You are on page 1of 19

Surface BOP Kill Sheet (S.I.

Units) Date ###


.
Vertical Well
Name

(A) FORMATION STRENGTH DATA (B) CURRENT WELL DATA


SURFACE LEAK-OFF PRESSURE FROM
FORMATION STRENGTH TEST (A1) 1750 kPa
SICPP

SIDPP
DRILLING FLUID DENSITY AT TEST (A2) 1470 kg/m3
CURRENT DRILLING FLUID
INITIAL MAX. ALLOWLABE DRILLING DENSITY =
DENSITY (B1) 1140 kg/m3
Surface Leak-Off Pressure
= Fluid Density at Test + =
Shoe T.V. Depth x g

(A1) 1750
= (A2) 1470 + = (A3) = 1626 kg/m3
(B4) 1145 x 0.00981
INITIAL MAX. ALLOWLABE ANNULAR SURFACE PRESSURE =
CASING SHOE DATA
= (Initial Max. Allowlable Drilling Density - Curent Density) x Shoe T.V. x g =
DIAMETER (B2) 244 mm
=( (A3) 1626 - (B1) 1140 ) x (B4) 1145 x 0.00981 =
M. DEPTH (B3) 1810 m
= (A4) = 5457 kPa
T.V. DEPTH (B4) 1145 m
(C) PUMPS DATA
PUMP NO.1 DISPLACEMENT PUMP NO.2 DISPLACEMENT

0.0205 m 3 /stroke 0.0205 m3 /stroke

DYNAMIC PRESSURE LOSS (DPL)


SLOW PUMP RATE DATA
PUMP NO. 1 PUMP NO. 2 HOLE DATA

30 SPM 860 kPa 780 kPa DIAMETER (B5) 215 mm

40 SPM 1100 kPa 1070 kPa M. DEPTH (B6) 1880 m

PUMP
DISPLACEMENT SLOW PUMP RATE
DYNAMIC PRESSURE T.V. DEPTH (B7) 1155 m
SELECT LOSS
- SPM kPa
m 3 /stroke
1 (C1) 0.0205 (C2) 40 (C3) 1100

(D) PRE-RECORDER VOLUME DATA

PUMP STROKES = TIME =


LENGTH CAPACITY VOLUME Volume Pump Strokes
= =
Pump Displ. (C1) Pump Rate (C2)
m strokes minutes
m3 m m3
DRILL PIPE from SURFACE to BHA (B6) - (D1) - (D2)= 1718 x 0.00926 = (D3) 15.91 (D15) 776 19
HEVI WALL DRILL PIPE (D1) 81 x 0.00461 = (D4) 0.37 (D16) 18 0
DRILL COLLAR (D2) 81 x 0.00397 = (D5) 0.32 (D17) 16 0
DRILL STRING VOLUME (D3)+(D4)+(D5) = (D6) 16.60 (D18) 810 20
DRILL COLLAR in OPEN HOLE (D2)= 81 x 0.01100 = (D7) 0.89 (D19) 43 1
DRILL PIPE/HWDP in OPEN HOLE (B6) - (B3) - (D2)= -11 x 0.06330 = (D8) -0.70 (D20) -34 -1
OPEN HOLE VOLUME (D7)+(D8) = (D9) 0.19 (D21) 9 0
DRILL PIPE in CASING (B3)= 1810 x 0.06400 = (D10) 115.84 (D22) 5651 141
TOTAL ANNULUS VOLUME (D9)+(D10) = (D11) 116.03 (D23) 5660 142
TOTAL WELL SYSTEM VOLUME (D6)+(D11) = (D12) 132.64 (D24) 6470 162
ACTIVE SURFACE VOLUME (D13) 3.00 (D25) 146 4
TOTAL ACTIVE FLUID SYSTEM (D12)+(D13) = (D14) 135.64 (D26) 6617 165
(E) KICK DATA
SHUT IN DRILL PIPE PRESSURE SHUT IN CASING PRESSURE PIT GAIN

SIDPP (E1) = kPa SICP (E2) = kPa (E3) = m3

(F) KILL FLUID DENSITY


SIDPP
KFD = Curent Drilling Fluid Density + =
Hole T.V. Depth x g
(E1) 0
= (B1) 1140 + = (F1) 1140 kg/m3
(B7) 1155 x 0.00981

(G) INITIAL CIRCULATING PRESSURE

ICP = DPL+ SIDPP = (C3) 1100 + (E1) 0 = (G1) 1100 kPa

(H) FINAL CIRCULATING PRESSURE

KFD (F1) 1140


FCP = x DPL = x (C3) 1100 = (H1) 1100 kPa
Curent Drilling Fluid Density (B1) 1140

(I) GRAPHIC DATA

ICP - FCP ( (G1) 1100 - (H1) 1100 ) x 100 kPa


Line Slant = = = (O1) 0
Drill String Volume 100 stk
(D18) 810

(J) VARIATION OF PRESSURE

VOLUME PRESSURE
12
strokes kPa

1 0 1100
2 100 1100
3 200 1100
10
4 300 1100
5 400 1100
6 500 1100
7 600 1100 8
kPa

