Professional Documents
Culture Documents
THESE DIMENSIONS
MUST BE OBSERVED
TOP OF ANCHOR BOLT
TOP OF WASHER
7.00" .38
(17.8cm 1)
TOP OF PIER
4.38" .12
(11.1cm .3)
Important Safety Instructions _______________________________ 3 Using the Hinge Plate-Gin Pole (45 ft [13.7 m] Tower Only)_ 16
Lowering the Tower___________________________________ 17
PRIOR TO INSTALLATION________________________________ 4
Adjusting Cable Length _______________________________ 18
Introduction__________________________________________ 4
Leveling the Tower ___________________________________ 19
Building Permits & Zoning Requirements_________________ 4
Tightening Foundation Bolts ___________________________ 19
Professional Installation________________________________ 5
Siting - Finding the Best Location for Skystream___________ 6-7
APPENDICES
CONSTRUCTING THE FOUNDATION______________________ 8 Appendix A - 45 ft (13.7 m)
Foundation Drawings__________________________________ 8 Sectional Monopole Tower Foundations________________ 21
Wind Zones_ ________________________________________ 8 Appendix B - 55 ft (16.8 m)
Soil Conditions ______________________________________ 9 Sectional Monopole Tower Foundations________________ 32
Selecting A Foundation Configuration: Pier or Mat__________ 10 Appendix C - 70 ft (21.3 m)
Foundation Bolts & Templates_ _________________________ 10 Sectional Monopole Tower Foundations________________ 43
Foundation Bolts & Templates (Pier & Mat Foundations) _____ 10 Appendix D - 45 ft (13.7 m) Tower Assembly Booklet_______ 55
Positioning the Foundations Bolts (Pier & Mat Foundations) __ 10 Appendix E - 55 ft (16.8 m) Tower Assembly Booklet_______ 63
Hinge Plate & Gin Pole Installation Appendix F - 70 ft (21.3 m) Tower Assembly Booklet_______ 68
(45 ft [13.7 m] Tower Only)__________________________ 12
Electrical Conduit_____________________________________ 13
Tower Grounding_____________________________________ 13
Completing the Foundation_____________________________ 13
Sectional Monopole Tower Foundation
TOWER INSTALLATION_ _________________________________ 14 and Installation Manual
Assembling Tower Sections Using the Gin Pole Document : 3-CMLT-1409-01
Revision: A
(45 ft [13.7 m] Tower Only)__________________________ 15
Assembling the Tower Sections, 55 ft (16.7 m) Tower_______ 16
1) SAVE THESE INSTRUCTIONS. This manual contains important instructions for constructing
foundations, and raising, lowering and leveling towers that MUST be followed.
3) Read these instructions in their entirety before starting foundation construction and tower In this manual
installation.
IMPORTANT:
4) The foundations, instructions and towers described in this manual are appropriate for Southwest Please take note
Windpower Inc. Skystream 3.7 wind turbines. DO NOT INSTALL ANY OTHER TURBINE.
TIP: Helpful information
5) Install foundation and tower in accordance with National Electric Code, and all local building to ease the installation
and zoning codes and requirements.
6) Obtain building and construction permits prior to starting construction. Professional installation
highly recommended
7) Foundation concrete must be completely cured prior to installing tower [Minimum 2500 PSI,
(17235 kPa) 28 day strength]. Warning: Risk of injury or
death - proceed with extreme
8) Skystream uses high voltage and is potentially dangerous. Follow all safety precautions at all caution
times.
10) Remain at a safe distance when raising and lowering tower. NEVER stand or walk under
tower while it is being raised or lowered.
13) Always wear personal protection equipment – closed toe shoes, work gloves, safety glasses, and
hardhat.
Introduction
This manual provides information for foundation construction, tower assembly, and tower installation for the following Southwest Windpower segmented
monopole towers with a Skystream 3.7 wind turbine:
Information for construction of two types of foundation is provided. The choice of foundation will depend on local building conditions, available construction
equipment, and local regulations. The foundation types include:
• Mat Foundation – A square foundation; side dimensions vary based on wind speed, depth is approximately four feet deep depending on tower.
• Pier Foundation – A “column” shaped foundation; the diameter and depth of the column vary depending on soil conditions and maximum wind speed.
Directions for raising, leveling, and lowering the tower are provided in this manual, refer to the Skystream Owner’s Manual for instructions for bolting
Skystream on the tower.
IMPORTANT NOTE:
The foundation drawings contained in the Appendices of this manual present foundations designed in accordance with the 2006
INTERNATIONAL BUILDING CODE (IBC 2006) and ASCE 7-05 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES.
These drawings may therefore not be appropriate in localities with construction requirements that differ from these standards.
Building codes and installation requirements may vary greatly depending on state, city, and local town-
ships. Be sure to obtain all required building permits BEFORE beginning the installation. IMPORTANT: Do not pour concrete before
all required permits are obtained, inspec-
Be sure you understand all installation and inspection requirements. Many localities require inspections tions completed, and you are authorized
to proceed.
at key phases of the installation before additional work can proceed.
