) Theconnections subject to reversal of stresses due to passage of live load in case of bridges are designed for the
(A) sum of minimum forces and reversal of forces
(B) sum of maximum forces and reversal of forces
(C) difference of maximum force and reversal of for s
(D) impact factor times the difference of maximum forces and reversal of forces
2) For what condition bridge is called as through type of bridge'?
(A) Vehichles below the superstructure (B) Railway and highway together on the superstructure
(C) Vehicles insidethe superstructure (D) Highway above the railways
3)Width and height of kerbs on bridges are Generally Srespectively.
(A) 600 mm and 225 mm (B) 450 mm and 200 mm
(C) 225 mm and 600 mm (D) 200 mm and 450 mm
4) Height of Bridge is generally -
of the high flood level(HFL) B) 1.5 times the high floodfevel (HFL)
(A) twice
(C) 1.5 meter above the high flood level (HFL) (D) 3 meter above the high flaód level (H FL)
5) Depth of scour únder bridge pier and abutments is determined by the equation
(A)D=0473(7 (B) D=0.473(35 C)D =0.433(037 (D) D0.433(033
6) Courbon's method ofdesign of bridge is applicable when the ratio of span width is berýeen and
(A) 4 (B) 2.4 (C) 3.4 (D) 5.4
7) Squarealignment js termed when the angle between the bridge and the river is
(A)Greater than 30° (B) Exactly 45° (C) Less than 60° (D) Nearing90°
8) Wing walls are
A) walls constructed along the span of the bridge
(B) floor provided between masonry walls below the riverbed
0) slab constructed above the bridge for architectural purpose
9) retaining walls constructed to retainithe earthwork of approach embankment behind the Abuthfents
9) Which one of the following bearings are forgiving in that they can tolerate loads and movements exceeding the
design values?
(A) Rocker (B) Slide plate C) Steel roller (D) Elastomeric
10) Most suitable bearing for girder spans less than 12 meters long is
(A) Shallow bearings (B) Deepbearings (C) Rocker bearings (D) Sliding plate bearings
11) Consider the following statements:
1. Bearings are provided in bridges to transmit the load from superstructure to the sub-structure
2. Fixed bearing allows both rotation and translation
3he design
support
of bearing
dependsupon hetypeofsyppcktnucture,typeof supports and also on the length of
Which of these statement(s) is/ are true?
(A) Only 1 (B) Only 2 (C) 1 and 2 (D) I and 3
12) A bridge having its floor supported at the top of the superstructure is called
(A) through bridge (B) deck bridge (C) skew bridge D) semi-through bridge
13) For long span such as 800 m, which type of bridge is provided?
(A) Beam bridges (B) Cantilever bridges
As the span of a
(C) Truss bridges D) Suspension bridges
14) bridge increases, how does the impact factor vary?
(A) It decreases (B) It increases (C) It remains constant (D) It increases up to a
critical value of span and then decreases
15) In design of bridge, wind and loads shall not be considered to act simultaneously.
(A) lateral (D) seismic
(B) longitudinal (C) centrifugal