8 700 1100
9 800 1100
Static & dynamic drill pipe pressure

10 810 1100
11 810 1100 6

12 810 1100
13 810 1100
14 810 1100
4
15 810 1100
16 810 1100
17 810 1100
18 810 1100
2
19 810 1100
20 810 1100
21 810 1100
22 810 1100 0
23 810 1100 0 5 10 15 20 25 30
Pumped volume strokes
24 810 1100
Surface BOP Kill Sheet (S.I. Units) Date ###
.
Vertical Well
Name

(A) FORMATION STRENGTH DATA (B) CURRENT WELL DATA


SURFACE LEAK-OFF PRESSURE FROM
FORMATION STRENGTH TEST (A1) 4000 kPa
SICPP

SIDPP
DRILLING FLUID DENSITY AT TEST (A2) 1250 kg/m3
CURRENT DRILLING FLUID
INITIAL MAX. ALLOWLABE DRILLING DENSITY =
DENSITY (B1) 1250 kg/m3
Surface Leak-Off Pressure
= Fluid Density at Test + =
Shoe T.V. Depth x g

(A1) 4000
= (A2) 1250 + = (A3) = 1759 kg/m3
(B4) 801 x 0.00981
INITIAL MAX. ALLOWLABE ANNULAR SURFACE PRESSURE =
CASING SHOE DATA
= (Initial Max. Allowlable Drilling Density - Curent Density) x Shoe T.V. x g =
DIAMETER (B2) 340 mm
=( (A3) 1759 - (B1) 1250 ) x (B4) 801 x 0.00981 =
M. DEPTH (B3) 801 m
= (A4) = 4000 kPa
T.V. DEPTH (B4) 801 m
(C) PUMPS DATA
PUMP NO.1 DISPLACEMENT PUMP NO.2 DISPLACEMENT

0.0205 m 3 /stroke 0.0205 m3 /stroke

DYNAMIC PRESSURE LOSS (DPL)


SLOW PUMP RATE DATA
PUMP NO. 1 PUMP NO. 2 HOLE DATA

30 SPM 950 kPa 900 kPa DIAMETER (B5) 216 mm

40 SPM 1500 kPa 1550 kPa M. DEPTH (B6) 1291 m

PUMP
DISPLACEMENT SLOW PUMP RATE
DYNAMIC PRESSURE T.V. DEPTH (B7) 1291 m
SELECT LOSS
- SPM kPa
m 3 /stroke
2 (C1) 0.0205 (C2) 40 (C3) 1550

(D) PRE-RECORDER VOLUME DATA

PUMP STROKES = TIME =


LENGTH CAPACITY VOLUME Volume Pump Strokes
= =
Pump Displ. (C1) Pump Rate (C2)
m strokes minutes
m3 m m3
DRILL PIPE from SURFACE to BHA (B6) - (D1) - (D2)= 1106 x 0.01158 = (D3) 12.81 (D15) 625 16
HEVI WALL DRILL PIPE (D1) 56 x 0.00580 = (D4) 0.32 (D16) 16 0
DRILL COLLAR (D2) 129 x 0.00256 = (D5) 0.33 (D17) 16 0
DRILL STRING VOLUME (D3)+(D4)+(D5) = (D6) 13.46 (D18) 657 16
DRILL COLLAR in OPEN HOLE (D2)= 129 x 0.01520 = (D7) 1.96 (D19) 96 2
DRILL PIPE/HWDP in OPEN HOLE (B6) - (B3) - (D2)= 361 x 0.02128 = (D8) 7.68 (D20) 375 9
OPEN HOLE VOLUME (D7)+(D8) = (D9) 9.64 (D21) 470 12
DRILL PIPE in CASING (B3)= 801 x 0.06277 = (D10) 50.28 (D22) 2453 61
TOTAL ANNULUS VOLUME (D9)+(D10) = (D11) 59.92 (D23) 2923 73
TOTAL WELL SYSTEM VOLUME (D6)+(D11) = (D12) 73.38 (D24) 3580 89
ACTIVE SURFACE VOLUME (D13) 3.00 (D25) 146 4
TOTAL ACTIVE FLUID SYSTEM (D12)+(D13) = (D14) 76.38 (D26) 3726 93
(E) KICK DATA
SHUT IN DRILL PIPE PRESSURE SHUT IN CASING PRESSURE PIT GAIN

SIDPP (E1) = kPa SICP (E2) = kPa (E3) = m3

(F) KILL FLUID DENSITY


SIDPP
KFD = Curent Drilling Fluid Density + =
Hole T.V. Depth x g
(E1) 0
= (B1) 1250 + = (F1) 1250 kg/m3
(B7) 1291 x 0.00981

(G) INITIAL CIRCULATING PRESSURE

ICP = DPL+ SIDPP = (C3) 1550 + (E1) 0 = (G1) 1550 kPa

(H) FINAL CIRCULATING PRESSURE

KFD (F1) 1250


FCP = x DPL = x (C3) 1550 = (H1) 1550 kPa
Curent Drilling Fluid Density (B1) 1250