Professional Installation
Constructing the foundation and raising the Skystream requires in-depth knowledge of Skystream sys-
tems, specialized equipment, experience constructing concrete forms and knowledge of local zoning
and building codes and inspection requirements. Southwest Windpower requires all dealer selling and
installing Skystream systems to have completed up-to-date factory training.
Towers are not be to be installed by any unauthorized person. Dealers displaying the “Skystream
Dealer” insignia (shown here) on the Southwest Windpower Web site have completed factory training
on the correct and safe installation of the tower (and Skystream). Skystream Dealer
The optimum location to install any wind turbine, including Skystream, is often a compromise. Local building restrictions, the height of surrounding
structures, wire length, and available open space may require Skystream be installed in a less than optimum location. At a minimum try to observe
the following general rule for siting the turbine.
20
6.5ftm(6.5 m)
TIP: Your dealer can help you determine the
best location for Skystream on your property.
250 75
ft (75
m m)
Optimal Skystream location.
110’ (37 m)
Foundation Drawings
Detailed technical foundation drawings are provided in Appendices A, Tower Height Foundation Wind Zone For Dimensions See
B and C respectively. The drawings are also available on Southwest
45 ft (13.7 m) Mat 1 Appendix A, Sheet S-3A
Windpower’s website (www.skystreamenergy.com). The drawings were
prepared by Tower Engineering Professionals (TEP) of Raleigh, North 45 ft (13.7 m) Mat 2 Appendix A, Sheet S-3B
Carolina and reviewed and certified by a State of Arizona Registered 45 ft (13.7 m) Mat 3 Appendix A, Sheet S-3C
Professional Engineer. 45 ft (13.7 m) Pier 1, 2 & 3 Appendix A, Sheets S-4 & S-5
55 ft (16.8 m) Mat 1 Appendix B, Sheet S-3A
The drawings are provided as a reference to assist with obtaining building 55 ft (16.8 m) Mat 2 Appendix B, Sheet S-3B
permits and with the construction approval process.
55 ft (16.8 m) Mat 3 Appendix B, Sheet S-3C
Note the dimensions for the Pier foundations will vary based on the Soil 55 ft (16.8 m) Pier 1, 2 & 3 Appendix B, Sheets S-4 & S-5
Class and Wind Zone. The dimensions for the foundations do not vary 70 ft (21.3 m) Mat 1 Appendix C, Sheet S-3A
based on soil conditions. These foundations assume Soil Class 5 (worst 70 ft (21.3 m) Mat 2 Appendix C, Sheet S-3B
case) conditions exist and are sized accordingly. 70 ft (21.3 m) Mat 3 Appendix C, Sheet S-3C
70 ft (21.3 m) Pier 1, 2 & 3 Appendix C, Sheets S-4 & S-5
Wind Zones
Local building codes may specify the wind speed the foundation must with-
The foundation dimensions are in part dictated by the maximum anticipat- stand. If the building code does not specify a wind speed the local weather
ed wind speed the turbine will experience. A larger (or deeper) foundation service can provide maximum wind speed information.
is required to withstand higher speed winds.
The dimensions and construction details for each of the foundations will
change based on the anticipated wind speed. Refer to the accompanying TIP: Wind speed information is available with the Skylook wind
tables to determine your Wind Speed Zone and the location of the foun- assessment tool, available to authorized Skystream dealers only.
Contact your dealer support representative to learn more.
dation dimensions for your tower height and foundation type.
Wind Zones
TIP: If your installation requires “Wet Stamped” Foundation Drawings
Zone Wind Speed for your state they may be purchased from Tower Engineering
1 120 – 150 mph / 54 – 67 m / sec Professionals, Raleigh , North Carolina. Phone: 919.661.6351.
2 90 – 120 mph / 40 – 54 m / sec
3 < 90 mph / 40 m / sec
Refer to the following tables to determine your Soil Class and the location of the foundation dimensions for your tower height and foundation type.
Using the paper template supplied with the foundation bolt kit as a guide,
Foundation Bolts and Templates construct a rigid template to position the foundation bolts. Secure the foun-
dation bolts to the rigid template using the foundation nuts. Rigid templates
The 45 ft (13.7 m), 55 ft (16.8 m) and 70 ft (21.3) towers each require dif- may be fabricated using a single piece of plywood or using two pieces of
ferent foundation bolt kits as follows: plywood separated by 2 x 4 in lumber. Refer to the accompanying figures.
• 45 ft (13.7 m) Monopole Sectional Tower, use Foundation Bolt Kit 3- Warning : The foundation bolts MUST project above the foundation
CMBP-3258-01 7.0 +/- 0.38 in (18.0 cm +/- 10 mm) and be vertical and parallel to
• 55 ft (16.7 m) Monopole Sectional Tower, use Foundation Bolt Kit 3- each other. These dimensions are especially critical if the tower is to
CMBP-3259-02 be tilted into position using hinge plate kit and gin pole.
Each Foundation Bolt Kit includes hot dipped galvanized bolts, nuts and
washers constructed of the appropriate steel alloys – DO NOT SUBSTI-
TUTE ALTERNATIVE NUT BOLTS OR WASHERS.