urning Point Complex, opp. Omkar Row House, Uttran, Surat, Gujarat 394105
MO 84606 37673 INSTAGRAM-gesasurat
FACEBOOK:-GCSA Surat
is >12 tnen, Determine the maximum flood discharge by Rvve's
16 f the catchment area ofbridge Site KIm
(Take C 0.68)
empirical formula? (B) 56.84 m'/s (C) 36.54 m/S
(A) 43.52m/s (D) None of these
Which among the following bridges can have longest span?
17) (B) Girder and beams bridge
(A) Masonry arch bridge
(C) Suspension bridges (D) C'able-stayed bridges
type of loading is uscd to design temporary bridgcs such as timber Bridge.
18)
(A) IRC Class A (B) IRC Class AA (C) IRC Class B (D) IRC Class AB
banks of which river?
19) Rani Ki Vav. was located on the
(A) Sabamati River (B) Saraswati River (C) Narmada river (D) Mandovi River
20)Sarkez Roza was the prominent centre for?
(A) Jainism (B) Hinduism (C) Buddhism (D) Sufism
21) Which is the world's earliest dock located in Gujarat
(A) Pipavav (B) Mundra (C) Lothal (D) Ghogha
22) The famous Huthecsing Jain temple located in Alimédabd related to which tirthankara?
(A) Parasnath (B)Rishabhjnath C Dharnianath (D) Shreyanshnath
23) Amodem Indo- Saraceniç Arehitecture built by Maharaja Sayajirao Gackwadis
(A) Faluknama Palacè(B) Jaivilas Palace (C)Lakshmivilas Palacé (D) ShaniwarWada
24)Modhera Sun temple was constructed during the reign of which dynasty
(A)Solanki (B) Mauryan (C) Chalukya
R(D) Sultanate
25) Which is impotant Indus Valley Civilization site was located on Kutch region?
(A) Lothal (B) Rakhigarhi (C) Kahbangan (D) Dholavira
26) Adlaj Stepwell was tbuilt in which style of architecture
(A) indo - Islamic
(B) Gothic C)Maru- Gurjara (D) Solanki
27) Whichofthe following archealogical park was located in Panchamal Dist in Gujarat?
(A)Kutch (B) Champaner-Pavagadh (C) Dholavira (D)Kabutarkhana
28) Who laid foundation stone for Sardar Sarovar Dam?
(A) Lal Bahadur Shastri (B) JawaharLal Nehru
(C) Sardar Vallabhai Patel (D) None of the above
29) What is height of Sardar Sarovar Dam?
TA) 168meters (B) 125 Meters (C) 136.68 meters (D) 1963Meters
30) On which ríver Dantiwada dam constructed?
(A) Tapi (B)Narmada (C) Sabarmati D) West Banas
31) How many canalfall on saurashtra branch canal?
(A) 1 (B) 2 (Cy3 (D) 4
32) Longest bridge of India on river?
(A) Dhola sadia bridge (B) Bogibeel bridge
(C) pemban bridge (D) signature bridge
33) Which type of material used for Dharoi dam?
(A) Rock fill embankment Bcarth and masonbased
(C) gravity based
34) Which is the largest dam in Gujarat
ymud DYmud bas
(A) Wellington dam (B) Ukai dam (C) SardarSarovar dam (D) Kodana dam
35) Main objects of planning are.
(A) Health (B) Conyvenience (C) Beauty (D) All of above
36) Hauling equipment are used for
(A) lifting heavy weights (B) excavating earth
(C)moving of material from place to another (D) none of the above
37) Ukai Dam catchment area.
(A) 82,000 km (B) 82,000 hactors C) 62,000 km* (D) 62,000 hactors
38) The main function of construction management is
(A) planning (B) organizing (C) directing (D) All of the above
39)In the analysis of rates, the profit for the contractor is generally taken as.
(A) 20% (B) 15% (C) 10% (D) 5%

505 Turning Point Complex, opp. Omkar Row House, Uttran, Surat, Gujarat 394105
MO -84606 37673 FACEBOOK: GCSA Surat INSTAGRAM :- gesasurat
40) Anaiysis of rate. the quantity of mortar for 10 cu.m of brickwork taken as
(A) 1.25 cu. m (B) 1.5 cu. m (C) 2.5 cu. m (D) 3.0 cu.m
41) For sanitary and water supply works, what percentage of the estimated cost of the building works are usually
provided in an estimate?
(A) 8% for sanitary work and 7% for water supply work
(B) 8% for sanitary work and 8% for water supply work
(C) 7% for sanitary work and 8% for water supply work
(D) 7% for sanitary work and 7% water supply work
42) Which one of the following techniques is not covered in Project Network Analysis?
(A) Critical Path Method (B) Program Evaluation and Review Techniques
(C) Procedure Network Analysis (D) Measurement Book
43) For completion of a project, the critical path of the network represents
(A) minimum time (B) maximum time (C) maximum cost (D) minimum cost
44) Which method in network analysis deals with uncertainties associated with the activities?
(A) PERT (B) CPM XAMÇ)Barchart (D) Graph
45) Which type of operation in a network rëquirés neither any tímé not anyresources?
(A) Parallel B) Dummy
46) Budgeting with Bar charthelps in the determination of
(A) Total cost of a project
(C) Serial
SUPp
(B) Direct cost of a project
(D) Redundancy

