Professional Documents
Culture Documents
500
500
2000
TBL-403.965 m
1700
FSL-403.485 m
2800
150
00
50
CBL- 402.465 m
GL
300 1800
GL
2300
Cross Section of Duct
1600
10000
500 2050
1800
300
WALL
2350 Wing Wall
350
Expansion Tension SLAB
2500
6000
Bed Slope 1:400
1800
600
600
Contraction Tension Flow
Wing Wall (End Portion)
WALL
2200
350
2500
1000
350
500 350
10 mm Ø @ 150 c/c
1800
1500
12 mm Ø @ 150 c/c
1850
20
23 50
50
50
350
00
BOTTOM & TOP PLAN
2500 16 mm Ø @ 200 c/c
500
1800
1600
. .
500 GOVT OF M.P.WATER RESOURCE DEPTT
WATER RESOURCE DIVISION SHAHDOL-2
GL-400.510 . Skin Reinforcement 10 Ø
@ 200C/C Both way &
HALFAL NALL TANK SCHEME
2800
Both Face
GL- 399.561
3500
GL .
2700
KAUSHAL PRASAD PATEL
Foundation CONTRACTOR SAMAN REWA
Level- 396.315 m ELEVATION CHECKED & SUBMITTED BY APPROVED BY
300
2500
EXECUTIVE ENGINEER
SUB ENGINEER SUB DIVISIONAL OFFICER
WATER RESOURCE DIVISION
Abutment (A1 & A2) W.R. SUB DIVISION
SHAHDOL-2
JAISINGHNAGAR