You are on page 1of 1

1 2 3 4 5 KEY PLAN

PLOT LIMIT

IT

PL

Pr
IM

O
L

in
T
T

ce
LI
O

M
PL PROJECT LOCATION

IT

Fa
isa
l Ib
nB
an
da
r Ib
nA
bd
ula
ziz
King Khaled International

Rd
Airport Housing Complex

.
LEGEND

700

700
20mmØ LOOP CONDUIT FOR LIGHTING FIXTURES INSIDE SLAB
L mm
L 20mmØ LOOP CONDUIT FOR BETWEEN TWO SWITCHES UNDER F.F.L

1800

1800
1160

1160
20mmØ CONDUIT CONNECTION FOR SWITCH TO FIXTURE AT CEILING SLAB
2070 2070
m m
20mmØ ELECTRICAL HOMERUN CONDUIT UNDER F.F.L

2090

2090
n n
MASTER MASTER
BEDROOM BEDROOM INTERMEDIATE SWITCH

10A,SP ONE WAY ONE GANG LIGHTING SWITCH


2120 2130 2130 2120
BEDROOM
n 2 BEDROOM n2
10A,SP ONE WAY TWO ONE GANG LIGHTING SWITCH

10A,SP ONE WAY THREE ONE GANG LIGHTING SWITCH


n n
10A,SP TWO WAY ONE GANG LIGHTING SWITCH

200

200
m m

2100

2100
j q,r,k q,r,k j
200 200
10A,SP TWO WAY TWO GANG LIGHTING SWITCH

900

900
900

900
PANTRY 1100 1100 1100 1100 PANTRY (R1) RECESSED LIGHTING OUTLET,10W LED,230V,IP20
j j
e e
630 MASTER BR MASTER BR 630 (R2) RECESSED LIGHTING OUTLET,12W LED,230V,IP44
K DRESSING DRESSING K

900

900
(R3) RECESSED LIGHTING OUTLET,45W LED,230V,IP44

1900

1900
200

200
e e
(S1) SURFACE MOUNTED LIGHTING OUTLET,20W LED,230V,IP20

800

800
810

810
BLOCK WALL BLOCK WALL
460 k k k k 460
620 620
PLUMBING e MASTER BR. r r MASTER BR. e PLUMBING (W1) WALL MOUNTED LIGHTING OUTLET,12W LED,230V,IP65
SHAFT LP-F/3 YEL q q LP-F/3 YEL SHAFT
BATH 460 460 BATH

800

800

800

800
3*2.5mm / 20mm PVC 3*2.5mm / 20mm PVC

500

500
EF-01 EF-01
conduit from ceilng conduit from ceilng
200 200 (W2) WALL MOUNTED LIGHTING OUTLET,12W LED,230V,IP20
J s s J (P1) WALL MOUNTED LIGHTING OUTLET,14W LED,230V,IP65

2800

2800
(P2) CHANDELIER PENDANT 100W (MAX),230VAC

1810

1810
OPEN TO SKY OPEN TO SKY (P3) CHANDELIER PENDANT 200W (MAX),230VAC

2070 FAMILY/LIVING 2070 2070 FAMILY/LIVING 2070


e e
ELECTRICAL BELL

BELL SWITCH

1810

1810
FINAL DISTRIBUTION BOARD

H H
20 21 22 23 24 25 26
27 27
26 25 24 23 22 21 20
NOTES

1390

1390
2*20MM CONDUIT UP TO SECOND 2*20MM CONDUIT UP TO SECOND
FLOOR AND DOWN TO FIRST FLOOR AND DOWN TO FIRST
20MM DOWN AND UP FLOOR FOR D SWITCH FLOOR FOR D SWITCH 20MM DOWN AND UP
FOR d SWITCH LP-G/3 YEL FOR d SWITCH
28 28 LP-G/3 YEL

150

150
k e e k
LP-F/5 BLUE LP-F/5 BLUE

600

600
d e
3*2.5mm / 20mm PVC d 29 29 d 3*2.5mm / 20mm PVC
e d
conduit from ceilng conduit from ceilng
BEDROOM 3
30 30 BEDROOM 3
2070 2070