(C) Indirect cost of a project (D) Total time along with the cost of a project
47) While submittinga tender, the contractor is required to deposit some amount withthe department as a guarantee
of the tender known as
(A) eamest money (B) bank guarantee (C) security deposit D) caution money
48) In construction project planning, free float can affect which of the following?
(A)Onlythat particular activity (B) Succeding activity
(C)Overall completion (D) Preceding activity
49) A contractor agreed to build 30 temporary sheds in 90 days at a price of Rs. 10000/unit. Twenty days later, the
contractor has finished 8 sheds with an actual total cost of Rs. 85000. What is the status of the project?
(A) The project is time and cost over run (B) The project is time overrun and cost under run
(C) The project is time under run and cost over run (D) The project is time and cost underrun
50) Which one the following about controlling of a project is not true?
(A) Controlling is complementary to planning
(B) The process of controllínginvolves comparing the progress of work with the scheduled work at regular
intervals.
C) Controlling needs updated information through some system
(D) None of these
51) Ukai hydropower plant in turbine type?
(B) francis (D) none of the above
(A) Kaplan C) peitons
52) Pre-tender'stage requires
(A) acquisition of land
(B) selection of site GCSA
(C)finalization of design and preparation of estimates
(D) All of the above
53) Which estimation method is suitable for different thickness of walls and different level of foundation?
(A) Long wall short wall method (B) Centre line method
(C) Partly centre line and partly cross wall method (D) Predominant estimate method
54) Consider the following statements regarding Tenders:
of completion etc.
1.Tender notice contains documents regarding cost of project, drawings of project, time
2.Which
security money is deposited by all the bidders.
of the above statemnt(s) is/are correct?
(A) 1 only (B) 2 only (C) Both I and 2 (D) None of these
55) The technique used to protect the new framed buildings as well as for the seismic retrofitting of existing o

from earthquakes is (D) Column isolation


(A) Roof isolation (B) Wall isolation (C) Base isolation

opp. Omkar Row House, Uttran, Surat, Gujarat 3941U


US Turning Point Complex, FACEBOOK INSTAGRAM-gcsasurat
MO 84606 37673 GCSA Surat
56) The Prefabrication by detinition will be generally done in four stages. The correct ordler of their sequenee is
erection and curing (B) Casting, transportation, curing and erection
(A) Transportation, casting,
erection and transportation (D) Casting, curing, transportation and erection
(C) Casting. curing,
is
57) The fiber-reinforced concrete mainly employed the
to increase

(A) Compressive strength of the concrete (B) Tensile strength of the concrete
(C) Dynamic modulus of elasticity (D) Permeability of the conerete
58) Match the groups
A B
a) Signature bridge 1) NH 31
b) New narmada bridge 2) NH 12
3) NH 51
c)vidhyasagar setu 4) NH 48
d) coronation bridge
(A) a-3. b-4, c-1, d-2 (B) a-1, B-2, C-3, D-4 (C) a-4, B-3, c-2, d-1 (D) a-2, b-1, c-4, d-3
59) Whrch type of bearing is used only tor long span bridges in view ol their cost?
mldsteel Rocker Bearing1E E
(A) Rocker Bearing (DyElastomèricHinge Bearing
60) Which type ot bearing acoommodafas both rotation and translation through çdaformation ot the elastorner?
(A) Rocker Bearing, (B)Cast Steel Hinge (CmildSteel Rocker Báshin (D) Elastomeric Bearing
61) which type oi bearingpermitslongitudinal movement by tolling, and simultanouslyallows rotationai
movement?
(A) Reiniforçed Concrete Rocker Expansion Bearing
(B) Steel Roller -Cum-Rocker Bearing
(C) Elastomeric Bearing