The bolt kits differ from each other in a number of ways. The bolts for the
45 ft (13.7 m) and 55 ft (16.7 m) towers are 42 inches (16.5 cm) long
while the bolts for the 70 ft (21.3 m) tower are 52 inches (19.7 cm) long.
THESE DIMENSIONS
MUST BE OBSERVED
TOP OF ANCHOR BOLT
TOP OF WASHER
7.00" .38
(17.8cm 1)
TOP OF PIER
4.38" .12
(11.1cm .3)
5 4 3 2 1
Important Notes:
• Position the hinge plate on the foundation fully against the bolts that will
be used to secure the hinge plate. Thread three nuts onto the bolts as
shown in the accompanying figure. “snug” the nuts and then tighten an
additional ¼ turn.
• Install eight nuts and washers (washers on top of nuts) onto each of the
foundation bolts. The tops of the washers should be 4.5 inch (11 cm)
above the foundation as shown in Appendix A and the accompanying
figures.
• Install the Hinge Plate Links between the tabs of the tower base using
two 1/8 x 6 in (0.3 x 15 cm) hex head bolts supplied with the hinge
plate kit. See Step 1, Appendix A.
Make sure the threaded ends of the bolts face outward to ease disassembly.
• Assemble the lower half of the gin pole to the Hinge Plate / Tower Base
assembly and install nuts – hand tight is sufficient. See Step 3, Appendix A.
• Assemble the upper section of the gin pole to the lower section using
the 5/8-11 x 4 in (1.6-28 x 10 cm) hex head bolt – tighten securely.
See Step 4, Appendix A.
With the hinge plate bolted to the foundation, and the tower base section
bolted to the gin pole and the hinge plate; assembly of the tower sections
can begin. Refer to the “Assembling Tower Sections Using the Gin Pole (45
ft Tower Only)” section of this manual.
Electrical conduit may be cast into the foundation such that the conduit
continues below grade to electrical panel. Alternately
wire may be routed between tower base plate and foundation. Refer to
local building codes BEFORE pouring concrete.
Tower Grounding
At this point the lowest tower segment – the base - should be bolted to the • Repeat the above procedure with each tower section until all sections
hinge plate and foundation and gin pole. Perform the following steps to join are assembled. Support the tower as needed as each tower section is
the tower segments using the gin pole to assist with the process. Refer to added.
Appendix D, sheet 3, and using a permanent marker place “Minimum” and
“Maximum” slip length engagement marks at the upper end of the tower
base section.
• Inspect the mating sections of the tower for burrs and roughness and
smooth and repair as necessary.
• Align the upper and lower tower section weld seams with each other
(see figure).
• Lubricate the base section using a liquid dish soap (do not use grease
or oil as this will stain the tower) and LOOSELY assemble the base and
mid-sections.
• Run a 5/16 in (8.0 mm) grade 70 transport chain with slip hooks at each
end through the tower sections and secure a 4 x 6 x 14 in (10 x 15 x
36cm) wood block at the end of the pole. See Appendix D, Steps 5, 6
and 7.
• Support the tower midsection at its center of gravity – this will aid keep-
ing the sections aligned axially and raise the gin pole approximately 10
to 20 degrees above horizontal and insert chain links into the slotted
plates of the gin pole’s central support tube. See Appendix D, Steps 6.
for assembling the 45 ft (13.7 m) tower; with the major differences being 9. ON
10. MAK T.)
that the 55 ft tower cannot be tilted into position using a hinge plate and • Repeat the above procedure with each tower section until all sections
11. LOOKE SURE
TOW FO SEC 7
R T
12. HORIZER MA HIGH IONS A
are assembled. Support the tower as needed as each tower section is
F
gin pole, and the 55 ft tower requires “come-along” chain hoists to pull the USE ON Y BE SPO
T B T
RE M
13. WEL COMMAL PO UILT INS OR B ARKED
tower sections together instead of the using the gin pole for that purpose. added. 14. INSE D SEAM ON D SITION VER URRS O
15. USE CRT 1" BY S ON ISH DE , ANDTICAL O
AS
N THREQUIR 6
DRA OM 2 FO ALL TERG THEN R HO E FE ED
E T M BY
16. MAX W SEC -ALON OT LO OWER ENT TO CRAN RIZONALE ANINSTR
NOTE : After pulling tower sections together the tower section being
The following equipment should be on hand prior to starting the assembly REP IMUM TION G M NG
EAT S IN M
SEC L
TIO BRU E IN TAL
TO P
D MA
UCT
IO
STEPSTRAIN TOGE IMUM ILD STE NS P ICATE PLACOSITIO LE SECNS ON
process: pulled onto the lower section may or may not reach the “Design”
S9 . TH 2 E R
-14 MINIM ER UN TON L RODIOR TOHE END.
T E NS.
