You are on page 1of 2

GENERAL MOPO (MOPO - Matrix Of Permitted Operations)

Master has final judgement. This is only a guideline for operation.


All TASKS listed below are subject to a prior task risk assessment.

Permitted Conditional Not Permitted

Potential for Trainee


Sea Sea Sea Wind local Poor Hours operator Fishing
Supply Supply Chase Chase
State State State Speed Lightning squalls or Visibility of allowed to Engine Shipping Shallow vessels / Security Ice
TASKS Risk sudden Darkne participate
vessel vessel
failure Hazards Water fishing Risk Presence
Boat Boat Transit Emergency
while under present absent Present Absent
<2m >2m, <4m >4m >30knots changes in <500m ss nets
weather Supervision

Close approaches to fixed installations


PTW required
2 2 2 2 2 2 6 6 6 6 6 6 6
Confined Space Entry
PTW required
6 6
Deck Crane Use
PTW required
6 6 6
Deployment or Recovery of In-Sea
equipment 6 6 6 6 6 6 6 6 6 6 6 6 7
Source
Deployment or Recovery of In-Sea
equipment 6 6 6 6 6 6 6 6 6 6 6 6 7
Deflectors
Deployment or Recovery of In-Sea
equipment 6 6 6 6 6 6 6 6 6 6 6 6 7
Streamers and Anciliaries
Electrical maintenance
PTW required
6
Helicopter operations 1 1 1 1 1 1 1 6 6 6 6 6 6 6 6 6
Hot Work in areas outside of designated
welding shop 6 6 6 6 6 6 6
PTW required

Refueling at Sea - Alongside - PTW required


- The approach and making fast of the vessels 9 9 3 9 9 9 9 9
shall only be carried out during daylight hours

Refueling at Sea - Inline - PTW required -


The securing of towlines and connection of the
fuel line shall only be carried out during daylight
9 9 6 9 9 9 9 9
hours

Repair or maintenance of safety critical


equipment
6 6 6 6 6 6 6 6 6 6 6 6 6 6
task specific - PTW as required, ie: electrical
maintenance, through hull fitting

Vessel to vessel personnel transfers - Pilot


9 9 3 4 9 9 9 9 9 9
ladder

Vessel to vessel personnel transfers -


9 9 3 4 9 9 9 9 9 9
Gangway

Work on hull penetrating equipment


PTW required 6 6 6 6 6 6 6 6
Working at heights
PTW required 6 6 8 6 6 6 6
Diving Operations
PTW required
5 5 5 5 6 6 6 6 6 6 6
Engine maintenance 6 6 6 6
Emergency tow 9 9 9 9
Small boat training
PTW required 6 6 6 6

ADDITIONAL CONTROLS:
1 Master and Helo Pilot in agreement 4 Only in sheltered waters and no gear deployed 7 Recovery only
2 Master and OIM in agreement 5 Master in agreement with Supplier 8 Internal decks areas only
3 Only with no gear deployed 6 Master in agreement with Party Manager 9 Both Masters in Agreement

Note: Trainee participation in vessel to vessel transfer and helicopter operations will only take place when the trainee is crew changing

Revision 7, Last Updated 21-Nov-16


Table of Amendments
Rev. No Amendments Date of Approval Approved By
Changes made as per discussion (helo-pilot,
3 Master in agreement with Party Manager). 28-Dec-11 Chris Griffin
SIMOPS.
Changes made to clarify PTW requirements
4 27-Mar-13 Simon Hodgkinson
ref; Insite NCCAPA report AMA-366336.
Added - 8. Internal decks areas only
5 Working at Heights --Hours of Darkness 4-Nov-13 Jess Yeates
(changed to Orange).
Inclusion of Rule 9 removal of Sea States as
6 22-Sep-15 Simon Hodgkinson
requested, inclusion of Notes as shown above.
Vessel to vessel personnel transfers - Pilot
7 21-Nov-16 Simon Hodgkinson
ladder