ASp
(D) Allthe above
62) A Fixed béaring at one and and an expansion bearing at the other is provided in case of:
(A)Simply supported beams (B) Continuous beams
(C)Overhanging beams (D) None oflhe above
63) The bearing which allow rotation but restrict translation is:
(A) Expansion bearing (B) fixed bearing
C) Both (a) and (b) (D) None of the above ***
64) The network shown in figure below has the estimated duration (days) for each activity
Consider following statements for the given network:
marked
1) Total float for activity Fis 0
2) Free float for activity G is 6
3) Independent float for activityH is 1
4) Interfering float for activity I is 0
Correct statement (s) is/are:
(A) 1,2,4 only (B) 13,4 only C) 2, 3,40nly (D) 1,2,3 and 4
65) Consider following statements regarding project network diagram:
(i) Activity on Node (AON) does not clearlyshöv timeline for a project NS
) In activity on arrow (AOA)morearrowstequircd than AON, hence network is morecomplicated in
AOA
ii) Mostly project management software's are based on activity on arrow (AOA) method.
(iv) Activity on Node (AON) does not have dummy activities since arrows only depict dependencies.
(A) i), (ii) and (ii) only (B) (ii) and (iii) only
(C) ) and (iv) only (D) All of the above
66) Consider following statements of network:
1) Only one time estimate is required for each activity.
2) Three time estimates for each activity.
3) Time & cost are both controlling factors.
4) It is built up of Event-oriented diagram.
Which of the following statements are correct for CPM network?
(A) 1&3 (B) 2&4 (C) 1&2 (D) 3&4

505 Turning Point Complex, opp. Omkar Row House, Uttran, Surat, Gujarat 39410S
MO-84606 37673 FACEBOOK: GCSA Surat INSTAGRAM - gesasurat
67) Crashing a project would result in
1) An increases in the indirect cost
2) A decrease in indirect cost
3) A decrease in direct cost
4) An increase in direct cost.
Which of these are correct?
(A) 1& 4 (B) 1&3 (C) 2&3 (D) 2&4
68) Statement (1): In PERT method, three times estimates are given for each activity.
Statement (11): PERT method follows B-distribution curve
(A) Both statement (I) and statement (lII) are individually true statement (II) is the correct explanation of
statement (1).
(B) Both statement (I) and statement (1I) are individually true but statement (II) is not the correct
explanation of statement (1).
(C) statement (1) is true; but statement (11) is false.
(D) statement (I) is false; but statement (1)is true A
69) Which of the following statementsregarding CPM method is not correct
(A) It is an activity oriented method (B) It is preferréd forrepetitive kind of projects
(C) Time is the controlling factor (D)It is based on detefministic Approach
70) Activities A and B can.be started independently activity follows activity A, and áivity ë follows activity B.
Activity F is precededby activity A and E. Activities D and F merge at the objective event.Which one of the
following is the correct network of the project.

OR ASD
(A) (B)

(C) (D)
71) Consider following statements: In the eritical path method
Free float can be less than independent float
of construction planning.
2. Free float affects only
preceding activities
3. Excess of minimum
available time over the required activity duration is known as independent float.
4. Independent float affects
only succeeding activitiés of these statements.
the
(A) 2,3 are correct
B) 1,2 and 3 are correct
(C) 1,4 are correct (D) 1,2,3 and 4 are correct
72) The area under ß distribution curve is divided into two
equal parts by
(A) Most likely time (B) Expected time (C) Optimistic time D) Pessimistic time
73) When a project is erashed for a optimum
1) Direct cost is increased.
dúrati
2) Indirect cost is increased.
3) Direct cost is decreased.
4) Indirect cost is decreased.
(A) land4 (B) 2and3 (C) land3 (D) 2and4
74) Consider the following statements regarding resource allocation/adjustment
1) Economical utilization of resources
2) Adjustment of resources to have leave
3) Gradual increase in resources
4) Activities are so rescheduled that maximum projected need for any resource does not crosS the i O
available resources Which of these statements are
correct?
(A) 1 and 2 (B)2 and3 (C) 3 and4 (D) 2 and 4

u r i n g Point Complex, opp. Omkar Row House, Uttran, Surat, Gujarat 394105
MO:-84606 37673 FACEBOOK:- GCSA Surat INSTAGRAM-gcsasurat
75) In order to investigate a method of least-cost scheduling, which of the following assumptions made
1) The planned duration of an actiVIty can be any whole day value between the normal and crash durations
2) The direct cost of an activity 1S linear between the norimal and crash direct costs
3) The overhead costs is linear during the entire project Sclect the correct answer using the codes given
below
(A)I and 2 (B) I and 3 (C) 2 and 3 (D) 1,2 and 3
76) Cost of Owing an equipment would include
(A) Cost of depreciation. and
maintenancc repair, and fuel
(B) Cost of investment. wages of the crew and fuel
(C) Cost of fuel, lubricating oil investment depreciation
(D) Cost of investment, major repairs and depreciation
77) Match List I with List II by sclecting the options given below.
List1 List I1
Type of Bridge Span
A. Girder bridge
E X A M Y 300 to 600 m
B. Cable stayed bridgeTITIVE 2. Over 500 m