SWW
TION SHE
S ET 5
FOR UM TIL D CAP S IN ASS S O P RE, REMO3
insertion mark. However, each “Minimum” insertion mark MUST be
REM SLIP
AIN LENG
ESIG ACIT HOL EMB F TH
N SL Y CH ES P LY. E SEC CO VE
M M IF N
• Two chain hoist “come-alongs” with a minimum 2 ton pull capacity ING IP
SECTH MUS LENGAIN COOVIDE
R TION END ECE
S BU SSAR
covered by the corresponding upper tower section.
E
TION T BE TH IS ME D O
S OBT AC -ALO N IND
S AN
DA
LIG
ILDIN Y
G IN 4
AIN QUIR NG IV N
• Two steel rods, 24 inches long x 1 inch diameter (not provided with ED
EXC
ID
OR ED ORIS REQ UAL SE
U C
LON
GITU
DIN
EEDCHAINIRED O TIONS AL
tower) ED. C N
DES OME EACHOF TOW
IGN -ALO SID
SLIP NG E. ER.
LEN REA
• Liquid dish soap GTH CH
IS ID ES
EAL
• Short lengths of lumber to support the tower sections off the ground as
the sections are assembled.
D
and “Design” slip length engagement marks at the upper end of the
L IMP
tower base section. BE AONGIT ORT
ANT
LIG UDIN !!
DE NED A
SCATAIL C WH L SEA
LE 1 EN MW
• Lubricate the lower section using liquid dish soap, lubricate from the top :5
D
TOG RAW ELD
ETH S
ER ING SE M
C
of the section to the “Design” insertion mark. Do not use grease or oil as
this will stain the tower. B
• Align the upper and lower tower section weld seams with each other
– the weld seam of the “upper” section should lie directly over the lower
section weld seam. Loosely start inserting the lower section into the up-
per.
• Insert 24 inch long by 1 inch diameter steel rods into the holes provided
in the individual tower sections – refer to Appendix E, Sheet 4, Detail C.
A
EVE
8 NLY
16 Sectional Monopole Tower Foundation & Installation Manual, Revision A DRA
WS
ECT
SCA
LE 1
:20
ION
S TO
GET
7 HER
BY U
SING
CO
ME-
ALO
NG
6
Raising the Tower Using the Hinge Plate and Gin Pole • Observe that the anchor bolt closest to the hinge pivot axis clears the slot
(45 ft Tower Only) in the tower base. This is normally not an issue unless the anchor bolt
projection from the foundation exceeds 7.5 in (19 cm).
Refer to the Skystream Owners Manual for instructions on completing the • As the tower nears the fully vertical position it may be necessary to “lift”
electrical connections and bolting Skystream on the tower. If you have not the gin pole to slow the tower as it assumes a fully vertical position. Two
raised a tower before Southwest Windpower recommends first raising the people are required for this operation.
tower without the wind turbine installed. This provides the opportunity to • When the tower is completely vertical install the remaining nuts and
practice the procedure without risking damage to the wind turbine. washers to secure the tower to the foundation.
If the tower was raised without the turbine, refer to the section on lowering
B the tower. If the tower was raised with the turbine proceed to the section on
Leveling the Tower.
Lowering the Tower
Lowering the tower is the reverse of raising the tower. Observe the same
precautions including not passing under the tower as it is lowered and
standing well clear of cables. As with raising the tower, a minimum of three
people are recommended.
NOTES: (CONT.)
• Connect the second wire rope cable to the end of the gin pole and to the
9. MAKE SURE SECTIONS ARE MARKED AS REQUIRED BY INSTRUCTIONS ON SHEET 3
• Connect the gin pole to the lifting tab at the mid section of the tower us-
10. LOOK FOR HIGH SPOTS OR BURRS ON THE FEMALE AND MALE SECTIONS, REMOVE IF NECESSARY
11. TOWER MAY BE BUILT IN VERTICAL OR HORIZONTAL POSITIONS. SWWP RECOMMENDS BUILDING IN
“lifting” vehicle using the shackles provided.
HORIZONTAL POSITION, AND THEN CRANE INTO PLACE.
ing the wire rope cable and shackles provide with the gin pole kit.
12. USE COMMON DISH DETERGENT TO LUBRICATE THE ENDS OF THE SECTIONS AND ALIGN LONGITUDINAL F
WELD SEAMS ON ALL TOWER SECTIONS PRIOR TO ASSEMBLY.
• Start to “raise’ the tower by slowly driving the “lifting” vehicle directly away
F
13. INSERT 1" BY 2 FOOT LONG MILD STEEL RODS IN HOLES PROVIDED ON INDIVIDUAL SECTIONS OF TOWER.
• Position suitable bracing to support the tower top and keep the turbine
14. USE COME-ALONG MINIMUM 2 TON CAPACITY CHAIN COME-ALONG IS REQUIRED ON EACH SIDE.
15. DRAW SECTIONS TOGETHER UNTIL DESIGN SLIP LENGTH IS ACQUIRED OR CHAIN COME-ALONG REACHES
from the tower to take the slack out of the cable – keep the vehicle “in from contacting the ground after the tower is lowered. The bracing should
MAXIMUM STRAIN. MINIMUM SLIP LENGTH MUST BE OBTAINED OR EXCEEDED. DESIGN SLIP LENGTH IS IDEAL
16. REPEAT STEPS 9 -14 FOR REMAINING SECTIONS
line” with the tower – avoid loading the tower in a lateral direction. be located approximately 8 ft (2.4 m) from the tower top to clear the
• The vehicle should stop pulling as the end of the gin pole approaches turbine blades.
