You are on page 1of 6

KEY PLAN

CL
30.50m CORRIDOR TR
02
6
A

A
15.25 15.25
7.30
TR
A 026

CARRIAGEWAY R0.5

R0.5
7.10 2.00 2.50 3.65 3.65 2.50 2.00 7.10

18.64
GRADED VERGE / LANDSCAPE FOOTPATH PARALLEL PARKING LANE LANE PARALLEL PARKING FOOTPATH GRADED VERGE / LANDSCAPE
9.90 9.90 N
8.90

R.O.W / BUILDING LINE


8.10
6.90 6.90
6.10 5.10
4.10 4.10

R.O.W / BUILDING LINE


3.35 3.40 NOTES:
2.15 2.20
1.20
0.50 1.20
2% 0.50
2%
2%

0.40 0.80
0.90

0.90

0.90
1.00

0.40 0.80
1.00

1.00

1.00
1.00
0.90
1.20

0.80

0.90
1.50

1.50
1.50
REFERENCES

1.50
DRAWING TITLE DRAWING No.

0.60 2.10 1.20 1.00 0.95 1.20 0.85 0.70


0.70 0.85 1.20 0.85 1.00 1.20 2.00 1.00 1.00 1.00

STREET LIGHTING
TRANSMISSION
IRRIGATION
IRRIGATION

SEWERAGE
SEWERAGE
DEWA(WD)

DEWA(HV)

MANHOLE
DEWA(LV)

IRRIGATION
SEWERAGE
ETISALAT

DEWA(WD)
MANHOLE

DEWA(HV)

DEWA(LV)
ETIC-Du

ETISALAT
ETIC-Du
(H.C)

S.W.D.

(H.C)
TYPICAL SERVICES RESERVATION CROSS SECTION LEGEND

FOR CORRIDOR WIDTH OF 30.50m

30.50
CORRIDOR
11.75 7.00 11.75
R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


OPEN AREA CARRIAGE WAY OPEN AREA
3.50 3.50
THROUGH LANE THROUGH LANE

9.70
8.25
10.75
4.70 4.70

3.50 2.85

2.85 1.00
01/Jul/2022
1.00 0.50

100430506

SECTION 7-7: TYPICAL SERVICES RESERVATION CROSS SECTION FOR CORRIDOR WIDTH OF 30.50m No. REVISION APP'D DATE

CLIENT
ROADS 2 & 3

30.50
CORRIDOR
EMPLOYER

R.O.W / BUILDING LINE


17.70

6.40 3.50 3.50 3.70 4.00 3.00 (VARIES) 6.40 (VARIES)


R.O.W / BUILDING LINE

FUTURE FOOTPATH / LANDSCAPE THROUGH THROUGH / U-TURN MEDIAN FUTURE FOOTPATH / LANDSCAPE
THROUGH LANE U-TURN BUFFER
(BY OTHERS) (BY OTHERS)
CONSULTANT

10.75
4.70
8.25
3.50
4.70
2.85
2.85 PROJECT TITLE
1.00
1.00
0.50 0.50 Pearl Jumeirah- 3 Guard Houses
Infrastructure Works
0.80
1.00

1.20
0.90

0.80
0.80
1.20

1.20
1.20

0.90
1.20

1.20
1.20
0.4

LOCATION DUBAI PLOT NO. -

0.4
BLOCK

0.60 DRAWING TITLE


1.00
0.60 0.80 2.50
1.70 1.20 0.80 0.60
1.20 2.50 1.00 TYPICAL UTILITY CROSS SECTION
1.70 (SHEET 01 OF 06)

NAME PROJECT STAGE

DESIGNED BY LM
TD
DEVELOPED BY LM PROJECT No.

COORDINATED BY -
CHECKED BY LM
DU21038
PROPOSED SECTION A-A VERIFIED BY MH SCALE AS PER SCALE BAR

DRAWN BY NAS DRWG. SIZE A1


APPROVED BY MAF DATE MAY 2022

DRAWING No.