SUPPORT
C. Truss bridge 3.30 to 378 m
D. Suspension bridge 4 10 to 60-m
(A) A-2, B-3, CD-1 4,10 (B) A-3, B-2, C-1,D-4
(C)A-3, B-4,C-2, D-1 (D) A-4, B-1, C-3,D-2
78) Statement ) :Whendeveloping the time-cost study of a project as a whole,the timeseóst relationships of
every activity there in may have necessarily to be inputted.
Statement (1):Any project is constituted by all the activities therein.
A) Both Statemént () andStatement (1) are individually true and Statement(1)is the coret explanation
of Stafement ()
(B) Both Statement () and Statement B(1) are individually true but R is not thecorreetexplantion ofA
(C)Statement (1) is true but Statement (11) is false
(D) Statement (1) is false but Statement (II) is true
79) Statement (1): In resources leveling, project completion time is not extended provided there is no
constraints on availability of resources.
Statemant (I): There is generallya constraint against exceeding the project duration time.
(A) Both Statement () and Statement (II) are individually true and Statement (II) is the corret explanation
of Statement (1) .

(B) Both Statement (1) and Statement (II) are individually true but R is not the correct explanation of A
(C) Statement (1I) is true but Statement (11) is false
D) Statement () is false but Statement (II) is true
80) Which of the following quantities is not measured in square meter
(A) Brickwork in one brick thick wall (B) Painting and Distempering
(C) RCC slab roof (D) Centering and shuttering of form Work
81) Consider the following statements:
6 The capucity of Doing work byskiledlaborintiefom of quantity per day is called task or
work
(i) The outturn of brickwork in superstructure is 1 cum per mason.
ii) The outturn of RCC work is 2 cum per mason.
iv) The outturn of 12 mm thick cement plastering is 5 sqm per mason.
The incorrect statements are:
(A) i and ii (B)ii and i (C)ii and iv (D)i and iv
82)Match List i (Different items of work) with List 2 (Unit in which they are measured) and selectthe correct
answer using the code given below:
List 1: List 2:
P: Earthwork in foundation (i) Numbers
Q: Steel reinforcement Bars ii) cum
R: Door shutters (iii) sqm
S: Cement plastering on walls (iv) quintal

505 Turning Point Complex, opp. Omkar Row House, Uttran, Surat, Gujarat 394105
MO: 84606 37673 FACEBOOK- GCSA Surat
INSTAGRAM-gcsasurat
(A) P-ii.Q-i.R-iv.S-iii (B) P-ii.Q-ii.R-i, S-is
C)P-ii.Q-i.R-ii.S-iii (D) P-ii.Q-iv.R-ii.S-ii
83) The bridge having its floor flush with bed of stream is known as
(A) causeway (B) culvert (C) viaduct (D) minor bridge
s4) Ifthe width ofan excavation exceeds I.5 m for 10 sqm area with the depth not exceeding 30 cm is termed as
(A) Deep excavation (B) Surface excavation (C) Shallow excavation (D) Cutting
85) The foor provided between masonry walls below the river bed is known as
(A) wing wall (B) curtain wall (C) bed block (D) kerb
S6)The under surface of an arch is called
(A) Sofit (B) Haunch (C) Springer (D) Lancet
$7) Decrease or reduction in the value of an equipment or asset is called as:
(A) Saturation (B) Depreciation (C) Negotiation (D) Valuation
s8) Consider the following statements regarding quality control
1) t refers to absolute oonfomity to specifications.
2) It may not vouch against overspendingAMS A
3) t may unknow ingly resort to bycrdesigh in the hope of risk minimization.