1390

1390
k k

200
LP-F/1 RED
3*2.5mm / 20mm PVC
38 37 36 35 34 33 32 31 31 32 33 34 35 36 37 38200 LP-F/1 RED
3*2.5mm / 20mm PVC
c c
G conduit from ceilng a,b,h a,b,h conduit from ceilng
G ALL DIMENSIONS IN MILLIMETERS

800

800

800

800
2190

2190
450 BATH
1560 1 450 OTS 450 BATH 1
1560 450
k a a k
EF-01 EF-01
1190

1190
c c
1520 1520

b h h b

PLOT LIMIT
450

450
PLOT LIMIT

460 460

F F

450

450
460 460
b h h b 00 13 JUL 2020 SHOP DRAWING
1190

1190
1520 c c 1520
EF-01 EF-01
REV. DATE DESCRIPTION APPR'D
k a a k
BATH 1560
1 BATH 1
2190

OTS

2190
450 450 450 1560 450

800

800

800

800
E 3*2.5mm / 20mm PVC
conduit from ceilng
a,b,h
c c
a,b,h 3*2.5mm / 20mm PVC
conduit from ceilng
E
LP-F/1 RED 20038 37 36 35 34 33 32 31 31 32 33 34 35 36 37 38200 LP-F/1 RED

1390

1390
k k
2070 BEDROOM 3 BEDROOM 3 2070
30 30
d e 3*2.5mm / 20mm PVC 3*2.5mm / 20mm PVC e d
29 29
600

600
conduit from ceilng d d conduit from ceilng
LP-F/5 BLUE LP-F/5 BLUE
150

150
k e e k
20MM DOWN AND UP LP-G/3 YEL 28 28 LP-G/3 YEL 20MM DOWN AND UP
FOR d SWITCH 2*20MM CONDUIT UP TO SECOND 2*20MM CONDUIT UP TO SECOND FOR d SWITCH
FLOOR AND DOWN TO FIRST FLOOR AND DOWN TO FIRST

1390

1390
FLOOR FOR D SWITCH FLOOR FOR D SWITCH

27 27
20 21 22 23 24 25 26 26 25 24 23 22 21 20

D D
1810

1810
FAMILY/LIVING FAMILY/LIVING
e e
2070 2070 2070 2070

OPEN TO SKY OPEN TO SKY


1810

1810
2800

2800
s s
C 200 200
C
PLUMBING
3*2.5mm / 20mm PVC PLUMBING
3*2.5mm / 20mm PVC
500

500

EF-01 EF-01
800

800

800

800
conduit from ceilng
SHAFT conduit from ceilng
SHAFT
LP-F/3 YEL MASTER BR. 460 460 MASTER BR. LP-F/3 YEL
e BATH q r r q BATH e
BLOCK WALL 620 620 BLOCK WALL
k k
460 k k 460
810

810
800

800

e e
200

200
1900

1900
900

900

B 630
e
MASTER BR
DRESSING
MASTER BR
DRESSING e
630 B
j j
1100 1100 1100 1100
PANTRY PANTRY
900

900
900

900

Project
2100

2100
200 200
j q,r,k q,r,k j
200

200

m m
n n RIYADH AIRPORT 2 2
BEDROOM 2 BEDROOM 2
MURCIA PROJECT
n n
2120 2130 MASTER MASTER 2130 2120
BEDROOM BEDROOM
2090

2090

n n
m m
2070 2070
1160

1160 BUILDING
1800

1800

mm

A A PLEX 4F
700

700

FIRST FLOOR LIGHTING CONDUIT LAYOUT Drawing Title


SCALE: NTS

FIRST FLOOR LIGHTING LAYOUT


CLEAR COPY
Drawing Number SHEET NO.
IT
PL

LI
M
MUR-SD-TH-4F-EE-03-002
O
T

T
LI

O
1/1
M

PL
IT

PLOT LIMIT

DRAWN BY: SCALE:

1 2 3 4 5 CHECKED BY: DATE:

APPROVED BY: REV: