AMG Inbound Process

AMG – Asset Operation

08/09/2020
Inbound Process Summary

Dismantle On Site (include packaging) Request Inbound Schedule Inbound to AMG WH

| 14 September 2020 | 2
Dismantle On Site
Dismantle On Site

• Create TaskID On NETGear Website


Before Site Visit • Assign TaskID to engineer

• Dismantle material
On Site • Tag or scan dismantle material

Before Request
• Make sure approval1 already approved
Plan Inbound

| 14 September 2020 | 4
Dismantle On Site General Rules
1. Photo on NETGear should be material label/part number (previously whole material), if label/PN not
exist please create dummy PN and marked it on each material.
2. All dismantled material should be marked as “MOVING” in NETGear android (propose to NETGear
team as default for task movement)
3. Mark each material with taskID
4. If there’s more than 1 , please chose the label with main equipment remark
5. Packing material as packaging standard criteria, preferably using ex-box new material (minimum
bubble wrap and carton box)
6. Follow Asset Operation catalog when tagging material

| 14 September 2020 | 5
Good Packaging

RF Antenna Cabinet

Module MW Antenna

Battery

| 14 September 2020 | 6
Unproper Packaging
RF Antenna MW Antenna Battery Module

| 14 September 2020 | 7
How to create dummy PN

1. Login to NETGear android.


2. Go to taskID that you want to work in.
3. Select Equipment Tab.
4. Click on material that you want to scan
5. Click “open spare part explorer” button
6. Type detail material in the search box
7. Select description that match/similar to the
actual material

| 14 September 2020 | 8
Material with Multiple Label
1. ODU
For ODU, use PN
which have main
material information
(Freq, Sub band and
Tx)

| 14 September 2020 | 9
Material with Multiple Label
2. Filter / Combiner

Use PN which have detail


material information

| 14 September 2020 | 10
Material with Multiple Label
3. RF Antenna

Use PN from OEM

| 14 September 2020 | 11
Material with Multiple Label
4. RBS Cabinet

Use PN starting with “BFM”,


because “BYB” and “BFZ” are the
frame of the cabinet

| 14 September 2020 | 12
Material with Multiple Label
5. FMR Module
1. FSME Core 3. FAN

2. FPFB
Scan material 1 and 2
only, for FAN in FMR
doesn’t need scan

| 14 September 2020 | 13
Request Inbound Schedule
Request Inbound Schedule

• Make sure to use this format in


Sent email to email
AMG
• Plan inbound release every friday
AMG release • All inbound request after Friday
plan inbound will be put on next week schedule

| 14 September 2020 | 15
Email Format
Site ID /
Task ID Task ID Site Name / WH
RAN / Non Vendor Project Project Activity Asset WH ID
(netgear) (netgear) Divisi PM Indosat PM Vendor Requester Regional Area Site ID Site Name System Subsystem ATF Status Name
RAN Dismantle Name Category Type Status (Destinatio
Origin Destination (Destination)
n)

WH SOV Site to WH
20200904 JABODET CIMANG PANCAKA DISMANTL DISMANT On Ex- W H DAAN
PANCA NON RAN Jabodeta M Nizar Gandhi S Sairin DEPOK 03DPK006 CME SHELTER W arehou DAAN
00527835 ABEK GIS_MALL RSA E IBS LE Progress Dismantle MOGOT
KARSA bek se MOGOT
WH SOV Site to WH
20200713 JABODET 03CBN09 CILEUNGS PANCAKA DISMANTL DISMANT On Ex- W H DAAN
PANCA NON RAN Jabodeta M Nizar Gandhi S Sairin BOGOR CME SHELTER W arehou DAAN
00547835 ABEK 2 I_MALL RSA E IBS LE Progress Dismantle MOGOT
KARSA bek se MOGOT

| 14 September 2020 | 16
Inbound to AMG WH
Inbound to AMG WH
Follow Inbound Group by Get Inbound Approval on
Plan taskID Pass NETGear

• Make sure all inbound are • All material must be group • Detail inbound material • Review approval1 for
following inbound per taskID will be available in taskID destination on
schedule • Every inbound must be inbound pass NETGear website
• Inbound not following plan supervised by vendor that • Inbound pass must be • Make sure all shortage
from AMG will be rejected understand the material sign by vendor and WH material have a
• Vendor must bring detail team justification before you
taskID material when • Before leaving the approve the taskID
inbound warehouse make sure • All shortage material will
vendor get a copy of be claimed in quarterly
inbound pass basis
| 14 September 2020 | 18
(soft/hardcopy)
Grouping Material per taskID

Grouping material per taskID is vendor responsibility.