PPORY
4) It is intended to reducemaîntenance costs.
Which of the above statements are cotrect?
(A) 1 and 3 only (B) 2 and3 only (C) 2 and 4 only D ) 1 and 4 only
89) Considering thefoHowing activities, the number of critical activities is
Activity
1-2
1-3
Duration
4
FOR
8
12
16 ASP
(A) 1 (B) 2 (C)3 D)4
90) Forcompletion of certain activity. time estimates obtained from two persons A and B are as foltows,
tottp
Estimate by A 12 17 21
Estimate by Q 14 15 19
Which one among A and B is more uncertain about his estimate?
(A) Both are equal (B)A (C)B (D) Can'tsay
91) For statue of unity following sentenceis nottrue ?
(A) locatíon in EQ zone - 2 trut design based on EQ zone -3
(B) For earthquake resist use two mass rmned damper
(C) A & B both true
(D) A &B both false
92) Asia's largest Rop-way length
(A) 3 kn (B) 5.3 km GCSO3km
93) Underlight housing project in rajkot type construction.
(B) precast construction
(D)45k
(A) monolithic concrete construction
(C) prefabrieated sandwidth panel (D) steel structural technology
94) In Kalpsar project which river directly not meet to reservoir.
(A) Sabarmati (B) Narmada (C) Dhadhar (D) Mahi
95) Following santance not true for sardar sarovar dam
1. concrete gravity
dam length 1310 meter
2. chute spillway & ogee spillway exist
3.Hydro electric capacity 1450 mw
4. number of gates in service spillway is 30
(A) 1,2,3,4 (C)2,3 (D) 2, 4
(B) 2,3, 11
96) How many revETsible turbine in sardar sarovar dam?
(A) 6 (B) 5 (C)4 (D) 3

505Turning Point Complex, opp. Omkar Row House, Uttran, Surat,Gujarat394105


MO:-84606 37673 FACEBOOK-GCSA Surat INSTAGRAM-gesasurat
on narmada main canal ?
97) Which is not canal siphon
(B) Banas (C) Sarsvati
(A) Vatrak (D) Orsang
98) Which true about tehri dam
height Dam 2605 m
-

1. India's highest
exist
2. morning glory chute spillway
3. exist on bhagirth river
4. earthen dam
(A) 1,2,3,4 (B) 1,2,3 (C) 4, 3, 2 (D) 3,4
99) Which of following organisation organoze a training for irrigated agriculturedisciplinary?
(A) GWSSSB (B) WALMI (C) GWRDC (D) WASMO
100) Which ofthe following pumping station of saurashtra branch canal has highest lift of water?
(A) Dhanki (B) Lakhtar (C) Bala (D) Dudhrej

(A) UuA (8)tHEl EXAMSSto


(p) siuEL iAA
102) elet Q u AurquHi A
E

JAORT
(A)1A 3h (B)1, 2 d 3 (C) 1a 2 (D)2 4 3
103) ldat Auldauzquai csa N Asc uie så:

(B) ulat 1 Uj udl 2 l


c) ua a l l Mai B. (D)aaul uai 3.
104) aEu s l ziysrt a6s Aiau idal anguael *rldl aatai dlAau üsl s Qust Ai d?
(A) ou QQAs Gu2 u i a Beeui cleuaat a .
(B) oigla Yuequ QRas ue ASIai6tlGeaizi Aaucdl uAaud ol na s

u luaaHi uLa .

106) 12LGI ALÈAU (writs) GlRI odORs AAstlatl RARL 4lè olAtl Us s8 qUGtt oiurelu SauAA
[Qs12 tell?
(A) Habeas Corpus (oiel yaelsee) (B) Prohibition (uadu)

505 Turning Point Complex, opp. Omkar Row House, Uttran, surat, Gujarat 394105
MO -84606 37673 FACEBOOK: GCSA Surat INSTAGRAM :- gesasurat
(C) Injunction (Hoil g9H) (D) Certiorari (G«iluI)

1. udotl oiugui Qaa u[ALUotl 62ulet oLetol Gca ne.


2. t l e2uitrt aiaEU SSuYI oY6Hl timet s{l R16tu

(A) 1, 2 3 (B) HI 2 3 (C) H1 1 ua 2 (D) HIA 1 ud 3

?
(A) UuA (B) asl uElGtt (C) l uEIdet (D) u2di iegl úa

aolSUpn
(A).2.34 (B) HU 1 u 2 (C) HUA 3 AA 4 (D) Ha 1. 2-3
110) euRdi inda vguel auua lAu ki su Aul auai d?

