Surface BOP Vertical Well Kill Sheet (API Field Units)
FORMATION STRENGTH DATA: SURFACE LEAK -OFF PRESSURE FROM FORMATION STRENGTH TEST(A) psi MUD DENSITY AT TEST (B) ppg MAXIMUM ALLOWABLE MUD DENSITY = (A) (B) + = (C) ppg (SHOE T.V. DEPTH x 0.052) INITIAL MAASP = ( ( C ) - CURRENT MUD DENSITY) x SHOE T.V. DEPTH x 0.052 = psi M. DEPTH PUMP NO. 1 DISPL. PUMP NO. 2 DISPL. bbls / stroke bbls / stroke HOLE DATA: (PL) DYNAMIC PRESSURE LOSS [psi] SLOW PUMP PUMP NO. 1 PUMP NO. 2 RATE DATA: SPM SPM PRE-RECORDED LENGTH CAPACITY VOLUME DATA: feet bbls / foot DRILL PIPE x = HEAVY WALL DRILL PIPE x = DRILL COLLARS x = DRILL STRING VOLUME (D) DC x OPEN HOLE x = DP / HWDP x OPEN HOLE x = OPEN HOLE VOLUME (F) DP x CASING x =(G) TOTAL ANNULUS VOLUME (F+G)(H) TOTAL WELL SYSTEM VOLUME (D+H) ACTIVE SURFACE VOLUME (J) TOTAL ACTIVE FLUID SYSTEM(I +J) DATE : NAME : CURRENT WELL DATA:
strokes Min bbls strokes Min bbls strokes Min bbls strokes bbls strokes Dr No SV 04/01 (Field Units) 27-01-2000 International Well Control Forum DATE : Surface BOP Kill Sheet - Vertical Well (API Field NAME Units) : KICK DATA : SIDPP psi SICP
KILL MUD DENSITY CURRENT MUD DENSITY
(TVD x 0.052) KMD 0................. INITIAL CIRCULATING DYNAMIC PRESSURE LOSS + SIDPP PRESSURE 0................. ICP FINAL CIRCULATING x DYNAMIC PRESSURE LOSSKILL MUD DENSITY PRESSURE CURRENT MUD DENSITY FCP x ................. = (K) = ICP - FCP = ................... - 0................... (E) STROKES PRESSURE [psi] STATIC&DYNAMICDRILLPIPEPRESSURE[psi]