You are on page 1of 1

RINCIAN BIAYA KEGIATAN TEKNIK PEMETAAN UNTUK PBB-P2 DI LEMBAGA PENDIDIKAN DAN PELATIHAN PURNAWARMAN BOGOR

BULAN AGUSTUS 2015 (24, 25, 26, SENIN-RABU)


√ √ √ √ √ √ √ √ √ √
No. Nama Jabatan SPPD (Rp) Lumpsum (Rp) Jumlah SPPD (Rp) Kontribusi (Rp) Tiket Nbx-Cgk (Rp) Tiket PP Sgp-Nbx (Rp) Damri Jkt-bogor Hotel 4 Malam (Rp) Jumlah Hasil Potongan (Rp)
1 Fulgensius Wiran, SE Kepala Dinas (Eselon II) 16,000,000.00 14,000,000.00 30,000,000.00 2,500,000.00 500,000.00 1,800,000.00 25,200,000.00
2 Alexander Manansang, S.Sos Kepala Bidang Pendapatan( Eselon III) 16,000,000.00 12,600,000.00 28,600,000.00 2,500,000.00 3,500,000.00 75,000.00 1,125,000.00 21,400,000.00
3 Yeheskiel Yogi, S.Sos Kasie Penerimaan Lain-Lain (Eselon IV) 16,000,000.00 11,200,000.00 27,200,000.00 2,500,000.00 3,500,000.00 75,000.00 1,125,000.00 20,000,000.00
4 Onny Dendegau, S.Sos Kasie Verifikasi dan Evaluasi (Eselon IV) 16,000,000.00 11,200,000.00 27,200,000.00 2,500,000.00 3,500,000.00 75,000.00 1,125,000.00 20,000,000.00
5 Deddy Abraham Kawer, S.Pt Kasie Perbendaharaan (Eselon IV) 16,000,000.00 11,200,000.00 27,200,000.00 2,500,000.00 500,000.00 900,000.00 23,300,000.00
6 Maklon Sani, A.md. Sos Kasie Pajak (Eselon IV) 16,000,000.00 11,200,000.00 27,200,000.00 2,500,000.00 3,500,000.00 75,000.00 1,125,000.00 20,000,000.00
7 Marieta A. Somar, A.Md Staf (Non Eselon) 16,000,000.00 9,100,000.00 25,100,000.00 2,500,000.00 500,000.00 900,000.00 21,200,000.00
8 Antonius Somatua Kum Staf (Non Eselon) 16,000,000.00 9,100,000.00 25,100,000.00 2,500,000.00 3,500,000.00 75,000.00 1,125,000.00 17,900,000.00
9 Anang W. Cendramadi, SP Ptt/Kontrak 16,000,000.00 7,700,000.00 23,700,000.00 2,500,000.00 3,500,000.00 75,000.00 1,125,000.00 16,500,000.00
10 Suhadianca, SE Ptt/Kontrak 16,000,000.00 7,700,000.00 23,700,000.00 2,500,000.00 3,500,000.00 75,000.00 1,125,000.00 16,500,000.00
11 Ratnawati, SE Ptt/Kontrak 16,000,000.00 7,700,000.00 23,700,000.00 2,500,000.00 3,500,000.00 75,000.00 1,125,000.00 16,500,000.00
12 Desiana M. Borlak, A.Md Ptt/Kontrak 16,000,000.00 7,700,000.00 23,700,000.00 2,500,000.00 3,500,000.00 75,000.00 1,125,000.00 16,500,000.00
13 Onny Virginia Zonggonau Ptt/Kontrak 16,000,000.00 7,700,000.00 23,700,000.00 2,500,000.00 3,500,000.00 75,000.00 1,125,000.00 16,500,000.00
Jumlah 208,000,000.00 128,100,000.00 336,100,000.00 32,500,000.00 36,500,000.00 0.00 750,000.00 14,850,000.00 251,500,000.00

Ket.
1. Biaya Hotel 4 Malam Per Org Rp. 900.000,00 (Per Org 1 Malam Rp. 225.000) Untuk 12 Orang
2. Hitungan PTT/ Org Dari Standar Biaya 2015 Lumpsum Rp. 1.100.000,00/ Hari
3. Tiket Nbx-Cgk Per Org Rp. 3.500.000,00
4. √ (Sudah Jelas)
5. Warna (Kuning) Tidak Mengikuti Kegiatan
6. Masuk Hotel Amaris Bogor Tanggal 23 Malam (Minggu Malam)
7. Transportasi Datang Bandara Soetta Ke bogor Via Damri per org Rp. 75.000 (Tiba di Mall Botani Square Bogor)
8. Transportasi Pulang Bogor ke Soetta Via Damri Per org Rp. 75.000 (Tiba Bandara Soetta)
9. Transportasi PP dari Mall Botani Square - Hotel (Pihak Penyelenggara Kegiatan)
10. Tarif Hotel Amaris Bogor Type Smart Double Room atau 1 Tempat Tidur Per Malam Rp. 450.000
11. Tarif Hotel Amaris Bogor Type Smart Twin Room atau 2 Tempat Tidur Per Malam Rp. 450.000

You might also like