LADDER ASSESSMENT

DATE & TIME-

LOCATION-

PARTICIPANT-

PREPARED BY-

SR. NO. OWNER LOCATION

1 PSP TM TOWER
2 PSP TM TOWER

3 PSP TM TOWER
4 PSP TM TOWER

5 PSP TM TOWER
6 PSP TM TOWER
PHOTO
Wednesday, June 16, 2021

Construction site - Phase 1 & 2

Satchin Sawain, Lokesh Thakur, Manish Sharma,

Manish Sharma

OBSERVATION Comments/Recommendations

Below support of the


grating is missing at most of Support for the grating is to
the landing platform be provided from below
(12*2=24 Location)
Railing need to be
Railing missing at top of TM
interconnected with end to
tower
end

Trip hazard created due to Railing need to extended till


main angle (shown in PIC turning point
Toe Board missing at top of
Toe need to install
the TM RCC satircase

Toe- board width is less


Its should be 150 mm
than as per standard
Railings in the each landing
platform are not interconnected Railing need to be
with each other ( At 13+12 =25 interconnected with end to end
Loaction)
ACTION BY Remarks

Ashwin Bijaniya 12+12 TM & Mixer


Ashwin Bijaniya

Ashwin Bijaniya 2 Loaction in TM


Ashwin Bijaniya 1 Location in TM

Ashwin Bijaniya
Ashwin Bijaniya 13 Mixr &12 TM
Summary of Emergency Satircase
Sr. No Location Finding

1 TM Tower 25

2 Mixer Tower 27