 
How to be punctual in work place

 
How to solve problems through discussion
 
Some other significance of attachment

 
it enable the students to easily identify problems and pass challenges

 
it helps to identify the students how they are sensitive to execute theirresponsibility

 
the students should be also understand that theories are applicable

 
It increase confident of the student
3.3Major problems during attachment

 
Shortage of information due to scarcity of documentation.

 
Absence of willingness to get information from some employees

 
Problem of translating document written by Amharic Language into EnglishLanguageGenerally,
practical attachment is very significant to change theoretical based on
Students’ practical attachment.
 
3.4. Suggested solution and way forward for attachment
In order to overrun the above mentioned problem the following solution will beforwarded

 
Enough data have to be available regarding the organization

 
The organization should recorded its document in English as much as possible

 
Bringing electronics material and computer in office

 
Students have to treated as other senior workers

 
 17 
3.5. Relevance of organization and my activity to my study
 
The task I performed in the organization and my activity is related greatly with my
study but not all i.e. to some extent for example purchasing department doing about costminimiz
ation and buying quality product at right time from right supplier, in additionmanaging material
flow effectively .more over the activity I performed In theorganization encourage me to
highly pay attention to my study more and refer backagain what I learned in the pass.
3.6. The real world practical attachment
It is obvious that the knowledge I had get in class help me while I was conducting
my practical attachment I have observed some course concept during my view in theorganization
.Some of these course concepts are:

 
 payroll preparation related with principle of accounting two

 
 purchasing system related with principle of procurement

 
statistics is related with statistics for business course and other statistics courses

 
Planning, organizing, controlling and leading is related with introduction tomanagement
CHAPTER FOUR
4. Conclusion and Recommendation4.1 conclusions
Debreberhan University procurement and property administration directorate is found inAmhara
regions. The office has its own rule, regulation, plan, vision, structure, missionand objectives.
SWOT analysis-the organization have also its own strength andopportunity also its weakness and
treat which hinders the organization to perform itsactivity in normal way.
 

 
 18 
Debreberhan university procurement and property administration is one of theorganizational
divisions which has its own working strategic plan and perform purchaseadministration related
activities. In addition to this the organization has certain strength,weakness, opportunity and
treats which I have seen from different perspective. Besidesthis the organization process it
activity in fair and active manner in order to servefinancial and non-financial problems of the
organization. Finally I would focus and lookthe above problems in Debreberhan
university procurement and property administrationdirectorate I recommended my solution and
suggestions.
4.2 Recommendations
In the proceeding of parts of the paper I have discussed about debreberhan
universityadministration bureau of finance and economic development. After analyzing all
the proceeding condition and facts at hand I recommend the following point for the better perfor
mance of the sector and its contribution to the bureau of purchase departmentdevelopment of the
Debreberhan university .

 
The bureau of procurement purchase should arrange condition for the supply ofeducated man
power.

 
The organization should have to established network to control the task of eachworker.

 
The purchase should give training and development for each worker to put theirskill on the work.

 
The department has to prove necessary facilities for the employees to increasetheir motivation
and intention towards accomplishing the organizationalobjectives

 
There should be necessary interaction or interconnection between theemployees. This will create
an opportunity for the employees to shareexperience and for improvement necessary
performance of the sector as whole.
 
 19 
4.3 RFERENCES

 
weekly and monthly reports

 
Employees and supervisors ideas

 
Website of the organization

 
Different written documents

 
From other materials

Reward Your Curiosity

Everything you want to read.


Anytime. Anywhere. Any device.
Read free for 30 days
No Commitment. Cancel anytime.
Share this document
Share or Embed Document
Sharing Options

 Share on Facebook, opens a new window


 Share on Twitter, opens a new window
 Share on LinkedIn, opens a new window
 Share with Email, opens mail client
 Copy Text

You might also like

Debrebrihan Universty Department of LSCM Summer Practical Attachment-1


Anonymous AjE09y7Y

abiye main research


Fsha Abrha Araya

Ptcl Final
meharahutsham


o

Procurement

Employment

o
Swot Analysis

Economic Development

BBA Final Report


Pitambar Poudel

Indusrial Attachment Report (Amos)


ismael chumba

New Microsoft Word Document (4).pdf


Nishan Weerakkody

OB Organization Project
Ad Joiya

HRM - Copy
guptaankita12

BUKEDEA DISTRICT LOCAL GOVERNMENT


HSFXHFHX

television kvhdgdgsj.kijhghgdgdx
donsupremo

PTCL Report
Shah Zaib

Project Skill report.doc


Pragash Thakshajiny

SHRM At Mercia Systems-NEW


Ashutosh Sharma

Proposal on inventory management system for WKU


Hashim Abdu

industrial experience 111.docx


Cindy Lakhram

Internship Repot
naeem007

Problem_Faced_By_HRM_department_and_how.rtf
dinar

61806142
Shivam Singh

Concept Note for Survey on Staffing Levels in Uganda September 2015


dennis

Internship Report
Agan Patrick Bayoya

Atlas Honda (Ltd)


Abdul Manan

Organisational Study Guideline at SMS


Vivek Menon

NBP Internship report


Noor Nabi Shaikh

PROPOSAL-4th-edit-10.24
Kaye Torrefiel

management marketing fyp thesis report


Gul Zareen

Supply Chain Management_BBA


NMN Chloe

14264008_MBA-converted
Murshid Iqbal

Tesfaye Wegari
Abiy Getachew

Final Report
nnaima

Materials Handling and Wastage Control


ghintsay

4_5787597727055479192
ayele eshete

Budgeting in CBE
ayele eshete

Budgt Adminisn Cas


ayele eshete

ARBA MINCH University.docx


ayele eshete

Related titles

You might also like