QUERIES AND CLARIFICATIONS (EOI STAGE)

GRANT-9210 IND: Delhi-Meerut RRTS Project - Tranche 1 - JFPR1 Consultant for improved mobility and economic
empowerment of women, children, elderly, and differently abled in Uttar Pradesh along the Delhi-Meerut RRTS Corridor
(Outputs 1 and 2) (51073-003)

S. No. Clause No. in TOR Clause Query Response


1 N/A N/A Please confirm on the maximum There is no maximum number of
number of participants that can take participants that can take part as a
part as a consortium for the given consortium. However, when expressing
EoI interest, the consortium must nominate
and authorize one firm as the lead firm,
which will be the sole representative that
will interact directly with the recruiting
party.

2 Provisional Sums $359,133 Since it is not elaborated upon, we "Provisional Sums" consist of cost
seek clarifications on what purpose estimates made by the Client for non-
can be served from this provisional competitive parts of the bid. They usually
sum? Can the consultant cover costs which the consulting firm
incorporate this sum also while would administer on behalf of the Client,
preparing the proposal? What is the but for which no competitive quote is
actual purpose of this sum? expected at the time of the initial bidding
and which will not be considered as part of
any financial evaluation. Provisional sums
generally cover items such as equipment,
workshops, seminars and studies, surveys,
or similar expenses.

These will be elaborated during the


Request for Proposal (RFP) stage, after
the EOI stage. Only shortlisted firms will
receive the request for proposal,
containing detailed instructions and cost
estimates.

The consultant, when requested to submit


proposal, will incorporate this sum in the
proposal.
S. No. Clause No. in TOR Clause Query Response
3 Contingency $3,540 Since it is not elaborated upon, we Contingency is estimated by the Client to
seek clarifications on what purpose cover currency fluctuations and/or potential
can be served from this provisional changes in the scope of the assignment.
sum? Can the consultant
incorporate this sum also while The consultant, when requested to submit
preparing the proposal? What is the proposal, will incorporate this sum in the
actual purpose of this sum? proposal.

4 23. Task 5: (ix) To facilitate trainees for Since the consultant must envisage No minimum amount but must meet the
their travel for trainings and a stipulated stipend for the trainees, basic requirements for travel and
to provide refreshments is there any parameter or minimum refreshments during training.
during sessions, the amount for the stipulated stipend to
Consultant may envisage a be given to the trainees. No required/preferred method for providing
stipulated stipend during stipend to trainees. But this must be pre-
the training period for each Also, please elaborate on how the approved by the Client and be properly
trainee. The amount of consultant provide the stipend to documented.
stipend is to be covered the trainees. Do the consultant
under the cost per trainee need to perform bank transfer?
while submitting proposal
5 23. Task 5: (x) Additionally, the Consultant Since the consultant is required to The procurement and installation of CCTV
shall also be providing install CCTV in the vehicles, please will be covered under a separate package.
smartphones to certain confirm whether this cost of Hence, during the RFP stage, this will not
identified e-rickshaw drivers procurement and installment of be included in the proposal. TOR is revised
and install CCTV in the CCTVs has to be included while for clarity.
vehicles to ensure safety preparing the proposal
among women e-rickshaw
drivers. The smartphones
shall have a provision of an
emergency button which
will be connected to a
police station to alert the
police if there is a
harassment incident.
Procurement of the smart
phones shall be undertaken
by the Client in consultation
with ADB and henceforth
provided to the Consultant
for distribution. However,
S. No. Clause No. in TOR Clause Query Response
specifications to procure
smartphones by the Client
and the criteria to identify
the beneficiaries shall be
examined and finalized at a
later stage once the
trainings of e-rickshaws are
completed
6 24. Task 6: (i) The Consultant shall Please confirm whether the During the RFP stage, costs for these
organize at least 2 gender consultant need to include the cost gender awareness events must be
awareness events in for organizing these events or the included in the proposal.
schools and/or colleges client will provide separate funds for
with an aim to generate the same
awareness and discussion
among the students. It will
have a participatory
approach from different
classes
7 25. Task 7: (i) Following from item 18 (i) Please confirm whether the During the RFP stage, costs related to
d1, the Client shall procure consultant must factor in the logistics for the distribution of assistive aids
the assistive aids and logistical cost for distribution of must be included in the proposal.
provide them to the these assistive aids? Or will the
Consultant. Upon receiving client arrange for all logistics for the
assistive aids from the distribution?
Client, the Consultant shall
organize at least 5
programs/events (with
minimum of 200
beneficiaries in every
event) at different sites and
arrange for the required
logistics for the same.
8 25. Task 7 (iv) For trainings, the Since the qualifications and The Consultant should employ trainers
Consultant is mandated to experience about these trainers are with experience in training that is suitable
ensure appropriate not provided, please confirm to the needs of differently abled persons.
accessible training whether the consultant is free to This is subject to approval of the Client
infrastructure and training employ general experienced before mobilization.
tools suitable to the needs trainers?
of differently abled persons.
S. No. Clause No. in TOR Clause Query Response
Also, since specialized
training is required to be
imparted, therefore, it is
essential for the Consultant
to engage experienced
trainers and shall utilize the
most compatible training
content and pedagogy
9 27. Task 9: (i) Referring from 18(i) c, the Please confirm whether the During the RFP stage, costs for these
Consultant shall conduct consultant need to include this training sessions must be included in the
employability training training cost while preparing the proposal.
sessions among at least proposal?
400 (desirable up to 900)
female students following
the National Skills
Qualification Framework
(NSQF)
10 27. Task 9: (ii) While the specific Please confirm whether the During the RFP stage, costs for these
vocational programs for consultant need to include this training sessions must be included in the
which employability skills training cost while preparing the proposal.
training shall be imparted to proposal?
female students shall be
identified during the survey
(based on industry needs
and contemporary market
demands), the Consultant
is to ensure that in case of
multiple vocational course
preferences by the
beneficiaries, maximum 3
different vocational courses
can be undertaken based
on choice of majority of
female students
11 27. Task 9: (vi) To facilitate trainees for Since the consultant must envisage No minimum amount but must meet the
their travel for trainings and a stipulated stipend for the trainees, basic requirements for travel and
to provide refreshments is there any parameter or minimum refreshments during training.
during sessions, the amount for the stipulated stipend to
Consultant may envisage a be given to the trainees.
S. No. Clause No. in TOR Clause Query Response
stipulated stipend during No required/preferred method for providing
the training period for each Also please elaborate on how the stipend to trainees. But this must be pre-
trainee. The amount of consultant provide the stipend to approved by the Client and be properly
stipend is to be covered the trainees. Do the consultant documented.
under the cost per trainee need to perform bank transfer?
while submitting the
proposal
12 27. Task 9: (viii) Share information about Please confirm whether the During the RFP stage, costs for these job
various government consultant need to undertake the fairs must be included in the proposal.
schemes on grants, loans, cost for organizing at least 5 job-
and germane schemes to mela while preparing the proposal
start their own ventures by or cost for the same shall be borne
organizing at least 5 job by the client?
fairs/mela.
13 N/A N/A We request the authority to extend The call for expressions of interest is
the due date of submission to at extended until 29 August.
least 1 week after clarification of the
queries. This will provide sufficient
duration to the consultants to make
an affective proposal
14 Selection Method Quality and cost-based We request the authority to clarify This will be clarified during the RFP stage.
selection (QCBS) the criteria for QCBS evaluation. Is
it 60:40 or 70:30?