610 MIN
3-4 ft (1-1.3 m) above ground level. At this point two full size adults can • Connect the second wire rope cable to the gin pole and lowering vehicle.
complete raising the tower by pushing down on the end of the gin pole.
• Position the vehicle so there is approximately 1-2 ft (30-60 cm) of slack
E
E
25
in the cable and the vehicle is in line with lowering path of the tower.
DETAIL
MILD STEEL RODS
SCALE 1:10
D
Sectional Monopole Tower Foundation & Installation Manual, Revision A 17
IMPORTANT!!
LONGITUDINAL SEAM WELDS MUST
BE ALIGNED WHEN DRAWING SECTIONS
TOGETHER
D D
• Remove the foundation nuts and washers. • Determine the required cable length taking into account the two shack-
• Start the lowering process by having two people lift the gin pole to take les needed to connect the cable to the gin pole and the tower.
up the cable slack. Continue lifting the gin pole as the vehicle keeps the • Turn back the cable over the thimble and install the first U-Bolt clip such
cable taught. that the “U” section of the bolt is in contact with the “dead” end of the
• Once the tower passes the “balance point” the vehicle will be in control cable and is approximately 6 in (15 cm) from the base of the thimble.
of the tower lowering and the individuals at the holding the gin pole Refer to the accompanying figure.
should clear the area. • Tighten the nuts evenly, alternating from one nut to the other until reach-
• Note pulling force the tower exerts on the vehicle greatly increases as ing 30 lb-ft (41 N-m) of torque.
the tower approaches horizontal. • Install the second U-Bolt clip as near the thimble as possible. As with
the previous U-Bolt clip, tighten the nuts evenly, alternating from one nut
to the other until reaching 30 lb-ft (41 N-m) of torque.
WARNING: Someone MUST be in the vehicle at all times to con-
trol lowering the tower. The “pulling” force the tower exerts greatly
increases as the tower approaches the horizontal. In other words • Install the third U-Bolt clip midway between the other clips and tighten
the tower is lowered using the vehicle brakes to slow the descent the nuts to 30 lb-ft (41 N-m) of torque.
of the tower. During lowering keep the vehicle engine running to
• Apply a load to the cable equal or greater than the maximum anticipated
provide power brake assistance.
load (DO NOT USE THE TOWER AND TURBINE AS THE LOAD)
and retighten the nuts to 30 lb-ft (41 N-m) of torque. This step is very
important as the cable may stretch and shrink in diameter when a load is
applied effectively loosing the U-Bolt clip nuts. Note the maximum load
Adjusting Cable Length the cable will experience is approximately 2400 lb (1100 kg).
WRONG
WARNING: The TIGHTENING and RETIGHTENING of the U-
Bolt clip nuts must be accomplished as described in the instruc-
tions. Only use forged U-Bolt clips – never use malleable clips in
critical heavy duty applications such as raising the tower.
WRONG
• Level the tower on a calm day to minimize movement of Skystream. • First tighten each nut to a “snug tight” condition to secure the tower to
Start by loosening all the upper foundation nuts about a full turn. the foundation. “Snug Tight” is defined as the tightness attained by a
• Loosen and lower the four nuts on the “sides” of the foundation base “few” impacts of an impact wrench or the full effort of a man using an
plate. In other words the tower should be supported by the four “cor- ordinary spud wrench.
ner” nuts of the tower base plate. • Following the initial snug tightening, tighten each nut an additional 1/3
turn.
• Using two bubble levels set perpendicular to each other on the base
plate adjust the foundation nuts until the tower is level. Magnetic bub-
ble levels may make this process easier.
• Once the tower is level tighten all nuts and recheck level.
Observe the position of Skystream on calm days. If the wind turbine seems
to favor a single position with no wind, the tower may require fine tuning
even if it appears level using the bubble leveling technique.
32 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix A: 45 ft (13.7 m) Tower Foundations
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix B: 55 ft (16.8 m) Tower Foundations 33
34 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix B: 55 ft (16.8 m) Tower Foundations
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix B: 55 ft (16.8 m) Tower Foundations 35
36 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix B: 55 ft (16.8 m) Tower Foundations
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix B: 55 ft (16.8 m) Tower Foundations 37
38 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix B: 55 ft (16.8 m) Tower Foundations
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix B: 55 ft (16.8 m) Tower Foundations 39
40 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix B: 55 ft (16.8 m) Tower Foundations
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix B: 55 ft (16.8 m) Tower Foundations 41
42 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix B: 55 ft (16.8 m) Tower Foundations
APPENDIX c
70 ft (21.3 m)
sectional
monopole tower
foundations
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix A: 45 ft (13.7 m) Tower Foundations 43
44 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix C: 70 ft (21.3 m) Tower Foundations
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix C: 70 ft (21.3 m) Tower Foundations 45
46 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix C: 70 ft (21.3 m) Tower Foundations
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix C: 70 ft (21.3 m) Tower Foundations 47
48 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix C: 70 ft (21.3 m) Tower Foundations
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix C: 70 ft (21.3 m) Tower Foundations 49
50 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix C: 70 ft (21.3 m) Tower Foundations
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix C: 70 ft (21.3 m) Tower Foundations 51
52 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix C: 70 ft (21.3 m) Tower Foundations
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix C: 70 ft (21.3 m) Tower Foundations 53
54 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix C: 70 ft (21.3 m) Tower Foundations
4 3 2 1
APPENDIX d
REVISIONS
50.0
178.0
E
+882
13717
0
C
Southwest Windpower, Inc.
DETAIL A 1801 West Route 66
SCALE 1 : 10
569 MIN SLIP LENGTH TYPICAL INSTALLATION
Flagstaff, Arizona 86001 USA
863 DESIGN SLIP LENGTH NO REBAR SHOWN FOR CLARITY Phone: 928-779-9463
Fax: 928-779-1485
www.skystreamenergy.com
1 1 3-CMBP-3239-100 TOWER, 45 FT
8 7 6 5 4 3 2 1
REVISIONS
NOTES: UNLESS OTHERWISE STATED.
1. MINIMUM SLIP LENGTH IS 2 TIMES THE INNER DIAMETER OF THE FEMALE ZONE REV. DESCRIPTION DATE APPROVED
SECTION.
A initial release 9/20/2010 JPW
2. PARALLELISM OF BASE PLATE ASSEMBLY AND TOP PLATE WILL BE .5 .
F
F
3. INSPECT LEADING EDGES OF TOWER SECTIONS FOR BURRS. SLIP LENGTH
RANGE SHOULD BE FREE OF BURRS. TOP SECTION
SECTION C
178.0
E
E
D
SECTION B D
+882
13717
0
C C
DETAIL A
SCALE 1 : 10
569 MIN SLIP LENGTH TYPICAL INSTALLATION
3 863 DESIGN SLIP LENGTH NO REBAR SHOWN FOR CLARITY
SECTION A
B B
1 1 3-CMBP-3239-100 TOWER, 45 FT
A ITEM
NO.
qty PART NUMBER
NOMENCLATURE OR
DESCRIPTION
BILL OF MATERIALS
UNLESS OTHERWISE SPECIFIED: NAME DATE
BREAK ALL SHARP EDGES: .1 MAX
ALL INSIDE CORNERS: .3 MAX
FINISH: MAX. (MACH. SURFACES)
DRAWN S. AGUILAR 8/6/10 Flagstaff, Arizona U.S.A.
DIMENSIONS ARE IN MM
TOLERANCES: CHECKED TITLE:
A
45-19 TOWER,
ANGULAR: MACH 1/2 BEND 1/2
X = 1 ENG APPR. A
X.X = .30
X.XX = .20 MFG APPR.
X.XXX
X.XXXX
= .10
= .05 Q.A. ASSEMBLY
PROPRIETARY AND CONFIDENTIAL INTERPRET GEOMETRIC
TOLERANCING PER: ASME Y14.5M-1994 COMMENTS:
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF MATERIAL SIZE DWG. NO. REV
SEE NOTES
C A
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
USED ON
FINISH 3-CMBP-3271-100
WITHOUT THE WRITTEN PERMISSION OF NEXT ASSY
Southwest Windpower IS PROHIBITED.
SEE NOTES
APPLICATION DO NOT SCALE DRAWING SCALE: 1:40 WEIGHT: 527.27 kg SHEET 1 OF 7
8 7 6 5 4 3 2 1
56 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix D: 45 ft (13.7 m) Tower Assembly
8 7 6 5 4 3 2 1
F
F
E
E
D D
3-CMBP-3258-01
SHOWN FOR REF ONLY
C SCALE: 1:6 C
B B
Q.A. ASSEMBLY
PROPRIETARY AND CONFIDENTIAL COMMENTS:
THE INFORMATION CONTAINED IN THIS SIZE DWG. NO. REV
C A
DRAWING IS THE SOLE PROPERTY OF
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
3-CMBP-3271-100
WITHOUT THE WRITTEN PERMISSION OF
Southwest Windpower IS PROHIBITED.
SCALE: 1:40 WEIGHT: 527.27 kg SHEET 2 OF 7
8 7 6 5 4 3 2 1
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix D: 45 ft (13.7 m) Tower Assembly 57
8 7 6 5 4 3 2 1
1338
F
F
771 CG
388 MIN SLIP LENGTH
26.8 Kg SECTION WEIGHT
682 DESIGN SLIP LENGTH
4017
E
E
1922 CG
388
72.8 Kg SECTION WEIGHT
464 MIN SLIP LENGTH 682
758 DESIGN SLIP LENGTH
D
MARK WITH A PERMENENT MARKER D
THE MIN AND DESIGN SLIP LENGTHS
13717
5340
2544 CG
464
154.4 Kg SECTION WEIGHT
758
C C
5325
5232 TOWER CG
1259.0 Kg TOWER WEIGHT
B B
6 CG
1804 CG
569
517.2 Kg SECTION WEIGHT
863
NAME DATE
Q.A. ASSEMBLY
3 CG PROPRIETARY AND CONFIDENTIAL COMMENTS:
THE INFORMATION CONTAINED IN THIS SIZE DWG. NO. REV
345
C A
DRAWING IS THE SOLE PROPERTY OF
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
3-CMBP-3271-100
WITHOUT THE WRITTEN PERMISSION OF
Southwest Windpower IS PROHIBITED.
SCALE: 1:40 WEIGHT: 527.27 kg SHEET 3 OF 7
8 7 6 5 4 3 2 1
58 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix D: 45 ft (13.7 m) Tower Assembly
8 7 6 5 4 3 2 1
E
E
INSTALL SECTION A
OF TOWER
178±3
SCALE: 1:6
PART OF ITEM 2
2X BOLT
D D
PART OF ITEM 2
2X HINGE LINK
STEP 1
PART OF ITEM 2
2X CLEVIS PIN
C C
PART OF ITEM 2
2X HAIRPIN COTTER
B B
PART OF ITEM 2
HINGE PLATE
FOUNDATION
NAME DATE
Q.A. ASSEMBLY
PROPRIETARY AND CONFIDENTIAL COMMENTS:
THE INFORMATION CONTAINED IN THIS SIZE DWG. NO. REV
C A
DRAWING IS THE SOLE PROPERTY OF
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
3-CMBP-3271-100
WITHOUT THE WRITTEN PERMISSION OF
Southwest Windpower IS PROHIBITED.
SCALE: 1:40 WEIGHT: 527.27 kg SHEET 4 OF 7
8 7 6 5 4 3 2 1
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix D: 45 ft (13.7 m) Tower Assembly 59
8 7 6 5 4 3 2 1
NOTES: (CONT.)
7. INSTALL BOLTS AND WASHERS SECURING SECTION A.
8. INSTALL GIN POLE UPPER AND LOWER
F
F
E
E
PART OF ITEM 2
2X NUT
PART OF ITEM 3
NUT
D D
STEP 3
PART OF ITEM 3
GIN POLE
C C
STEP 4
PART OF ITEM 3
BOLT
B B
PART OF ITEM 3
GIN POLE
NAME DATE
Q.A. ASSEMBLY
PROPRIETARY AND CONFIDENTIAL COMMENTS:
THE INFORMATION CONTAINED IN THIS SIZE DWG. NO. REV
C A
DRAWING IS THE SOLE PROPERTY OF
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
3-CMBP-3271-100
WITHOUT THE WRITTEN PERMISSION OF
Southwest Windpower IS PROHIBITED.
SCALE: 1:40 WEIGHT: 527.27 kg SHEET 5 OF 7
8 7 6 5 4 3 2 1
60 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix D: 45 ft (13.7 m) Tower Assembly
8 7 6 5 4 3 2 1
NOTES: (CONT.)
9. INSTALL CHAIN AS SHOWN. USE PINE BLOCK ON SECTION THAT IS DRAWN
TOGETHER. USE GIN POLE TO SECURE CHAIN ON BASE SECTION SIDE.
10. CHECK SECURITY OF CHAIN.
11. USE AN AVERAGE PERSONS WEIGHT TO DRAW THE SECTIONS TOGETHER.
12. APPLY DISH DETERGENT TO BOTH MATING SURFACES OF EACH SECTION
PRIOR TO DRAWING SECTIONS TOGETHER. F
F
A
WOOD BLOCKING 5/16" CHAIN
4" X 6" STEP 7 GRADE 70
TRANSPORT
4700LB W.L.
SCALE: 1:6
D D
STEP 5
SCALE: 1:10
C DETAIL A C
SCALE 1 : 1.5
STEP 6
B B
WOOD BLOCKING
SCALE: 1:30
NAME DATE
Q.A. ASSEMBLY
PROPRIETARY AND CONFIDENTIAL COMMENTS:
THE INFORMATION CONTAINED IN THIS SIZE DWG. NO. REV
C A
DRAWING IS THE SOLE PROPERTY OF
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
3-CMBP-3271-100
WITHOUT THE WRITTEN PERMISSION OF
Southwest Windpower IS PROHIBITED.
SCALE: 1:40 WEIGHT: 527.27 kg SHEET 6 OF 7
8 7 6 5 4 3 2 1
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix D: 45 ft (13.7 m) Tower Assembly 61
B
5944
62 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix D: 45 ft (13.7 m) Tower Assembly
4 3 2 1
APPENDIX e
REVISIONS
50.0
178.0
E
+882
13717
0
C
Southwest Windpower, Inc.