2. aus 3 ? Hl2dal Aslt is (Consolidated Fund of India) Hiell uai s2elj aj au, da arguaa
-

3. 34taa auUL a a t g l REIVNHi utia KLRU UHiBd s2auHi udedl cAsacuaI 20 aENA

4. HUuA uul olA AAUuAl Sl281xilui cUuA Gl2l oilHilBd $2U4i >UIdel zireaUotl 10

(A) 1.2. 3 a 4 (B) 41a 1, 2 ua 3 (C HLX 3 3 (D)H Ua 2

(A) HUA 2 (B) H1 1 3 (C) 1, 2 a 3 (D) HIA 2 4 3

505 Turning Point Complex, opp. Omkar Row House, Uttran, Surat, Gujarat394105
MO-84606 37673 FACEBOOK :- GCSA Surat INSTAGRAM -gcsasurat
(C) (A) Nl (8) ia
(D) (A) (B) AN NS tl

Hde isa (Electoral College) i s0x l Addd*a)3,.

3. Hd&l isa (Electoral College) j OR


si. a alu? u2 ils ue caGaol aúkalBl jegl a

(A) 1. 23 (B) UA 1 4al 3 C) HUA 1 2 D ) HUA 2 Ud 3

A) 1, 2 ol 3 (B) 1a 23ua3 (C) HA 1ud 3 (D) Ua1 Ud 2

2. HcuR Hlèj Uda uiot- Ut2a, Cuutaa ua 4 N0


3. AdAd ad uidj 2Ula aneUMELA, 6uIEaA ua 3 HeN
(A) 1,2 A 3 (B) 1 2 a 3 (C HUA1 o 3

116) ldou aLsa 1st: GCSA


(2) lot, UguA aa Hlè ceyriH qa 4alet 35 aNall

(A) HUA 1 u a 8. (B) 1 2 Us Ne .


(C) 2 3 Cusa aa d. (D) 1, 2 al 3 A us N 3

(A) L C uesiado AHaUN ueusl ausr{l dll

505 Turning Point Complex, opp. Omkar Row House, Uttran, Surat,Gujarat 394105
MO 84606 37673 FACEBOK: GCSASurat INSTAGRAM -gesasurat
(D) 6ust dHlH

119) Hlt. Ugud Hèotl oAAtt cus duI-

u A ieell sed.
S
(A) 1, 2, 3 ua 4dtir uzi B. (B) 1, 2 a 3 UZi B.
(C) 1, 3 d 4 A i S& (D) 2, 3 a 4i 8 RT FO

...

C) 3E AH* eiS3E (D) 22A


122) 25t uqHAd AA HE Uuaa dirt? uAAau 1996 1 l s0, Aui lNou kAl sal As GRe

(A) RaauAt yEld s2g uuRs


(B) uAs1ala Hlatl

124) alAELGAd Gsuta ur Aelalui Aeugd sl Asl2, ofat 18 sej L URHi «12l?
(A) Hn ésud (B) lela egHt (C) 88HA (D) yotCuzqUl sgu

505 Turning Point Complex, opp. Omkar Row House, Uttran, Surat, Gujarat 394105
MO:-84606 37673 FACEBOOK:-GCSA Surat INSTAGRAM:- gesasurat
2. Hiysrt a6soj l2a casAAL UA IAUAL ICct Hc:noj 1/10 .

4. clsucu ud aUraau-l izst AsBol utzait clsaautl euls? sè ®.


(A) $t 1,2 ud4 (B) &t 2, 3 Ud4
(C) St 1, 2 uA 3 (D) 1,2,34a4

L SUPPORTT

127) Guagukl jelai sgHctElt sè 0?


ORT FOA
1. cAsaall Healea
2. a l Ucla
ASP
A) 1 2 (B) 1 Ma 3 (C) 2 3 (D) 1 od4
128) 1ol kA si/sai Ault ui ?

(2) 2Ila Udad %ada qao1 894 oiuzgla yuzu stEL d6un ta 2003Hi uuda ed

(4) eyuAl Huè 2ula uioi a duas Asi8.


(A) Sr 1 ud 2 (B) $5rt 1. 2 3 (C) 1, 2, 3, 4 (D) 85rt3 a l 4

(A) l2tdl asiyuut IUgguRdot agua

505 Turning Point Complex, opp. Omkar Row House, Uttran, Surat, Gujarat 394105
MO 84606 37673 FACEBOOK:- GCSA Surat INSTAGRAM:-gesasurat

You might also like