You are on page 1of 1

LEGENDS AND SPECIFICATIONS

Shift outlets to
column as this area Receptacle,230V,1 Phase,60Hz
S0 1 2 3 4 5 6 7 have LCC8Panels 9 10 S11
will
of GIS
Receptacle,230V,3 Phase,60Hz
(RCB)
a a
A
Receptacle,460V,3 Phase,60Hz
To Second floor To Second floor
460V,3 Phase 230V,3 Phase (RCB)
Distribution Board Distribution Board
b PF-2 PF-1

50mm dia.IMC (Empty)

2 # 3.5 sq mm THHN and 1 #3.5


c c
sq.mm THHN ground in 25mm dia.
IMC.
PF-2 PF-1
5 4

To Second floor
Panelboard: 230V,3 Phase,60 Hz.
230V,3 Phase
Distribution Board

dc

FIRST FLOOR POWER OUTLET LAYOUT


SCALE N/A
Please confirm not Please confirm 0.30.
falling with EHV Seems very low.
S0 1 2 3 4 5 6 7 8 9 10 S11
Cable should be around 1.2
NOTES:
or 1.5
1. 16A and 63A Receptacle box shall
be 1.5m above finish floor level.For
a a 15A receptacle box shall be 0.30
A
To Second floor To Second floor
above finish floor level.
460V,3 Phase 230V,3 Phase

b
Distribution Board Distribution Board 2. All boxes for outlets shall be of
PB-2 PB-1
galvanized iron approved
products of reputable
manufacturers.
3. All junction boxes, pull boxes and
c c blank boxes shall be fitted with
standard flat metal cover.
4. All boxes including junction and
pull boxes shall be of sufficient
size to provide free space for all
PROJECT: SAN MARCELINO 230KV GIS SUBSTATIONDistribution
To Second floor
230V,3 Phase
Board
conductors enclosed in the box,
in addition to the Wirings such as
NE No Exceptions Noted switch mechanism and
receptacles that may be place
therein.

EN Exceptions Noted

RC Required Correction
BASEMENT FLOOR POWER OUTLET LAYOUT
SCALE N/A
FI For Information SCALE
OWNER'S ENGINEERS OWNER

R
SANTA CRUZ SOLAR ENERGY, INC. DRAWING NUMBER:
R ADDRESS: BRGY. SANTA FE, SAN MARCELINO, ZAMBALES
CONTRACTOR REV:
Approval does not relive the contractor for his liabilities and responsibilities concerning
NO DATE REVISIONS AND RECORD OF ISSUE DRNDES CHK PDE APP
SAN MARCELINO - 230KV GIS SUBSTATION
GIS BUILDING POWER OUTLET PLAN - BASEMENT & FIRST FLOOR THIS SHEET:

compliance with the contractual requirements and system completion.

mah78833 14-Oct-2022 07:16:15 P409748 71.0000 5-C900391 P. 1/1 St:EN 10/14/22 MS-00241

You might also like