(I) GRAPHIC DATA

ICP - FCP ( (G1) 1550 - (H1) 1550 ) x 100 kPa


Line Slant = = = (O1) 0
Drill String Volume 100 stk
(D18) 657

(J) VARIATION OF PRESSURE

VOLUME PRESSURE
12
strokes kPa

1 0 1550
2 100 1550
3 200 1550
10
4 300 1550
5 400 1550
6 500 1550
7 600 1550 8
kPa

8 657 1550
9 657 1550
Static & dynamic drill pipe pressure

10 657 1550
11 657 1550 6

12 657 1550
13 657 1550
14 657 1550
4
15 657 1550
16 657 1550
17 657 1550
18 657 1550
2
19 657 1550
20 657 1550
21 657 1550
22 657 1550 0
23 657 1550 0 5 10 15 20 25 30
Pumped volume strokes
24 657 1550
Surface BOP Kill Sheet (S.I. Units) Date ###
.
Vertical Well
Name

(A) FORMATION STRENGTH DATA (B) CURRENT WELL DATA


SURFACE LEAK-OFF PRESSURE FROM
FORMATION STRENGTH TEST (A1) 4000 kPa
SICPP

SIDPP
DRILLING FLUID DENSITY AT TEST (A2) 1250 kg/m3
CURRENT DRILLING FLUID
INITIAL MAX. ALLOWLABE DRILLING DENSITY =
DENSITY (B1) 1250 kg/m3
Surface Leak-Off Pressure
= Fluid Density at Test + =
Shoe T.V. Depth x g

(A1) 4000
= (A2) 1250 + = (A3) = 1759 kg/m3
(B4) 801 x 0.00981
INITIAL MAX. ALLOWLABE ANNULAR SURFACE PRESSURE =
CASING SHOE DATA
= (Initial Max. Allowlable Drilling Density - Curent Density) x Shoe T.V. x g =
DIAMETER (B2) 340 mm
=( (A3) 1759 - (B1) 1250 ) x (B4) 801 x 0.00981 =
M. DEPTH (B3) 801 m
= (A4) = 4000 kPa
T.V. DEPTH (B4) 801 m
(C) PUMPS DATA
PUMP NO.1 DISPLACEMENT PUMP NO.2 DISPLACEMENT

0.0205 m 3 /stroke 0.0205 m3 /stroke

DYNAMIC PRESSURE LOSS (DPL)


SLOW PUMP RATE DATA
PUMP NO. 1 PUMP NO. 2 HOLE DATA

30 SPM 1200 kPa 1150 kPa DIAMETER (B5) 216 mm

40 SPM 1650 kPa 1700 kPa M. DEPTH (B6) 809 m

PUMP
DISPLACEMENT SLOW PUMP RATE
DYNAMIC PRESSURE T.V. DEPTH (B7) 809 m
SELECT LOSS
- SPM kPa
m 3 /stroke
2 (C1) 0.0205 (C2) 40 (C3) 1700

(D) PRE-RECORDER VOLUME DATA

PUMP STROKES = TIME =


LENGTH CAPACITY VOLUME Volume Pump Strokes
= =
Pump Displ. (C1) Pump Rate (C2)
m strokes minutes
m3 m m3
DRILL PIPE from SURFACE to BHA (B6) - (D1) - (D2)= 624 x 0.01158 = (D3) 7.23 (D15) 352 9
HEVI WALL DRILL PIPE (D1) 56 x 0.00580 = (D4) 0.32 (D16) 16 0
DRILL COLLAR (D2) 129 x 0.00256 = (D5) 0.33 (D17) 16 0
DRILL STRING VOLUME (D3)+(D4)+(D5) = (D6) 7.88 (D18) 384 10
DRILL COLLAR in OPEN HOLE (D2)= 129 x 0.01520 = (D7) 1.96 (D19) 96 2
DRILL PIPE/HWDP in OPEN HOLE (B6) - (B3) - (D2)= -121 x 0.02128 = (D8) -2.57 (D20) -126 -3
OPEN HOLE VOLUME (D7)+(D8) = (D9) -0.61 (D21) -30 -1
DRILL PIPE in CASING (B3)= 801 x 0.06258 = (D10) 50.13 (D22) 2445 61
TOTAL ANNULUS VOLUME (D9)+(D10) = (D11) 49.51 (D23) 2415 60
TOTAL WELL SYSTEM VOLUME (D6)+(D11) = (D12) 57.39 (D24) 2800 70
ACTIVE SURFACE VOLUME (D13) 3.00 (D25) 146 4
TOTAL ACTIVE FLUID SYSTEM (D12)+(D13) = (D14) 60.39 (D26) 2946 74
(E) KICK DATA
SHUT IN DRILL PIPE PRESSURE SHUT IN CASING PRESSURE PIT GAIN

SIDPP (E1) = kPa SICP (E2) = kPa (E3) = m3

(F) KILL FLUID DENSITY


SIDPP
KFD = Curent Drilling Fluid Density + =
Hole T.V. Depth x g
(E1) 0
= (B1) 1250 + = (F1) 1250 kg/m3
(B7) 809 x 0.00981

(G) INITIAL CIRCULATING PRESSURE

ICP = DPL+ SIDPP = (C3) 1700 + (E1) 0 = (G1) 1700 kPa

(H) FINAL CIRCULATING PRESSURE

KFD (F1) 1250


FCP = x DPL = x (C3) 1700 = (H1) 1700 kPa
Curent Drilling Fluid Density (B1) 1250