N012
KEY PLAN

CORRIDOR WIDTH=15.250 m (50')

R.O.W / BUILDING LINE


2.125 2.50 6.00 2.50 2.125
FOOTPATH P.PARKING CARRIAGEWAY P.PARKING FOOTPATH B

ROW BUILDING LINE


TR
B027

TR
02
7 B R0.5

R0.5
6.15 6.60

18.64
3.275 N
CORRIDOR WIDTH=15.250M(50')
2.55
4.25
3.27
2.55 NOTES:

0.90 0.90
0.50 0.50
2% 2% 2% 2%

0.90

0.90
0.80
1.00

1.10
0.40 0.80

1.20
0.80
0.45

0.90
1.40

1.50

1.50
REFERENCES

0.40
DRAWING TITLE DRAWING No.
0.60 0.70 0.70 0.60
0.60 1.00
0.87 1.50 1.00 1.00
1.00 1.20 1.60
1.60

SEWERAGE(H.C)
SEWERAGE MH.
1.20

STREET LIGHTING

SEWERAGE(H.C)

DEWA(HV)

ETISALAT
DEWA(WD)

DEWA(WD)
DEWA(LV)

DEWA(LV)
ETISALAT

S.W.D

EITC-Du
TYPICAL SERVICES RESERVATION CROSS SECTION
LEGEND
FOR CORRIDOR WIDTH OF 15.25m

C
L 15.80

3.15 3.50 3.50 2.50 3.15


SIDEWALK / LANE LANE ALTERNATE SIDEWALK
LANDSCAPE PARKING / LANDSCAPE
/ SIDEWALK
/ LS CORRIDOR

R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


POTS WILL BE SET
ON PADS OF
INTERLOCKING
4.85
PAVERS
4.90 3.65
2.50
POTS LOCATION TO 2.55
BE CONFIRMED BY 1.80
LANDSCAPE 1.90 1.00
ARCHITECT 1.00 0.50
2.0% 2.0% 2.0% 2.0%

01/Jul/2022

100430506

SECTION 1-1: LOCAL ROAD X-SECTION (15.8m)


ROADS IR-1, IR-2, IR-5 (0+000 TO 0+440), IR-6, IR-7, IR-9, IR-10, IR-12 & IR-18 No. REVISION APP'D DATE

CLIENT

15.80
CORRIDOR
2.05 11.70 2.05
R.O.W / BUILDING LINE

LANDSCAPE (BY

LANDSCAPE (BY
4.00 3.70 4.00 EMPLOYER
FOOTPATH /

FOOTPATH /

R.O.W / BUILDING LINE


OTHERS)

OTHERS)
THROUGH LANE MEDIAN THROUGH/RIGHT LANE
FUTURE

FUTURE
CONSULTANT
4.85
4.90
3.65
2.55
2.50
1.90
1.80
1.00
1.00 PROJECT TITLE

0.50 0.50
Pearl Jumeirah- 3 Guard Houses
Infrastructure Works
0.80
1.00
1.20

1.00
0.90

0.90
0.80

0.80

1.20
1.20
1.20

1.20
0.4

0.4

LOCATION DUBAI PLOT NO. -


0.60 BLOCK

0.60 0.80 1.20 DRAWING TITLE


1.00 1.70 0.80 0.80 0.60
1.50 1.00
1.20 TYPICAL UTILITY CROSS SECTION
(SHEET 02 OF 06)

NAME PROJECT STAGE

DESIGNED BY LM
TD
DEVELOPED BY LM PROJECT No.

COORDINATED BY -
DU21038
PROPOSED SECTION B-B CHECKED BY LM
VERIFIED BY MH SCALE AS PER SCALE BAR

DRAWN BY NAS DRWG. SIZE A1


APPROVED BY MAF DATE MAY 2022

DRAWING No.

N013
KEY PLAN

CL
38.10m CORRIDOR

6.25 2.50 7.30 6.00 7.30 2.50 6.25


SIDEWALK/ LANDSCAPE PARALLEL CARRIAGEWAY CENTRAL MEDIAN CARRIAGEWAY PARALLEL SIDEWALK/ LANDSCAPE

C028
TR
8.20 PARKING PARKING C R0.5

R0.5

18.64
TR
C028
6.70 8.70

5.80
7.60 N
4.80 5.30

R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


3.30 3.90
1.80 1.50 2.40 NOTES:
0.90 0.90
0.50 0.50
2% 2%

0.50
2% 2%

0.80
0.90

0.4 0.80

1.20

0.40 0.80
1.00

0.90

1.00
0.90
1.20

1.20
1.50

1.50
1.50

1.50
1.50

1.50
1.00 0.60 1.10
3.00 1.20 0.70 0.60
1.00 1.20 1.50 0.90 0.90 0.50 1.80
1.00 1.00

IRRIGATION LINE
STREET LIGHTING
3.30
SEWERAGE 4.80

SEWERAGE
5.80
DEWA(WD)

DEWA(HV)

MANHOLE
DEWA(LV)

MANHOLE
ETISALAT
6.70
(H.C)

ETIC-Du

S.W.D.
8.20

SEWERAGE
SEWERAGE

DEWA(WD)
DEWA(HV)

