Date: Site/GP's Name GP/Scheme ID Block & District Name Pump Rating (HP) Installed Solar with 2 kWp Aux. Load (kWp) No. of Civil Foundations for Solar Structure (Nos) Date of Commissioning (Pump tested on solar load) Work Completion Date (with dressing & finishing)
S.N. Particulars Yes No Remarks
Civil packing : Gap B/w Civil foundation and column 1 post 2 Structure & Module's fastener tightening 3 Structure & Module alignment Dressings of DC strings with cable tie & DWC 4 conduits
5 Dressing U/G DC cable up to the automation panel
6 Cable route marker for U/G DC cable 7 AJB-1 for Pump (proper installed) 8 AJB-2 for 2 kWP Aux. load (proper installed) Earthling installation & connection from solar 9 structure, module to module and LA to respective earth pits. O&M Tools for cleaning of solar panels: Telescopic 10 wiper- 5 meter length, garden hose pipe with nozzle spray gun - 1 Nos. per site Survey reports, Design & documents of particular 11 sites Testing & Commissioning : Work Completion 12 Report (Enclosed) Handed over By: Taken Over By: [Solar I & C Agency] [Vindhya Telelinks Limited] Name: of I&C: Site Engineer Block Head / Area Manager