You are on page 1of 34

F -X C h a n ge F -X C h a n ge

PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

• Introduction
• Rotor
• Rotor types
• Stresses in rotors
• Rotor tests
• SFRA (frequency response)
• Research
• Simulation software
• Simulated equipment failures in good condition
• Real cases of failure of rotors
• Conclusions
Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Temario

INTRODUCTION

• In order to have a test that detects the difference between


different fault processes, to carry out an adequate control of
the condition, the measurement of SFRA can be a valuable
tool to diagnose the state of the winding of electric rotors.
• This work presents the process of SFRA measurement in
rotors, the way in which the first results were validated, as
well as several fault cases that have been characterized with
the measurement of SFRA.
Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

• Currently worldwide there is no methodology, standard or


specification, which made the application of this test as a tool
for diagnosing electrical rotors.
• In this work the SFRA method was applied to determine rotor
problems Poor insulation and most importantly create an
evaluation criterion to identify specific problems in a rotor.

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Simulation of SFRA in rotor by software

R2 8.1G R6 8.1G R7 8.1G R8 8.1G

R1 1 C1 400n C2 400n C3 400n C4 400n

R3 1 L2 50u

R4 1 L3 50u

R5 1L4 50u
L1 50u
+

VG1

A +
AM1

-5

-10

-15
db

-20

-25

-30

-35

-40
100Hz 1kHz 10kHz 100kHz 1MHz Hz

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Ground Fault

Short circuit between turns


F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

TEST
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Test Method

0
0
-10
-5

-20 -10

-15
db

-30

db
-20
-40
-25

-50 -30

-35
-60
20 105
100Hz 554 1kHz 2913 10kHz 15309 80450
100kHz 422767 1MHz -40
Hz 100Hz 1kHz 10kHz 100kHz 1MHz Hz
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Study cases

Generator
Westinghouse
19.2 MW
900 RPM
13.8 kV 125Vexc
803 A 325 Aexc

During programmed
maintenance tests, 3
poles with short circuit
between turns are
detected.

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

3 poles with
damage
between
coils

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Evidence of damage between turns

Evidence of thermal
Aging insulation Repair process
damage

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Study cases

Generator
Brown Boveri
344.5 MW
3600 RPM
20 kV 400 Vexc
9945 A 3250 Aexc

By ground protection
operation, the rotor is
evaluated in a bolt-on.

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

0
Rotor smooth poles
Shift of the curve at low
-20 frequencies from 0db to -80db

-40

dB -60

-80

-100

-120
10 100 1000 10000 100000 1000000 10000000
Hz Pole int Pole ext

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Evidence of Ground fault of the winding

Damage zone Coil damaged Short circuit point

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Rotor after repair


0

-5

-10

-15

dB -20

-25

-30

-35

-40
10 100 1000 10000 100000 1000000 10000000
Pole int Hz Pole ext
Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Study cases

Generator
Siemens-Schucktert
45MW
3600 RPM
13.8 kV 200 Vexc
1920 A 560 Aexc

At the moment of
driving the rotor at a
speed of 3600 rpm, the
field current is tripped.

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Rotor smooth poles


0

-5

-10

-15

-20

-25
dB
-30

-35

-40

-45

-50
10 100 1000 10000 100000 1000000 10000000

Hz

Anillo Ext-2014 Anillo Ext-2012

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

This problem arises after a change of retaining rings

Deformed Evidence of dirty


Burned insulation
conductors work
The cause of the change in SFRA curves a central
conductor, broken. Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Study cases

Generator
Fuji Electric Co. LTD
90 MW
3600 RPM
13.8 kV 275 Vexc
3905 A 965 Aexc

As a result of
operation, from ground
fault relay.

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Rotor smooth poles

Shift of the curve at low


frequencies from 0db to -5db

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Ground fault of the winding

Contamination in
Rotor Brackets out of place
excitation ring zone

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Study cases

Generator
ASEA
225 MW
128 RPM
15 kV 500 Vexc
8660 A 1400 Aexc

High vibration in the


rotor.

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Rotor smooth poles

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Study cases

Generator
Ansaldo
170 MW
3600 RPM
15 kV 292 Vexc
6843 A 1401Aexc

Opens the excitation


circuit, can be seen
from 3500rpm.

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Rotor smooth poles

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Rupture at two points of the winding conductor

Evidence of
Broken conductor Repair process
corrosion

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Study cases

Generator
Tecnomasio
2120 MW
3600 RPM
14.4 kV 260 Vexc
86 kA 365 Aexc

During programmed
maintenance tests, 3
poles with short circuit
between turns are
detected.

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Rotor smooth poles

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

In 2008 the rotor is repaired by a fault, in 2014 rotor problems


are detected and the retaining rings are changed.

Old and deteriorated


Extraction of retaining rings insulation, deformed Repair process
electrical conductor.

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Study cases

Generator
Indar
1.54 MW
1440 RPM
12 kV 1789 Vexc
67 A 570 Aexc

During programmed
maintenance tests, 3
poles with short circuit
between turns are
detected.

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Rotor smooth poles


10

-10

-20

dB
-30

-40

-50

-60
10 100 1000 10000 100000 1000000 10000000

Hz

dev3 dev2 dev1

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Rotor winding
connection Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

Conclusions

• The test has repeatability


• No differences were detected by the position in which the
rotor is tested.
• The fault patterns are characteristic, so easy to identify.
• No influence of magnetism on the rotor has been identified.
• The test must be performed by measuring both poles.

The SFRA does not change if the rotor is outside or inside the
stator.

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales
F -X C h a n ge F -X C h a n ge
PD PD

!
W

W
O

O
N

N
y

y
bu

bu
to

to
k

k
lic

lic
C

C
w

w
m

m
w w
w

w
o

o
.d o .c .d o .c
c u -tr a c k c u -tr a c k

• The quality and importance of the results obtained from this


research are summarized in practical and effective evaluation
criteria, which represent a very important test engineers in
recognizing and diagnosing problems in electrical rotors tool.
This way you can prevent further damage to the facilities of
the power plants. These criteria are set as follows:

Dirección de Modernización
Laboratorio de Pruebas de Equipos y Materiales

You might also like