DEWA(LV)
MANHOLE

MANHOLE

ETISALAT
ETIC-Du
TYPICAL SERVICES RESERVATION CROSS SECTION

(H.C)
S.W.D.
FOR CORRIDOR WIDTH OF 38.10m LEGEND

CL
38.10
6.25 2.50 3.65 3.65 6.00 3.65 3.65 2.50 6.25
SIDEWALK / LANDSCAPE ALTERNATE LANE LANE MEDIAN LANE LANE ALTERNATE SIDEWALK / LANDSCAPE
PARKING/ PARKING/
SIDEWALK/ SIDEWALK/
LS CORRIDOR LS CORRIDOR
7.90

4.05
R.O.W / BUILDING LINE

5.80

R.O.W / BUILDING LINE


2.95 2.00 2.95

1.10
2.0%
2.0% 2.0%
2.0%

01/Jul/2022

100430506

SECTION 8-8: COLLECTOR ROAD X-SECTION (38.1m)


ROAD 1

38.10 No. REVISION APP'D DATE

CORRIDOR CLIENT

25.00

R.O.W / BUILDING LINE


R.O.W / BUILDING LINE

7.30
CARRIAGE WAY
6.85 4.00 1.20 4.00 6.00 3.65 3.65 2.50 6.25
FUTURE FOOTPATH / LANDSCAPE THROUGH LANE CHECKING LANE MEDIAN THROUGH LANE THROUGH LANE NO PARKING FUTURE FOOTPATH / LANDSCAPE EMPLOYER
SEPARATOR

(BY OTHERS) (BY OTHERS)


9.05
7.90
7.90
5.80
5.80 CONSULTANT
4.05
2.95 4.05
2.95
2.11
2.00 2.10
1.10
1.10
PROJECT TITLE
0.50
0.50

Pearl Jumeirah- 3 Guard Houses


0.80

0.80
1.00

1.20
0.90

Infrastructure Works
1.20

0.80
1.20

1.00

0.90
1.20

1.20
1.20

1.20
1.20
1.20

1.20
0.4

0.4
LOCATION DUBAI PLOT NO. -
1.00 0.60
0.60 1.00 1.20 1.00 1.00 1.00 0.60 BLOCK
2.50 1.00 2.00 1.70 2.50 1.00 1.20 DRAWING TITLE

1.70
TYPICAL UTILITY CROSS SECTION
(SHEET 03 OF 06)

NAME PROJECT STAGE

DESIGNED BY LM
TD
DEVELOPED BY LM PROJECT No.

COORDINATED BY -
CHECKED BY LM
DU21038
VERIFIED BY MH SCALE AS PER SCALE BAR

DRAWN BY NAS DRWG. SIZE A1


APPROVED BY MAF DATE MAY 2022
PROPOSED SECTION C-C
DRAWING No.

N014
KEY PLAN

CORRIDOR WIDTH=15.250 m (50')

R.O.W / BUILDING LINE


2.125 2.50 6.00 2.50 2.125

C028
TR
FOOTPATH P.PARKING CARRIAGEWAY P.PARKING FOOTPATH

ROW BUILDING LINE


C R0.5

R0.5
6.15 6.60

18.64
TR
C028
3.275 N
CORRIDOR WIDTH=15.250M(50')
2.55
4.25
3.27
2.55 NOTES:

0.90 0.90
0.50 0.50
2% 2% 2% 2%

S.W.D
0.90

0.90
0.80
1.00

1.10
0.40 0.80

1.20
0.80
0.45

0.90

SEWERAGE(H.C)
1.40

1.50

1.50
0.40
0.60 0.70 0.70 0.60
0.60 1.00
0.87 1.50 1.00 1.00
1.00 1.20 1.60
1.60
1.20

SEWERAGE(H.C)

SEWERAGE MH.
STREET LIGHTING

DEWA(HV)
DEWA(WD)

DEWA(WD)
DEWA(LV)

DEWA(LV)
ETISALAT

EITC-Du
TYPICAL SERVICES RESERVATION CROSS SECTION LEGEND

FOR CORRIDOR WIDTH OF 15.25m

C
L
15.80

3.15 3.50 3.50 2.50 3.15


SIDEWALK / LANE LANE PARKING SIDEWALK
LANDSCAPE / LANDSCAPE

R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


7.00
POTS WILL BE
4.85
SET ON PADS OF
INTERLOCKING 4.85
4.90 PAVERS 3.65
2.55 2.50
POTS LOCATION TO
BE CONFIRMED BY 1.90 1.80
LANDSCAPE 1.00 1.00
ARCHITECT 0.50
2.0% 2.0% 2.0%

01/Jul/2022

100430506

SECTION D-D: LOCAL ROAD X-SECTION (15.8m)


