Professional Documents
Culture Documents
A A
1800
200
WTP 1800
COMPRESSION TEST ARRANGEMENTS FOR 1500 mm DIA. 1800 TOP PLATE
200
SECTION FOR
200
(PILE NO-P2-03, PIER-2, UNDER BRIDGE A HJR 9+932 to 10+112) 32 mmØ
(WORKING LOAD = 13,333.00 KN) DETAIL A SECTION FOR
(TEST LOAD = 20,000.00 KN)
DYWIDAG BAR 32 mmØ DYWIDAG BAR
(16 Nos.) DETAIL B DYWIDAG BAR
1800 TEST
1800 (16 Nos.)
BEAM
B STIFFENER BOTTOM PLATE B
TOP PLATE TOP PLATE
DETAIL B
MAIN BAR
DETAIL B HYDRAULIC JACK LOAD CELL
2x1500 TON 22-T32 mm
300 STIFNER
1800
1800
CONCRETE BLOCK
200
(FOR TEST BEAM SETUP) MAIN BAR 8 Nos.
TEST BEAM
22-T32 mm
300
DETAIL D BOTTOM PLATE
100
DYWIDAG BARS
PLATE
12mm THICK WELD
250
700
DETAIL E
CASING 16mm THICK
2000
2000
PLAN
100
Dial gauge 2 nos
100
1150
1150
1150
around the pile 12mm THICK WELD
700
WPL
PLAN DETAIL B TOP PLATE
1500
C 200 mm THICK C
900
900
1250
DETAIL A BOTTOM PLATE
CUT OFF LEVEL
Dial gauge 4 nos
around the pile 192.023 m 200 mm THICK W.P.L
P2 REACTION PILES
D BAR MARK BAR Ø BAR LENGTH No. OF BARS TOTAL No. WEIGHT
SECTION D
SHAPE CODE SHAPE No. MEMBER kg/M
2000
12000
2000
1800
SPIRAL B2 T32 00 12000 1 42 42 6.313 3181.752
42-T32 11+11-T32 42-T32 WELD
11+11-T32 B3 T32 00 6000 1 42 42 6.313 1590.876
25
300
A1 T12 77 12000 1 90 90 0.888 959.04
E E
STIFNER
A3 T25 75 3985 1 14 14 3.853 214.96 8 Nos.
1800
C1 T25 13 1050 1 4 4 3.853 16.183
PLAN
1600
1600
INNER RING 25 mm
2.0 m c/c
TOTAL FOR ONE PILE 9144.563
DETAIL C
Not matching
1.5m DIA RCC BORED
1500
100
CAST-IN-SITU PILES
Lap length to be REACTION PILE 3 44
4 .30
12000
12000
confirm
42 T32 11 +11 T32
E=399538.6466 SECTION FOR
42 T32
N=2797875.5304 DETAIL E
G E=399544.133 1500
G
25000
45
Ø1500.0146
00
.00
Ø1500.0000
Ø1500.0000
N=2797875.008
750 mm Dia Jack
4.26
25000
344
00
. 00
E=399545.4716
N=2797869.6633
1250
1250
4750
DETAIL E
11 +11 T25 JACK PLATE
TOE LEVEL TOE LEVEL
12.000
167.92 m 167.92 m
200
200
0.030
100 100 TOE LEVEL 100 100
1500 166.923m 1500
(TYP.) (TYP.) 0.050
J 100 100 J
1500
(TYP.)
4500 4500 0.050
SECTION 1-1 0.300 0.738 0.738 0.738 0.738 0.738 0.300 0.300 0.738 0.738 0.738 0.738 0.738 0.300 0.030
4500 4500
DYWIDAG BARS HYDRAULIC JACK DYWIDAG BARS
AA
DATE
26.12.2020
DESCRIPTION
VB PIO
ETIHAD RAIL NETWORK DRAWING TITLE
3. COORDINATES PROVIDED ARE WITH RESPECT TO
EJ - EXPANSION JOINT RAJ ETIHAD RAIL STAGE 2 & 3 PROJECT C0308 - PACKAGE 2D
PSA
CLIENT
WGS84 UTM 40 N & LEVELS ARE WITH RESPECT TO CL - CENTER LINE UNDERBRIDGE AT HJR 9+932 to 10+112
DMD S
NADD (NEW ABUDHABI DATUM) PSA- WORKING TEST PILE DETAILS
4. REFER TO GENERAL NOTES DRAWING:
C0308-S02-ECB-DG-31002. NADD
EGL - EXISTING GROUND LEVEL
- NATIONAL ABUDHABI DATUM
HJR COSMOS PILING
TEL. 04 5540504, 06 5482227 - FAX. 04 5540503, 06 5482278 DRAWN : RAJ CHECKED : VB APPROVED : PIO DATE:
KFK
info@cosmospiling.com www.cosmospiling.com
C
DESIGN DRAWING REFERENCE: - CENTER LINE OF ALIGNMENT SHEET No. 1OF 1 SCALE : AS SHOWN ORIGINAL SIZE : A1 26.12.2020
DM
PMC ENGINEER
- CENTER LINE OF TRACK CONTRACTOR'S REF. REV
C0308-DMD-ECB-DG-31025-AB
M M
DRAWING No: C308-DMD-ECB-DS-00020 AA
1 2 3 4 5 6 7 8
PRODUCED BY AN AUTODESK STUDENT VERSION 9 10 11 12 13 14 15 16