You are on page 1of 1

ENERGY FIJI LIMITED

SPC DIVISION
MEMORANDUM

Land Management Unit


Attention: Mr. Luke Vauvau (Wayleaves Officer).
To: Ref.: SR109-21
Mr. Etuate Mataitini (Manager Landowners
Affairs)
From: Graduate Engineer Date: 10-08-21
Subject: Addressing Transformer T2980 Overloading issue in Vatulaulau, Ba

District: Ba
Description: Addressing Transformer T2980 Overloading issue in Vatulaulau, Ba
Scheme No.: SR 109-21
Client Name: -
Contact: -

The Scope of work is to upgrade existing single phase transformer to 30kVA single phase transformer on the
existing EFL pole (Pole ID: W27375& W27369) and string 1phase low voltage helium conductor between EFL poles
marked W27370 & W27369 to address transformer (T2980) overloading issue.

We kindly request you to provide comments to confirm the need for wayleave consent on the Design Team’s
Transformer upgrade works under this scheme as per the attached preliminary design and scope of work. Should
there be any issue or any further clarification required on the subject you are requested to immediately contact
the undersigned.

Designation Name Date Signature


Graduate Engineer Ronish Chandra
Team Leader D&P Kaushal M
Engineer Mohammed Zainal
Manager-NDP Basant Kumar
Check List:
1. Design Showing Location of the project Scheme area. YES
2. Drawings with multiple pages to be numbered X and X/Y NO
3. Space Required 5m x 4m on Developers Property NO
4. FRA Form NO
Other Comments:

 Google Earth view is attached


 Please visit the site to check the subject area as all of the work will be done on the existing network.

Lands Unit

Name of Receiving Officer:…………………………………………………………..

Date memo Received:……………………………………………

Signature of Officer Receiving the Memo:…………………………….