ROAD IR-12 No. REVISION APP'D DATE

CLIENT

15.80
CORRIDOR
4.10 10.10 1.60
FUTURE FOOTPATH / FUTURE EMPLOYER

LANDSCAPE (BY FOOTPATH /


3.50 0.60 3.50 2.50 LANDSCAPE
OTHERS)
THROUGH LANE THROUGH LANE PARKING/ (BY OTHERS)
R.O.W / BUILDING LINE

LANDSCAPE

R.O.W / BUILDING LINE


MEDIAN

CONSULTANT
7.00
4.90
4.85
2.55 3.65
1.90 2.50
1.80
1.00 PROJECT TITLE
1.00
0.50
0.50
Pearl Jumeirah- 3 Guard Houses
Infrastructure Works
0.80
1.00
1.20
0.90

1.00

0.90
0.80

1.20
1.20
1.20

1.20

1.20
0.4

LOCATION DUBAI PLOT NO. -


0.4

BLOCK
0.60
0.60 0.80 1.20 DRAWING TITLE
1.00 1.70 1.70 0.80 0.80 0.60
1.50 1.00
1.20 TYPICAL UTILITY CROSS SECTION
(SHEET 04 OF 06)

NAME PROJECT STAGE

DESIGNED BY LM
TD
DEVELOPED BY LM PROJECT No.

COORDINATED BY -
CHECKED BY LM
DU21038
VERIFIED BY MH SCALE AS PER SCALE BAR

DRAWN BY NAS DRWG. SIZE A1


APPROVED BY MAF DATE MAY 2022
PROPOSED SECTION D-D DRAWING No.

N015
KEY PLAN

C028
TR
C R0.5

R0.5

18.64
TR
C028
N

NOTES:

NO TYPICAL R.O.W

LEGEND

6.13
EXISTING JUNCTION SIDEWALK / LANDSCAPE

R.O.W / BUILDING LINE


7.00

4.85
3.65
2.50

1.80
1.00

2.0%
2.0%

01/Jul/2022

100430506

SECTION E-E
No. REVISION APP'D DATE

CLIENT

5.00 2.22 EMPLOYER

R/A ISLAND R/A FUTURE


FOOTPATH /

R.O.W / BUILDING LINE


LANDSCAPE
(BY OTHERS)
7.00
4.85 CONSULTANT

3.65
2.50
1.80
1.00 PROJECT TITLE

0.50
Pearl Jumeirah- 3 Guard Houses
Infrastructure Works
1.00

0.90
0.80

1.20
1.20

1.20
1.20

0.4

LOCATION DUBAI PLOT NO. -

BLOCK
1.20
1.70 0.80 0.80 0.60 DRAWING TITLE
1.50 1.00
TYPICAL UTILITY CROSS SECTION
(SHEET 05 OF 06)

NAME PROJECT STAGE

DESIGNED BY LM
TD
DEVELOPED BY LM PROJECT No.

COORDINATED BY -
CHECKED BY LM
DU21038
VERIFIED BY MH SCALE AS PER SCALE BAR

DRAWN BY NAS DRWG. SIZE A1


PROPOSED SECTION E-E APPROVED BY MAF DATE MAY 2022

DRAWING No.

N016
KEY PLAN

C028
TR
C R0.5

R0.5

18.64
TR
C028
N

NOTES:

NO TYPICAL R.O.W

LEGEND

6.23
EXISTING JUNCTION SIDEWALK / LANDSCAPE

4.90

R.O.W / BUILDING LINE


2.55

1.00

2.0%
01/Jul/2022 2.0%

100430506

SECTION F-F
No. REVISION APP'D DATE

CLIENT

5.00 2.29
R/A ISLAND R/A FUTURE
FOOTPATH /

R.O.W / BUILDING LINE


LANDSCAPE EMPLOYER

(BY OTHERS)

4.90
2.55 CONSULTANT

1.80
1.00
0.50

PROJECT TITLE
1.20

1.00

0.90
0.40 0.80
1.20

Pearl Jumeirah- 3 Guard Houses


Infrastructure Works

1.70 1.20 LOCATION DUBAI PLOT NO. -


1.00 0.80 0.60 BLOCK

DRAWING TITLE

TYPICAL UTILITY CROSS SECTION


(SHEET 06 OF 06)

NAME PROJECT STAGE

DESIGNED BY LM
TD
DEVELOPED BY LM PROJECT No.

COORDINATED BY -
CHECKED BY LM
DU21038
VERIFIED BY MH SCALE AS PER SCALE BAR
PROPOSED SECTION F-F DRAWN BY NAS DRWG. SIZE A1
APPROVED BY MAF DATE MAY 2022

DRAWING No.

N017

You might also like