1 2 3 4 5 6 7 8 9 10 11 12

A A

UPS 1 SWITCH
BY PASS
MCB 16A
B B
F4 LVMDB PANEL Q1 NYYHY 3x2.5mm SPARE
R S T BY-PASS LINE
SCADA RCC FLORES MCB 16A
Q2 NYYHY 3x2.5mm MEJA ENGINEER-1
MCB 16A
OUTPUT
INPUT UPS-1 RECTIFIER INVERTER 220VAC,1Ph Q3 NYYHY 3x2.5mm PANEL SERVER PDU-1
MCCB 100A 4P F1 ~ F2 50Hz MCB 16A
=
NYYHY 4x10mm
= ~ Q4 NYYHY 3x2.5mm MEJA OPERATOR-1
INPUT FROM PANEL NYYHY 4x10mm
INPUT
= MCB MCB 16A
MDP RCC FLORES FUSE OUTPUT Q5 NYYHY 3x2.5mm DISPLAY-1
OUT OF SCOPE MCB STS
INPUT UPS-2 CHARGER MCB 16A
MCB
MCCB 100A 4P = BATTERY F3 Q6 NYYHY 3x2.5mm SPARE
MCB 16A
=

F1-3 3A
NYYHY 4x10mm
Q7 NYYHY 3x2.5mm PANEL WORKSTATION PDU-1
C MCB 16A C
Q8 NYYHY 3x2.5mm MEJA PRINTER
MCB 16A
BATTERY Q9 NYYHY 3x2.5mm PANEL DISPLAY CONTROL PDU-1
(DC) MCB 16A
NYYHY 4x10mm
MCCB 100A Q10 NYYHY 3x2.5mm DISPLAY-2
MCB 16A
Grounding UPS 2 SWITCH Q11 NYYHY 3x2.5mm SPARE
BY PASS MCB 16A
Q12 NYYHY 3x2.5mm MEJA ENGINEER-2
F4 MCB 16A
Q13 NYYHY 3x2.5mm PANEL SERVER PDU-2
BY-PASS LINE
MCB 16A
D Q14 NYYHY 3x2.5mm MEJA OPERATOR-2 D
MCB 16A
RECTIFIER INVERTER
F2 Q15 NYYHY 3x2.5mm DISPLAY-3
F1 ~ =
= ~
INPUT
= MCB
OUTPUT
FUSE OUTPUT
MCB STS 220VAC,1Ph
CHARGER
MCB 50Hz
= BATTERY F3

E BATTERY E
(DC)

Grounding

F F

WIRE DUCT 40X60

UPS-1 UPS-2

WIRE DUCT 60X60

RST

WIRE DUCT 60X60


WIRE DUCT 60X60

G Ground
G

WIRE DUCT 40X60

DESCRIPTION TITLE OBJECT APPROVE BY


H
DRAWN BY CHECK (DIRECTOR) DRAWN NO.
SCHEMATIC WIRING DIAGRAM DATE 20/01/2023 SKALA NTS
H

DATE DESCRIPTION NAME


UPS & PANEL LVMDB PAGE 01 REVISI 00
DEV.

A1
1 2 3 4 5 6 7 8 9 10 11 12

You might also like