(I) GRAPHIC DATA

ICP - FCP ( (G1) 1700 - (H1) 1700 ) x 100 kPa


Line Slant = = = (O1) 0
Drill String Volume 100 stk
(D18) 384

(J) VARIATION OF PRESSURE

VOLUME PRESSURE
12
strokes kPa

1 0 1700
2 100 1700
3 200 1700
10
4 300 1700
5 384 1700
6 384 1700
7 384 1700 8
kPa

8 384 1700
9 384 1700
Static & dynamic drill pipe pressure

10 384 1700
11 384 1700 6

12 384 1700
13 384 1700
14 384 1700
4
15 384 1700
16 384 1700
17 384 1700
18 384 1700
2
19 384 1700
20 384 1700
21 384 1700
22 384 1700 0
23 384 1700 0 5 10 15 20 25 30
Pumped volume strokes
24 384 1700
FORMULA SHEET S.I. Unit

1. HYDROSTATIC PRESSURE

Fluid Density x g x TVD = kg/m3 x 0.00981 x m = kPa

2. FLUID PRESSURE GRADIENT

Fluid Density x g = kg/m3 x 0.00981 = kPa/m

3. DRILLING FLUID DENSITY

Pressure kPa
= = kg/m3
TVD x g m x 0.00981

4. FORMATION PORE PRESSURE

Hydrostatic Pressure in Drill String + SIDPP = kPa + kPa = kPa

5. FLOW PUMP

Pump Displacement x Pump Rate = m 3 /stk x 40 stk/min = m3 /min

6. ANNULAR VELOCITY

Flow Output Pump m3 /min


= = m/min
Annular Capacity m3 /m

7. EQUIVALENT CIRCULATING DENSITY

Annular Pressure Loss


+ Fluid Density =
TVD x g
kPa
= + kg/m3 = kg/m3
m x 0.00981

8. DENSITY WITH MARGIN INCLUDED


Safety Margin kPa
+ Fluid Density = + kg/m3
=
kg/m3
TVD x g m x 0.00981

9. NEW PUMP PRESSURE WITH NEW PUMP RATE

(
2

)
New Pump Rate
Old Pump Pressure x =
Old Pump Rate
2

= kPa x
( stk/min

stk/min ) = kPa

10. NEW PUMP PRESSURE WITH NEW FLUID DENSITY

New Fluid Density


Old Pump Pressure x =
Old Fluid Density

kg/m3 kPa
= kPa x =

kg/m3
11. MAXIMUM ALLOWABLE FLUID DENSITY

Surface LOT Pressure


+ LOT Fluid Density =
Shoe TVD x g

kPa
= + kg/m3 = kg/m3
m x 0.00981

12. MAXIMUM ALLOWABLE ANNULAR SURFACE PRESSURE (MAASP)

( Maximum Allowabe Fluid Density - Current Fluid Density ) x g x Shoe TVD =

= ( kg/m3 - kg/m3 ) x 0.00981 x m = kPa

13. KILL FLUID DENSITY

SIDPP
Original Fluid Density + =
g x Hole TVD

kPa
= kg/m3 + = kg/m3
0.00981 x m

14. INITIAL CIRCULATING PRESSURE

Kill Rate Circulating Pressure + SIDPP = kPa + kPa = kPa

15. FINAL CIRCULATING PRESSURE

Kill Fluid Density


Kill Rate Circulating Pressure x =
Original Fluid Density

kg/m3
= kPa x = kPa
3
kg/m

16. INFLUX LENGTH

Pit Gain
m3 m
= =
Annular Capacity
m3 /m

17. INFLUX DENSITY

SICP - SIDPP
Drilling Fluid Density - =
g x Influx Vertical Heigth

kPa - kPa
= kg/m3 - = kg/m3
0.00981 x m

18. SHUT IN CASING PRESSURE (SICP)

( Drilling Fluid Density - Influx Density ) x g x Influx Vertical Heigth + SIDPP =

