You are on page 1of 2

New Reinforced concrete

Doweled to existing structure


Ground beam Ref. General detail− Guard rail
0.45mm. Depth Approach length to be agreed on site with project manager
2,105 2,420
New Reinforced concrete
350 1,755 2,070 350
Doweled to existing structure 3,200 3,200

500

500

450 650
3,200
3,000

3,000
6,400

6,400
9,595 (Existing)
Stone pitching (rip rap)
erosion protection
3,200

1:50
500

500
350 1,755 8T12-C3-200 Extended Slab
2,070 350
2,105 2,420 27T12-C2-200

350
27T12-C1-200
33T10-C4-200 Stirrup
1,500

450
T12-B2-200

2Nos.Ø16mm. Dowel bar 10T12−C3−200 TB


300mm. 10T12-B1*-200
500
Ø16mm. Dowel bar 300mm.
Long. @ 450mm. staggered
both direction
Left side
ROAD 1:25
5,600 − L/L CL 5,715 − L/R 10T12-C7-200

Guard Rail
Ref. General details - Guard rail
2,420 350 27T12-C6-200
257.417 RFL 257.120 ERL
New Reinforced concrete 350 1,755 27T12-C5-200
Doweled to existing structure New Reinforced concrete
33T10-C8-200 Stirrup
900
650

Doweled to existing structure


350

350

Wing wall extended Wing wall extended


to new slab 805 1,300 1,500 920
to new slab
2,105 2,420 10T12−C7−200 TB
9,595−Existing Top Slab
2Nos.Ø16mm. Dowel bar
Ø16mm. Dowel bar 300mm.
300mm.
Long. @ 450mm. staggered
both direction
0.04% 0.04%
Left side

Guard Rail
Ref. General details - Guard rail Guard Rail
bolted to concrete structure. Ref. General details - Guard rail
2,070 bolted to concrete structure.
350
350 1,755

New Reinforced concrete


Doweled to existing structure New Reinforced concrete
650

900

Doweled to existing structure


350

350

Wing wall extended


to new slab 805 1,300 Wing wall extended
2,105 1,500 920 to new slab
2,420
Left side
Right side
1:25

Client: Contractor: Design Consultant: Project: Designed: Drawn: Tittle:

REPUBLIC OF LIBERIA Li − A.M


Kisuda, Concrete Box Culvert − CBX − BC15 1 x 3.0 x 3.0m
DESIGN, REHABILITATION AND MAINTENANCE OF General Arrangement
MINISTRY OF PUBLIC WORKS (MPW) RED LIGHT − GBARNGA − GUINEA BORDER
Checked: Approved:
He Fu, L.
Infrastructure Implementation Unit (IIU) Engineering and Management Consultants LOT 1 − (RED LIGHT −GATE 15 −GBARNGA) Scale: Date: Project No: Drawing No: Sheet:

South Lynch Street 1 17/10/14 General Revision


Rev Date Description Drawn Check. Appr.As Shown Oct. 2015 − LB−CBX−BC15−1 1 of 1 A1
C:\01.Project\01 GALAXY PROJECTS\Liberia Projects\1.Contracts\1.OPRC LOT_1 Redlght-Gbarnga\1.Drawings_On Going\6.Box Culvert\Box CuBC 15 ++.dwg
27T12-C2 27T12-C6

200

200
2.410m @200mm 2.740m @200mm

200

200
2,010 2,340

200 2,010 2,340

200
200

200
27T12-C1 27T12-C5
2.410m @200mm 2.740m @200mm
6300 6300

28T12-C3 30T12-C7
6.30m @200mm 6.30m @200mm

220
220

35T12-C8
2.280m @200mm

720
35T12-C4 54T12-B2
820
575

1.790m @200mm 2.480m @200mm

100 420

100

2000*
200

2*8T12-B1*
2.930m @200mm
730*

2320*
200

2*8T12-B1*
3.250m @200mm
730*

Client: Contractor: Design Consultant: Project: Designed: Drawn: Tittle:

REPUBLIC OF LIBERIA Li − A.M


Kisuda, Concrete Box Culvert − CBX − BC15 1 x 3.0 x 3.0m
DESIGN, REHABILITATION AND MAINTENANCE OF BAR BENDING SCHEDULE
MINISTRY OF PUBLIC WORKS (MPW) RED LIGHT − GBARNGA − GUINEA BORDER
Checked: Approved:
He Fu, L.
Infrastructure Implementation Unit (IIU) Engineering and Management Consultants LOT 1 − (RED LIGHT −GATE 15 −GBARNGA) Scale: Date: Project No: Drawing No: Sheet:

South Lynch Street Rev Date Description Drawn Check. Appr.As Shown Oct. 2015 − LB−BBS−BC15−1 1 of 1 A1
C:\01.Project\01 GALAXY PROJECTS\Liberia Projects\1.Contracts\1.OPRC LOT_1 Redlght-Gbarnga\1.Drawings_On Going\6.Box Culvert\Box CuBC 15 ++.dwg

You might also like