DHL team will provide the pallet and forklift for unloading process.

| 14 September 2020 | 19
Issue Inbound to WH AMG
1. Inbound without proper packaging
2. Material inbound without label
3. Didn't bring proper document on inbound
4. Material not set as “Moving” in origin
5. Different PN between NETGear data and actual material
6. Arrived in WH after 3 PM
7. Vendor only sent mover that didn’t know how to group the
material based on taskID

| 14 September 2020 | 20
Q2 Shortage Finalization
Summary Shortage Q2 - EID
Sum of qty Material Status
vendor AMG Status Equipment Category NOT EXIST Grand Total
PT ERICSSON INDONESIA Done Reinbound ACCESSORIES 2 2
CABLE 2 2
MODULE 6 6
Pole.Mounting.Bracket 4 4
Done Reinbound Total 14 14
EID Claimed material HO to ISAT Regional MODULE 45 45
Pole.Mounting.Bracket 3 3
EID Claimed material HO to ISAT Regional Total 48 48
EID Claimed material lost on site ACCESSORIES 8 8
CABLE 4 4
MODULE 6 6
Pole.Mounting.Bracket 11 11
EID Claimed material lost on site Total 29 29
Waiting Reinbound ACCESSORIES 4 4
CABINET 3 3
CABLE 17 17
MODULE 17 17
Pole.Mounting.Bracket 1 1
Waiting Reinbound Total 42 42
Confirmed Inbound ACCESSORIES 7 7
MODULE 12 12
MW ANTENNA 16 16
Confirmed Inbound Total 35 35
Material still on site/not dismantled BATTERY 4 4
MODULE 1 1
Material still on site/not dismantled Total 5 5
EID Claimed wrong tagging in taskID Origin MODULE 1 1
EID Claimed wrong tagging in taskID Origin Total 1 1
Waiting EID Confirmation ACCESSORIES 1 1
MODULE 4 4
Waiting EID Confirmation Total 5 5
PT ERICSSON INDONESIA Total 179 179

| 14 September 2020 | 22
Detail Shortage Q2 - EID
TaskID Origin TaskID Destination site_id_ori site_id_destination Warehouse Vendor NE Major Equipment Brand part_number pnx_serial_num Description flag_wa Qty UoM Material AMG
Name Code Equipment Category ste Status Status

Waiting
PT BTS EID
WH DHL ERICSSON SYSTEM - ERICSSO Confirma
2020042402476911 2020051302068026 01JKS196 03WDHL01 Cibarusah INDONESIA LTE RBS 6000 MODULE N KDU137569/1 BR82470561 DUG 20 01 no 1 PCS NOT EXIST tion

MICROWA Waiting
PT VE SYSTEM EID
WH DHL ERICSSON - FLEXI ACCESSORIE T5571U11.07- waste20200405124 Confirma
20200405026310818 2020050901158026 06TBH003 05WDHL01 MEDAN INDONESIA TPM PACKET S NOKIA 10 3 Coupler 7 Ghz no 1 PCS NOT EXIST tion

MICROWA Waiting
PT VE SYSTEM EID
WH DHL ERICSSON - FLEXI FLEXIPACKET Confirma
20200305021510818 2020050801478026 05MDN080 05WDHL01 MEDAN INDONESIA TPM PACKET MODULE NOKIA RY112617827 HUB 800 1+1 no 1 PCS NOT EXIST tion

MICROWA Waiting
PT VE SYSTEM EID
WH DHL ERICSSON - FLEXI T555800MB.0 FLEXIPACKET Confirma
20200411116310818 2020042503808026 05WEID03 05WDHL02 MEDAN INDONESIA TPM PACKET MODULE NOKIA 0-A3 MF134802407 HUB 800 1+1 no 1 PCS NOT EXIST tion

WH DHL MICROWA Waiting


Medan PT VE SYSTEM EID
Manurung ERICSSON - FLEXI T555800MB.0 FLEXIPACKET Confirma
20200407064110818 2020062510288026 05WDHL03 05WDHL03 No.14 INDONESIA TPM PACKET MODULE NOKIA 0--A3B MF141500524 HUB 800 1+1 no 1 PCS NOT EXIST tion

| 14 September 2020 | 23
Thank You