= ( kg/m3
-
kg/m3 ) x 0.00981 x m + kPa = kPa

19. BARYTE REQUIRED TO INCREASE DRILLING FLUID DENSITY

( Kill Fluid Density - Original Fluid Density ) x Baryte Density


=
Baryte Density - Kill Fluid Density

( kg/m3
-
kg/m3
) x 4200
= =
kg/m3
4200 - 3
kg/m
= =
4200 - kg/m3

20. PRESSURE GRADIENT OF FLUID


Fluid Density x g = kg/m3 x 0.00981 = kPa/m

21. PERCOLATION SPEED

Increase Speed of Surface Pressure kPa/h


= = m/h
Influx Pressure Gradient kPa/m

22. GAS LAW

p1 x V1 kPa x m3
p2 = = = kPa
V2 3
m

p1 x V1 kPa x m3
V2 = = = m3
p2 kPa

23. PRESSURE DROP WHEN PULLING DRY PIPE

Metal Displacement of Tubulars


Drilling Fluid Density x g x =
Inside Riser/Casing Capacity

m3 /m
=
kg/m 3 x 0.00981 x = kPa/m
3
m /m

24. PRESSURE DROP WHEN PULLING WET PIPE

Total Displacement of Tubulars


Drilling Fluid Density x g x =
Inside Riser/Casing Capacity

m3 /m
=
kg/m3 x 0.00981 x = kPa/m
3
m /m

25. LEVEL DROP WHEN PULLING DRY PIPE

Metal Displacement of Tubulars


Length of Tubulars x =
Inside Riser/Casing Capacity

m3 /m m
= m x =

m3 /m

26. LEVEL DROP WHEN PULLING WET PIPE

Total Displacement of Tubulars


Length of Tubulars x =
Inside Riser/Casing Capacity

m3 /m m
= m x =

m3 /m

27. LENTGH OF TUBULARS TO PULL DRY BEFORE OVERBALANCE IS LOST

Overbalance Inside Riser/Casing Capacity - Metal Displacement of Tubulars


x =
Drilling Fluid Gradient Metal Displacement of Tubulars

kPa
m3 /m
-
= x m3 /m = m
= x = m
kPa/m 3
m /m

28. LENTGH OF TUBULARS TO PULL WET BEFORE OVERBALANCE IS LOST

Overbalance Inside Riser/Casing Capacity


x =
Drilling Fluid Gradient Total Displacement of Tubulars

kPa m3 /m
= x = m
kPa/m 3
m /m

29. VOLUME TO BLEED OFF TO RESTORE BHP TO FORMATION PRESSURE

Increase in Surface Pressure


Influx Volume x =
Formation Pressure - Increase in Surface Pressure

KPa
=
m 3 x =
m3
kPa - kPa

30. SLUG VOLUME FOR A GIVEN LENGTH OF DRY PIPE

Drilling Fluid Density


Length of Dry Pipe x Pipe Capacity x =
Slug Fluid Density - Drilling Fluid Density

kg/m3
= m x m /m x
3 = m3
kg/m3 - kg/m3

31. PIT GAIN DUE TO SLUG U-TUBING

( )
Slug Fluid Density
Slug Volum x - 1 =
Drilling Fluid Density

=
m3
x
( kg/m3

kg/m3
- 1
) = =
m3

32. BOP CLOSING RATIO

Wellhead Pressure at BOP


=
Hydraulic Pressure Required to Close

kPa
= = -
kPa

33. BOP OPEN RATIO

Wellhead Pressure at BOP kPa


= = -
Hydraulic Pressure Required to Open kPa

34. HYDROSTATIC PRESSURE LOSS IF CASING FLOAT FAILS

Casing Capacity
Drilling Fluid Density x Unfilled Casing Heigth x g x =
Casing Capacity + Annular Capacity

m3 /m kPa
=
3 x m x 0.00981 x =
kg/m +
m3 /m m3 /m
Volum Presiune Pompa Frecventa Presiune
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!
14 #REF! #REF!
15 #REF! #REF!
16 #REF! #REF!
17 #REF! #REF!
18 #REF! #REF!
19 #REF! #REF!
20 #REF! #REF!
21 #REF! #REF!
22 #REF! #REF!
23 #REF! #REF!
24 #REF! #REF!
Surface BOP Kill Sheet (S.I. Units) Date ###
.
Vertical Well
Name

(A) FORMATION STRENGTH DATA (B) CURRENT WELL DATA


SURFACE LEAK-OFF PRESSURE FROM
FORMATION STRENGTH TEST (A1) kPa
SICPP

SIDPP
DRILLING FLUID DENSITY AT TEST (A2) kg/m3
CURRENT DRILLING FLUID
INITIAL MAX. ALLOWLABE DRILLING DENSITY =
DENSITY (B1) kg/m3
Surface Leak-Off Pressure
= Fluid Density at Test + =
Shoe T.V. Depth x g

(A1)
= (A2) + = (A3) = kg/m3
(B4) x 0.00981
INITIAL MAX. ALLOWLABE ANNULAR SURFACE PRESSURE =
CASING SHOE DATA
= (Initial Max. Allowlable Drilling Density - Curent Density) x Shoe T.V. x g =
DIAMETER (B2) mm
=( (A3) - (B1) ) x (B4) x 0.00981 =
M. DEPTH (B3) m
= (A4) = kPa
T.V. DEPTH (B4) m

(C) PUMPS DATA


PUMP NO.1 DISPLACEMENT PUMP NO.2 DISPLACEMENT

m3 /stroke m3 /stroke

DYNAMIC PRESSURE LOSS (DPL)


SLOW PUMP RATE DATA
PUMP NO. 1 PUMP NO. 2 HOLE DATA

SPM kPa kPa DIAMETER (B5) mm

SPM kPa kPa M. DEPTH (B6) m

PUMP DYNAMIC PRESSURE T.V. DEPTH (B7) m


DISPLACEMENT SLOW PUMP RATE
SELECT LOSS
- SPM kPa
m 3 /stroke
(C1) (C2) (C3)

(D) PRE-RECORDER VOLUME DATA

PUMP STROKES = TIME =


LENGTH CAPACITY VOLUME Volume Pump Strokes
= =
Pump Displ. (C1) Pump Rate (C2)
m 3 strokes minutes
m m m3
DRILL PIPE from SURFACE to BHA (B6) - (D1) - (D2)= x = (D3) (D15)

