You are on page 1of 1

PILLAR BOX INSTALLATION 10mm Busbar Packing

for gap created when Bi-Metallic Lugs


are Positioned Back to Back
Lug Connection with
Pillar Box Base M12 Bolt and Nut(Full Set)
Pillar Box Typical
Tall Vented Bi-Metallic Lugs
Positioned Back to Back
Note:
1.Concrete mix is 25MPA Grade VOID 450 493 700
2.Allow 2 weeks for Curing time
After Pouring
3.To be Installed on Compacted Soil
450
493
700
4x210mm Galvanized 50
Threaded Rod 50
Double Layer M6 Steel Mesh Concrete Base
Reinforcement 100 200 50.0
Welded to Reinforcement Ground Level
Ground Level 50 150.0
100.0
493
Concrete Base 700
From Previous P.B To Next P.B
Notes:
1. All Cables to be Aluminium
2. All Lugs to be Bi-Metallic (Crimp Lugs)
Front View Rear View 3. All Bolts & Nuts to be Zinc
4. Aluminox Electrical Paste to be used on all crimp connections
Device Fuses 5. Pitch tape/PVC tape and Phase Indication tape/Heat Sleeve to be used on all connections
6. All connections to be 300mm above ground level
(A) 7. Bi-Metallic Lugs Positioned Back to Back
8. All Dimensions are in mm
X12 Holes
Back Entry Wiring
X3 Fuses For Each Lot
Consumer
N/L
9. All MV/LV Cable Terminations inside the pillar box shall be done as per EFL Regulatory
(N)
Team Requirements.
PILLAR BOX Electrical Panel
Typical Single Phase
P.B Wiring Diagram
ENGINEERING CONTRACTOR DESIGNED DESIGN CHK SCALE
DEVELOPER: PROJECT: DRAWING TITLE:
HS HS NTS
ENGINEERING & POWER SOLUTIONS
GENERAL ELECTRICAL ENGINEERING, CIVIL, MECHANICAL & INSTALLATION SERVICES CHALLENGE ENGINEERING LTD. Challenge Residential Subdivision PILLAR BOX INSTALLATION WIRING DRAFTED DRAFTING CHK ISSUE DATE
DS DS 22-04-2021
Commercial, Industrial, Hotel/ Resorts, Infrastructure & Developments
FIJI PTE. LTD Electrical Reticulation
49 Vitogo Parade P O Box D110 Email : epowersolutionsltka@gmail.com - DRAWING NO. REVISION
Lautoka City Lautoka Phone : (+679 836 3334/ 836 5288
REV DESCRIPTION BY DATE CEL-004 REV05 R5