are Positioned Back to Back Lug Connection with Pillar Box Base M12 Bolt and Nut(Full Set) Pillar Box Typical Tall Vented Bi-Metallic Lugs Positioned Back to Back Note: 1.Concrete mix is 25MPA Grade VOID 450 493 700 2.Allow 2 weeks for Curing time After Pouring 3.To be Installed on Compacted Soil 450 493 700 4x210mm Galvanized 50 Threaded Rod 50 Double Layer M6 Steel Mesh Concrete Base Reinforcement 100 200 50.0 Welded to Reinforcement Ground Level Ground Level 50 150.0 100.0 493 Concrete Base 700 From Previous P.B To Next P.B Notes: 1. All Cables to be Aluminium 2. All Lugs to be Bi-Metallic (Crimp Lugs) Front View Rear View 3. All Bolts & Nuts to be Zinc 4. Aluminox Electrical Paste to be used on all crimp connections Device Fuses 5. Pitch tape/PVC tape and Phase Indication tape/Heat Sleeve to be used on all connections 6. All connections to be 300mm above ground level (A) 7. Bi-Metallic Lugs Positioned Back to Back 8. All Dimensions are in mm X12 Holes Back Entry Wiring X3 Fuses For Each Lot Consumer N/L 9. All MV/LV Cable Terminations inside the pillar box shall be done as per EFL Regulatory (N) Team Requirements. PILLAR BOX Electrical Panel Typical Single Phase P.B Wiring Diagram ENGINEERING CONTRACTOR DESIGNED DESIGN CHK SCALE DEVELOPER: PROJECT: DRAWING TITLE: HS HS NTS ENGINEERING & POWER SOLUTIONS GENERAL ELECTRICAL ENGINEERING, CIVIL, MECHANICAL & INSTALLATION SERVICES CHALLENGE ENGINEERING LTD. Challenge Residential Subdivision PILLAR BOX INSTALLATION WIRING DRAFTED DRAFTING CHK ISSUE DATE DS DS 22-04-2021 Commercial, Industrial, Hotel/ Resorts, Infrastructure & Developments FIJI PTE. LTD Electrical Reticulation 49 Vitogo Parade P O Box D110 Email : epowersolutionsltka@gmail.com - DRAWING NO. REVISION Lautoka City Lautoka Phone : (+679 836 3334/ 836 5288 REV DESCRIPTION BY DATE CEL-004 REV05 R5