HEVI WALL DRILL PIPE (D1) x = (D4) (D16)

DRILL COLLAR (D2) x = (D5) (D17)

DRILL STRING VOLUME (D3)+(D4)+(D5) = (D6) (D18)

DRILL COLLAR in OPEN HOLE (D2)= x = (D7) (D19)

DRILL PIPE/HWDP in OPEN HOLE (B6) - (B3) - (D2)= x = (D8) (D20)

OPEN HOLE VOLUME (D7)+(D8) = (D9) (D21)

DRILL PIPE in CASING (B3)= x = (D10) (D22)

TOTAL ANNULUS VOLUME (D9)+(D10) = (D11) (D23)

TOTAL WELL SYSTEM VOLUME (D6)+(D11) = (D12) (D24)

ACTIVE SURFACE VOLUME (D13) (D25)

TOTAL ACTIVE FLUID SYSTEM (D12)+(D13) = (D14) (D26)


(E) KICK DATA
SHUT IN DRILL PIPE PRESSURE SHUT IN CASING PRESSURE PIT GAIN

SIDPP (E1) = kPa SICP (E2) = kPa (E3) = m3

(F) KILL FLUID DENSITY


SIDPP
KFD = Curent Drilling Fluid Density + =
Hole T.V. Depth x g
(E1)
= (B1) + = (F1) kg/m3
(B7) x 0.00981

(G) INITIAL CIRCULATING PRESSURE

ICP = DPL+ SIDPP = (C3) + (E1) = (G1) kPa

(H) FINAL CIRCULATING PRESSURE

KFD (F1)
FCP = x DPL = x (C3) = (H1) kPa
Curent Drilling Fluid Density (B1)

(I) GRAPHIC DATA

ICP - FCP ( (G1) - (H1) ) x 100 kPa


Line Slant = = = (O1) 100 stk
Drill String Volume (D18)

(J) VARIATION OF PRESSURE

VOLUME PRESSURE
12
strokes kPa

3
10
4

7
8
kPa

9
Static & dynamic drill pipe pressure

10

11 6

12

13

14
4
15

16

17

18
2
19

20

21

22
0
23 0 1 2
Pumped volume strokes
24
FORMULA SHEET S.I. Unit

1. HYDROSTATIC PRESSURE

Fluid Density x g x TVD = 1240 kg/m3 x 0.00981 x 3182 m = 38707 kPa

2. FLUID PRESSURE GRADIENT

Fluid Density x g = 1240 kg/m3 x 0.00981 = 12 kPa/m

3. DRILLING FLUID DENSITY

Pressure 40663 kPa


= = 1303 kg/m3
TVD x g 3182 m x 0.00981

4. FORMATION PORE PRESSURE

Hydrostatic Pressure in Drill String + SIDPP = 38707 kPa + 6895 kPa = 45602 kPa

5. FLOW PUMP

Pump Displacement x Pump Rate = 0.01480 m 3 /stk x 40 stk/min = 0.592 m3 /min

6. ANNULAR VELOCITY

Flow Output Pump 0.592 m3 /min


= = 13.13 m/min
Annular Capacity 0.04510 m3 /m

7. EQUIVALENT CIRCULATING DENSITY

Annular Pressure Loss


+ Fluid Density =
TVD x g

4414 kPa
= + 1222 = 1363 kg/m3
kg/m3
3182 m x 0.00981

8. DENSITY WITH MARGIN INCLUDED


Safety Margin 45605 kPa
+ Fluid Density = + 1222 kg/m3
= 2683 kg/m3
TVD x g 3182 m x 0.00981

9. NEW PUMP PRESSURE WITH NEW PUMP RATE

(
2

)
New Pump Rate
Old Pump Pressure x =
Old Pump Rate
2

( )
30 stk/min
= 1931 kPa x = 4345 kPa
20 stk/min

10. NEW PUMP PRESSURE WITH NEW FLUID DENSITY

New Fluid Density


Old Pump Pressure x =
Old Fluid Density

1254
kg/m3 1982 kPa
= 1931 kPa x =
1222
kg/m3
11. MAXIMUM ALLOWABLE FLUID DENSITY

Surface LOT Pressure


+ LOT Fluid Density =
Shoe TVD x g

21375 kPa
= + 1222 kg/m3 = 1910 kg/m3
3168 m x 0.00981

12. MAXIMUM ALLOWABLE ANNULAR SURFACE PRESSURE (MAASP)

( Maximum Allowabe Fluid Density - Current Fluid Density ) x g x Shoe TVD =

= ( 1910 kg/m3 - 1222 kg/m3 ) x 0.00981 x 3168 m = 21382 kPa

13. KILL FLUID DENSITY

SIDPP
Original Fluid Density + =
g x Hole TVD

1000 kPa
= 1222 kg/m3 + = 1253 kg/m3
0.00981 x 3300 m

14. INITIAL CIRCULATING PRESSURE

Kill Rate Circulating Pressure + SIDPP = 3034 kPa + 1000 kPa = 4034 kPa

15. FINAL CIRCULATING PRESSURE

Kill Fluid Density


Kill Rate Circulating Pressure x =
Original Fluid Density

1254 kg/m3
= 3034 kPa x = 3113 kPa
1222 kg/m 3

16. INFLUX LENGTH

Pit Gain 1.0 m3


= = 22 m
Annular Capacity 0.04510 m3 /m

17. INFLUX DENSITY

SICP - SIDPP
Drilling Fluid Density - =
g x Influx Vertical Heigth

2000 kPa - 10000 kPa


= 1222 kg/m3 - = 10489 kg/m3
0.00981 x 22 m

18. SHUT IN CASING PRESSURE (SICP)

( Drilling Fluid Density - Influx Density ) x g x Influx Vertical Heigth + SIDPP =

