Professional Documents
Culture Documents
ESTIMATE INFORMATION
Client Name:
Estimate Address:
COST DATA
Estimate Summary:
Material Labor Equipment
Base Total $ 5,127.20 $ 657.00 $ 774.00
Total O&P $ 5,045.60 $ 968.00 $ 752.00
*"Total" column values include the cost of Exception lines that may not be included in the Material, Labor and Equipment totals.
LEGEND
ESTIMATE
SubContracted
Quantity LineNumber Line Source
Ind.
8 051223174500
8 051223174500
16 051223650100
Grand Total
Type: Unit Notes:
Measurement System: US Standard
Catalog:
Total* Format:
$ 6,558.20 Release:
$ 6,765.60 Labor Type:
he Material, Labor and Equipment totals. City Cost Index:
Labor
Description Crew Daily Output Unit Material
Hours
Column, structural tubing, square, 4" x 4"
x 1/4" x 15'-0", incl shop primer, cap &
base plate, bolts E2 58 0.828 Ea. $ 337.50
Column, structural tubing, square, 4" x 4"
x 1/4" x 12'-0", incl shop primer, cap &
base plate, bolts E2 58 0.828 Ea. $ 270.00
Steel plate, structural, for connections &
stiffeners, 1/4" T, shop fabricated, incl
shop primer 0 0 S.F. $ 16.70
COST ESTIMATE REPOR
$ - $ - $ 16.70 $ 267.20 $ - $ -
Ext. Labor
Ext. Total Mat. O&P Labor O&P Equip. O&P Total O&P Ext. Mat. O&P
O&P
$ - $ 293.60 OPN
$ 752.00 $ 6,765.60
Columnas 4x4x1/4