You are on page 1of 2

DATE :

International Well Control Forum


Surface BOP Kill Sheet - Vertical Well (S.I. Units) NAME :

FORMATION STRENGTH DATA: CURRENT WELL DATA:


SURFACE LEAK -OFF PRESSURE FROM
FORMATION STRENGTH TEST (A) kPa

DRILLING FLUID DENSITY AT TEST (B) kg/m3

MAX. ALLOWABLE DRILLING FLUID DENSITY = CURRENT DRILLING FLUID:


(A)
(B) + = (C) kg/m3 DENSITY kg/m3
SHOE T.V. DEPTH x 0.00981

INITIAL MAASP =
((C) - Current Density) x 0.00981 x Shoe TVD CASING SHOE DATA:
= kPa SIZE mm

M. DEPTH m
PUMP NO. 1 DISPL. PUMP NO. 2 DISPL. T.V. DEPTH m

m3 / stroke m3 / stroke

HOLE DATA:
(PL) DYNAMIC PRESSURE LOSS
SIZE mm
SLOW PUMP
PUMP NO. 1 PUMP NO. 2
RATE DATA: M. DEPTH m

T.V. DEPTH m
SPM kPa kPa

SPM kPa kPa

PRE-RECORDED LENGTH CAPACITY VOLUME PUMP STROKES TIME


VOLUME DATA: m m3 / m m3 stks minutes

DRILL PIPE x =
VOLUME PUMP STROKES
HEAVY WALL DRILL PIPE x = +
PUMP DISPLACEMENT SLOW PUMP RATE
DRILL COLLARS x = +

DRILL STRING VOLUME (D) l (E) stks min

DC x OPEN HOLE x =

DP / HWDP x OPEN HOLE x = +

OPEN HOLE VOLUME (F) l stks min

DP x CASING x = (G) + stks min

TOTAL ANNULUS VOLUME (F+G) = (H) l stks min

TOTAL WELL SYSTEM VOLUME (D+H) = (I) l stks min

ACTIVE SURFACE VOLUME (J) l stks

TOTAL ACTIVE FLUID SYSTEM (I +J) l stks


Dr No SV 03/01
(S.I.-0.00981)
29-01-2003
DATE :
International Well Control Forum
Surface BOP Kill Sheet - Vertical Well (S.I. Units) NAME :

KICK DATA :
SIDPP kPa SICP kPa PIT GAIN m3

KILL FLUID DENSITY SIDPP


CURRENT DRILLING FLUID DENSITY +
TVD x 0.00981
................. + = kg/m3
KMD

INITIAL CIRCULATING DYNAMIC PRESSURE LOSS + SIDPP


PRESSURE
................. + ................. = kPa
ICP

KILL FLUID DENSITY


FINAL CIRCULATING x DYNAMIC PRESSURE LOSS
CURRENT DRILLING FLUID DENSITY
PRESSURE
FCP x ................. = kPa

(K) x 100
(K) = ICP - FCP kPa --.--------- = kPa/100 strokes
(E)

STROKES PRESSURE
[kPa]
STATIC & DYNAMIC DRILL PIPE PRESSURE [kPa]

STROKES
Dr No SV 03/02 (S.I.-0.00981) 29-01-2003

You might also like