= ( 1222
kg/m3
- 1000
kg/m3 ) x 0.00981 x 22 m + 1000 kPa = 1048 kPa

19. BARYTE REQUIRED TO INCREASE DRILLING FLUID DENSITY

( Kill Fluid Density - Original Fluid Density ) x Baryte Density


=
Baryte Density - Kill Fluid Density

( 1254
kg/m3
- 1222
kg/m3
) x 4200
= = 54
kg/m3
4200 - 1700 3
kg/m
= =
4200 - 1700 kg/m3

20. PRESSURE GRADIENT OF FLUID


Fluid Density x g = kg/m3 x 0.00981 = 0 kPa/m

21. PERCOLATION SPEED

Increase Speed of Surface Pressure kPa/h


= = #DIV/0! m/h
Influx Pressure Gradient kPa/m

22. GAS LAW

p1 x V1 kPa x m3
p2 = = = #DIV/0! kPa
V2 m3

p1 x V1 kPa x m3
V2 = = = #DIV/0! m3
p2 kPa

23. PRESSURE DROP WHEN PULLING DRY PIPE

Metal Displacement of Tubulars


Drilling Fluid Density x g x =
Inside Riser/Casing Capacity

m3 /m
= x 0.00981 x = #DIV/0! kPa/m
kg/m3
3
m /m

24. PRESSURE DROP WHEN PULLING WET PIPE

Total Displacement of Tubulars


Drilling Fluid Density x g x =
Inside Riser/Casing Capacity

m3 /m
= 3 x 0.00981 x = #DIV/0! kPa/m
kg/m
3
m /m

25. LEVEL DROP WHEN PULLING DRY PIPE

Metal Displacement of Tubulars


Length of Tubulars x =
Inside Riser/Casing Capacity

m3 /m
= m x = #DIV/0! m

m3 /m

26. LEVEL DROP WHEN PULLING WET PIPE

Total Displacement of Tubulars


Length of Tubulars x =
Inside Riser/Casing Capacity

m3 /m #DIV/0! m
= m x =

m3 /m

27. LENTGH OF TUBULARS TO PULL DRY BEFORE OVERBALANCE IS LOST

Overbalance Inside Riser/Casing Capacity - Metal Displacement of Tubulars


x =
Drilling Fluid Gradient Metal Displacement of Tubulars

kPa
m3 /m
-
= x m3 /m = #DIV/0! m
= x = #DIV/0! m
kPa/m 0.00000 m /m3

28. LENTGH OF TUBULARS TO PULL WET BEFORE OVERBALANCE IS LOST

Overbalance Inside Riser/Casing Capacity


x =
Drilling Fluid Gradient Total Displacement of Tubulars

kPa m3 /m
= x = #DIV/0! m
kPa/m 3
m /m

29. VOLUME TO BLEED OFF TO RESTORE BHP TO FORMATION PRESSURE

Increase in Surface Pressure


Influx Volume x =
Formation Pressure - Increase in Surface Pressure

KPa
= 3 x = #DIV/0! m3
m kPa - kPa

30. SLUG VOLUME FOR A GIVEN LENGTH OF DRY PIPE

Drilling Fluid Density


Length of Dry Pipe x Pipe Capacity x =
Slug Fluid Density - Drilling Fluid Density

kg/m3
= m x = #DIV/0! m3
m /m x
3
kg/m3 - kg/m3

31. PIT GAIN DUE TO SLUG U-TUBING

( )
Slug Fluid Density
Slug Volum x - 1 =
Drilling Fluid Density

=
m 3 x
( kg/m3

kg/m3
- 1
) = = #DIV/0! m3

32. BOP CLOSING RATIO

Wellhead Pressure at BOP


=
Hydraulic Pressure Required to Close

kPa
= = #DIV/0! -
kPa

33. BOP OPEN RATIO

Wellhead Pressure at BOP kPa


= = #DIV/0! -
Hydraulic Pressure Required to Open kPa

34. HYDROSTATIC PRESSURE LOSS IF CASING FLOAT FAILS

Casing Capacity
Drilling Fluid Density x Unfilled Casing Heigth x g x =
Casing Capacity + Annular Capacity

m3 /m #DIV/0! kPa
= x m x 0.00981 x =
kg/m3 +
m3 /m m3 /m
Surface BOP Kill Sheet (S.I. Units) Date ###
.
Vertical Well
Name

