You are on page 1of 2

DAFTAR KUANTITAS DAN HARGA

Pemeliharaan Berkala Jalan Keramat Tete Rihia - Pelauw

Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
I. MATA PEMBAYARAN UMUM
A. SEWA TANAH M2 100.00 24,750.00 11.00 272,250.00 2,747,250.00
B. MOBILISASI PERALATAN
1. CONCRETE MIXER 0.3-0.6 M3 Unit 1.00 225,000.00 11.00 24,750.00 249,750.00
2. DUMP TRUCK 4 TON (2-3 M3) Unit 2.00 850,000.00 11.00 187,000.00 1,887,000.00
3. TANDEM ROLLER 6-8 T. Unit 1.00 14,500,000.00 11.00 1,595,000.00 16,095,000.00
4. WATER TANKER 3000-4500 L. Unit 1.00 850,000.00 11.00 93,500.00 943,500.00
5. ASPHALT SPRAYER Unit 1.00 450,000.00 11.00 49,500.00 499,500.00
C. LAIN-LAIN
1. Papan Nama Proyek Buah 1.00 500,000.00 11.00 55,000.00 555,000.00
2. Dokumentasi Paket 1.00 1,397,679.67 11.00 153,744.76 1,551,424.44
3. Pengukuran & Pemasangan BouwplanPaket 1.00 850,000.00 11.00 93,500.00 943,500.00
D. DEMOBILISASI PERALATAN
1. CONCRETE MIXER 0.3-0.6 M3 Unit 1.00 225,000.00 11.00 24,750.00 249,750.00
2. DUMP TRUCK 4 TON (2-3 M3) Unit 2.00 850,000.00 11.00 187,000.00 1,887,000.00
3. TANDEM ROLLER 6-8 T. Unit 1.00 14,500,000.00 11.00 1,595,000.00 16,095,000.00
4. WATER TANKER 3000-4500 L. Unit 1.00 850,000.00 11.00 93,500.00 943,500.00
5. ASPHALT SPRAYER Unit 1.00 450,000.00 11.00 49,500.00 499,500.00
II. MATA PEMBAYARAN PERKIRAAN BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
A. Keselamatan dan Kesehatan Kerja
1. Penyiapan RKK
a. Pembuatan Dokumen Rencana Keselem Set 1.00 400,000.00 0.00 0.00 400,000.00
b. Pembuatan Prosedur dan Instruksi Kerja
c. Penyiapan Formulir
2. Sosialisasi dan Promosi Dan Pelatihan
a. Papan Informasi K3 Buah 1.00 400,000.00 11.00 44,000.00 444,000.00
3. Alat Pelindung Diri (APD) terdiri atas
a. Topi pelindung (Safety helmet) Buah 19.00 55,000.00 11.00 114,950.00 1,159,950.00
b. Pelindung mata (Goggles, Spectacles)Psg 19.00 20,000.00 11.00 41,800.00 421,800.00
c. Pelindung pernafasan dan mulut (MasBox 19.00 20,000.00 11.00 41,800.00 421,800.00
d. Sarung tangan (Safety gloves) Psg 19.00 7,000.00 11.00 14,630.00 147,630.00
e. Sepatu keselamatan (Safety shoes)
e.1. Staf, dan Tamu Psg 5.00 400,000.00 11.00 220,000.00 2,220,000.00
e.2. Pekerja Psg 14.00 135,000.00 11.00 207,900.00 2,097,900.00
f. Rompi keselamatan (Safety vest) Buah 19.00 27,500.00 11.00 57,475.00 579,975.00
4. Asuransi dan Perizinan
a. Asuransi Paket 1.00 1,605,075.97 11.00 176,558.36 1,781,634.33
5. Personel K3 Konstruksi
a. Petugas K3 Paket 1.00 1,750,000.00 11.00 192,500.00 1,942,500.00
6. Fasilitas sarana kesehatan
a. Peralatan P3K (Kotak P3K, Tandu, ObSet 1.00 400,000.00 11.00 44,000.00 444,000.00
7. Rambu-rambu terdiri atas
a. Rambu Peringatan Pekerjaan di Jalan Buah 1.00 200,000.00 11.00 22,000.00 222,000.00
8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi
a. Ahli Keselamatan terkait Jalan Frekwens 1.00 750,000.00 11.00 82,500.00 832,500.00
9. Lain-lain terkait pengendalian risiko K3
a. Alat pemadam api ringan (APAR) Buah 1.00 700,000.00 11.00 77,000.00 777,000.00
III. MATA PEMBAYARAN PEKERJAAN UTAMA
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa (Manual) M3 38.30 52,030.00 11.00 219,202.39 2,211,951.39
3.2.(1a) Timbunan Biasa dari sumber galM3 40.40 217,527.70 11.00 966,693.10 9,754,812.18
DIVISI 6. PERKERASAN ASPAL
6.7.(1) Lapis Penetrasi Macadam, T = 5 M3 250.00 2,849,511.71 11.00 78,361,572.03 790,739,499.53
DIVISI 7. STRUKTUR
7.1 (8) Beton , fc15 Mpa M3 15.55 1,423,359.00 11.00 2,434,655.57 24,567,888.04
7.9.(1) Pasangan Batu M3 80.36 1,254,786.85 11.00 11,091,813.84 111,926,485.11
JUMLAH 998,240,000.00
Terbilang : Sembilan ratus sembilan puluh delapan juta dua ratus empat puluh ribu rupiah

Masohi, 15 Juni 2022

PENAWAR
CV. ABDILLA DWI KARYA

ABDULLAH LATUCONSINA
DIREKTUR

You might also like