30-0004950-A001_0.

dwg Steel Tunnel Formwork


2021-12-24
.

h/b = 594 / 841 mm


1500
1500
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


4853
00/180 VT 20K l= 2,90m VT 20K l= 2,90m
SLS 1
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

SL
S
3 2
VT 20K l= 2,90m VT 20K l= 2,90m

0/
42
0
1500 7000 1500 VT 20K l= 2,90m VT 20K l= 2,90m

SLS 260/360
SLS 260/360
VT 20K l= 2,90m VT 20K l= 2,90m

VKZ 99

3375
5000
5000
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

/180
VT 20K l= 2,90m VT 20K l= 2,90m
0
SLS 10
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

600
600
VT 20K l= 2,90m VT 20K l= 2,90m

Spindles
VT 20K l= 2,90m VT 20K l= 2,90m
4853
00/180 VT 20K l= 2,90m VT 20K l= 2,90m
SLS 1
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

SL
S
32
VT 20K l= 2,90m VT 20K l= 2,90m

0/
42
0
7000 VT 20K l= 2,90m VT 20K l= 2,90m

SLS 260/360
SLS 260/360
VT 20K l= 2,90m VT 20K l= 2,90m

VKZ 99

3375
5000
5000
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

Plywood
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

/180
VT 20K l= 2,90m VT 20K l= 2,90m
0
SLS 10
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT Girder

600
600

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


4853
0/180 VT 20K l= 2,90m VT 20K l= 2,90m
SLS 10
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


Typical Plan View

VT 20K l= 2,90m VT 20K l= 2,90m

Elevation View
SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

SL
S
3 2
VT 20K l= 2,90m VT 20K l= 2,90m

0/
42
0
7000 VT 20K l= 2,90m VT 20K l= 2,90m

SLS 260/360
SLS 260/360
VT 20K l= 2,90m VT 20K l= 2,90m

VKZ 99

3375
5000
5000

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


VT Hook Strap

VT 20K l= 2,90m VT 20K l= 2,90m

/180
VT 20K l= 2,90m VT 20K l= 2,90m
0
SLS 10
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

600
600

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


4853
0/180 VT 20K l= 2,90m VT 20K l= 2,90m
SLS 10
VT 20K l= 2,90m VT 20K l= 2,90m
Project : KPP-4.1 Tunnel

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


Steel Waler

SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m
SL
S
3 2

VT 20K l= 2,90m VT 20K l= 2,90m


0/
42
0

7000 VT 20K l= 2,90m VT 20K l= 2,90m

SLS 260/360
SLS 260/360

VT 20K l= 2,90m VT 20K l= 2,90m


VKZ 99

3375
5000
5000

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


SLS 100/180
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


0/180
SLS 10
VT 20K l= 2,90m VT 20K l= 2,90m

VT 20K l= 2,90m VT 20K l= 2,90m


6001500
1500

during concreting
To be installed while
moving the Table and

5850
1500 7000 1500

SLS 100/180

SL
S
14
0/2
40

0
0 /24
14
VT 20K l= 2,90m

S
1500

SL

SLS 100/180

0
/24 0
14 S
SL
1500

SL
Lowering Wedge

S
14
0/2
40
SLS 100/180

SL
S
14
Heavy duty Roller

0 /24
0
0
Typical Section

0 /24
VT 20K l= 2,90m

S 14
1500

SL

SLS 100/180
1:50
Scale
Project

Subject
Company

Tunnel

Drawing-no.
VARIO KIT
Prathima infra
KPP-4.1 Tunnel
R

55-0004102-A001
Reference Project

for offer purpose only!

1406, DLH Park

Mumbai 400 062


client

1
S.V. Road, Goregaon(W)

Sheet
Preliminary Drawing
PERI India Pvt. Ltd

0
Revision
drawn:

consent
checked:
E-mail: info@peri.in

Pavan Vedula
Name
Fax: +91 (22) 2872 2991

Milind Narnaware
Phone: +91 (22) 2876 7400

Copyright of this drawing and

made available to third persons,


especially competitors, without our
Date

associated documents are property of


PERI. They may not be reproduced or
Chain blocks to move formwork carriage by
Formwork is Designed for 1.50m thick Slab.