(A) FORMATION STRENGTH DATA (B) CURRENT WELL DATA


SURFACE LEAK-OFF PRESSURE FROM
FORMATION STRENGTH TEST (A1) 1600 kPa
SICPP

SIDPP
DRILLING FLUID DENSITY AT TEST (A2) 1100 kg/m3
CURRENT DRILLING FLUID
INITIAL MAX. ALLOWLABE DRILLING DENSITY =
DENSITY (B1) 1120 kg/m3
Surface Leak-Off Pressure
= Fluid Density at Test + =
Shoe T.V. Depth x g

(A1) 1600
= (A2) 1100 + = (A3) = 1455 kg/m3
(B4) 459 x 0.00981
INITIAL MAX. ALLOWLABE ANNULAR SURFACE PRESSURE =
CASING SHOE DATA
= (Initial Max. Allowlable Drilling Density - Curent Density) x Shoe T.V. x g =
DIAMETER (B2) 340 mm
=( (A3) 1455 - (B1) 1120 ) x (B4) 459 x 0.00981 =
M. DEPTH (B3) 464 m
= (A4) = 1510 kPa
T.V. DEPTH (B4) 459 m
(C) PUMPS DATA
PUMP NO.1 DISPLACEMENT PUMP NO.2 DISPLACEMENT

0.0205 m 3 /stroke 0.0205 m3 /stroke

DYNAMIC PRESSURE LOSS (DPL)


SLOW PUMP RATE DATA
PUMP NO. 1 PUMP NO. 2 HOLE DATA

30 SPM 1100 kPa 1100 kPa DIAMETER (B5) 312 mm

40 SPM 1600 kPa 1580 kPa M. DEPTH (B6) 1388 m

PUMP
DISPLACEMENT SLOW PUMP RATE
DYNAMIC PRESSURE T.V. DEPTH (B7) 1135 m
SELECT LOSS
- SPM kPa
m 3 /stroke
1 (C1) 0.0205 (C2) 30 (C3) 1100

(D) PRE-RECORDER VOLUME DATA

PUMP STROKES = TIME =


LENGTH CAPACITY VOLUME Volume Pump Strokes
= =
Pump Displ. (C1) Pump Rate (C2)
m strokes minutes
m3 m m3
DRILL PIPE from SURFACE to BHA (B6) - (D1) - (D2)= 1250 x 0.00926 = (D3) 11.58 (D15) 565 19
HEVI WALL DRILL PIPE (D1) 82 x 0.00458 = (D4) 0.37 (D16) 18 1
DRILL COLLAR (D2) 56 x 0.00402 = (D5) 0.23 (D17) 11 0
DRILL STRING VOLUME (D3)+(D4)+(D5) = (D6) 12.18 (D18) 594 20
DRILL COLLAR in OPEN HOLE (D2)= 56 x 0.04300 = (D7) 2.41 (D19) 117 4
DRILL PIPE/HWDP in OPEN HOLE (B6) - (B3) - (D2)= 868 x 0.06300 = (D8) 54.68 (D20) 2668 89
OPEN HOLE VOLUME (D7)+(D8) = (D9) 57.09 (D21) 2785 93
DRILL PIPE in CASING (B3)= 464 x 0.07700 = (D10) 35.73 (D22) 1743 58
TOTAL ANNULUS VOLUME (D9)+(D10) = (D11) 92.82 (D23) 4528 151
TOTAL WELL SYSTEM VOLUME (D6)+(D11) = (D12) 105.00 (D24) 5122 171
ACTIVE SURFACE VOLUME (D13) 1.00 (D25) 49 2
TOTAL ACTIVE FLUID SYSTEM (D12)+(D13) = (D14) 106.00 (D26) 5171 172
(E) KICK DATA
SHUT IN DRILL PIPE PRESSURE SHUT IN CASING PRESSURE PIT GAIN

SIDPP (E1) = kPa SICP (E2) = kPa (E3) = m3

(F) KILL FLUID DENSITY


SIDPP
KFD = Curent Drilling Fluid Density + =
Hole T.V. Depth x g
(E1) 0
= (B1) 1120 + = (F1) 1120 kg/m3
(B7) 1135 x 0.00981

(G) INITIAL CIRCULATING PRESSURE

ICP = DPL+ SIDPP = (C3) 1100 + (E1) 0 = (G1) 1100 kPa

(H) FINAL CIRCULATING PRESSURE

KFD (F1) 1120


FCP = x DPL = x (C3) 1100 = (H1) 1100 kPa
Curent Drilling Fluid Density (B1) 1120

(I) GRAPHIC DATA

ICP - FCP ( (G1) 1100 - (H1) 1100 ) x 100 kPa


Line Slant = = = (O1) 0
Drill String Volume 100 stk
(D18) 594

(J) VARIATION OF PRESSURE

VOLUME PRESSURE
12
strokes kPa

1 0 1100
2 100 1100
3 200 1100
10
4 300 1100
5 400 1100
6 500 1100
7 594 1100 8
kPa

8 594 1100
9 594 1100
Static & dynamic drill pipe pressure

10 594 1100
11 594 1100 6

12 594 1100
13 594 1100
14 594 1100
4
15 594 1100
16 594 1100
17 594 1100
18 594 1100
2
19 594 1100
20 594 1100
21 594 1100
22 594 1100 0
23 594 1100 0 5 10 15 20 25 30
Pumped volume strokes
24 594 1100

You might also like