DETAIL A 1801 West Route 66
SCALE 1 : 10
569 MIN SLIP LENGTH TYPICAL INSTALLATION
Flagstaff, Arizona 86001 USA
3 863 DESIGN SLIP LENGTH NO REBAR SHOWN FOR CLARITY Phone: 928-779-9463
Fax: 928-779-1485
www.skystreamenergy.com
1 1 3-CMBP-3239-100 TOWER, 45 FT
8 7 6 5 4 3 2 1
REVISIONS
NOTES: UNLESS OTHERWISE STATED.
1. MINIMUM SLIP LENGTH IS 2 TIMES THE INNER DIAMETER OF ZONE REV. DESCRIPTION DATE APPROVED
THE FEMALE SECTION.
2. PARALLELISM OF BASE PLATE ASSEMBLY AND TOP PLATE A 9/24/2010 JPW
WILL BE .5 .
3. INSPECT LEADING EDGES OF TOWER SECTIONS FOR BURRS.
SLIP LENGTH RANGE SHOULD BE FREE OF BURRS. TOWER SECTION D F
F 4. USE CRANE WITH A CAPACITY OF 5 TONS OR MORE TO ERECT
THIS TOWER.
5. LEVEL TOWER PER SOUTHWEST WINDPOWER INSTALLATION
MANUAL.
6. INPSECT TOWER TOP PLATE PARALLELISM TO TOWER BASE
PLATE. PARALLELISM: 0.5 50 TYP
7. INSPECT TOWER STAIGHTNESS. STRAIGTHNESS: 25.4 mm
8. USE STRING LINE AND TAPE MEASURE OR OTHER ADEQUATE
METHOD OF MEASUREMENT.
E
E
1
190 TYP
TOWER SECTION C
+878
16764
0
D D
715 MINIMUM SLIP LENGTH
1008 DESIGN SLIP LENGTH
TOWER SECTION B
DETAIL A
C 795 MINIMUM SLIP LENGTH SCALE 1 : 10 C
1088 DESIGN SLIP LENGTH TYPICAL INSTALL.
REBAR NOT SHOWN FOR CLARITY.
TOWER SECTION A
2
B B
B
ITEM NOMENCLATURE OR
NO.
qty PART NUMBER
DESCRIPTION
A UNLESS OTHERWISE SPECIFIED:
BILL OF MATERIALS
NAME DATE
BREAK ALL SHARP EDGES: .1 MAX
ALL INSIDE CORNERS: .3 MAX
FINISH: MAX. (MACH. SURFACES)
DRAWN JPW 09/24/2010 Flagstaff, Arizona U.S.A.
DIMENSIONS ARE IN MM
TOLERANCES: CHECKED TITLE:
A
55-23 TOWER
ANGULAR: MACH 1/2 BEND 1/2
X = 1 ENG APPR. A
X.X = .30
X.XX = .20 MFG APPR.
X.XXX
X.XXXX
= .10
= .05 Q.A. ASSEMBLY
PROPRIETARY AND CONFIDENTIAL INTERPRET GEOMETRIC
COMMENTS:
DETAIL B
THE INFORMATION CONTAINED IN THIS TOLERANCING PER: ASME Y14.5M-1994
DRAWING IS THE SOLE PROPERTY OF MATERIAL SIZE DWG. NO. REV
SCALE 1 : 10 SEE NOTES
C A
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
USED ON
FINISH 3-CMBP-3271-200
WITHOUT THE WRITTEN PERMISSION OF NEXT ASSY
Southwest Windpower IS PROHIBITED.
SEE NOTES
APPLICATION DO NOT SCALE DRAWING SCALE: 1:55 WEIGHT: 880.37 kg SHEET 1 OF 4
8 7 6 5 4 3 2 1
64 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix E: 55 ft (16.8 m) Tower Assembly
8 7 6 5 4 3 2 1
F
F
E
E
D D
3-CMBP-3259-01
SHOWN FOR REF ONLY
C C
B B
NAME DATE
Q.A. ASSEMBLY
PROPRIETARY AND CONFIDENTIAL COMMENTS:
SCALE 1:6 THE INFORMATION CONTAINED IN THIS SIZE DWG. NO. REV
C A
DRAWING IS THE SOLE PROPERTY OF
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
3-CMBP-3271-200
WITHOUT THE WRITTEN PERMISSION OF
Southwest Windpower IS PROHIBITED.
SCALE: 1:55 WEIGHT: 880.37 kg SHEET 2 OF 4
8 7 6 5 4 3 2 1
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix E: 55 ft (16.8 m) Tower Assembly 65
8 7 6 5 4 3 2 1
F
F
3753
E
E
5700
MARK WITH PERMANENT MARKER THE MIN AND DESIGN SLIP LENGTHS
715 MINIMUM SLIP LENGTH
1008 DESIGN SLIP LENGTH 4611
C C
2241 LOWER MID SECTION CG
715
198 kg SECTION WEIGHT
1008
B B
NAME DATE
C A
DRAWING IS THE SOLE PROPERTY OF
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
3-CMBP-3271-200
WITHOUT THE WRITTEN PERMISSION OF
Southwest Windpower IS PROHIBITED.
SCALE: 1:55 WEIGHT: 880.37 kg SHEET 3 OF 4
8 7 6 5 4 3 2 1
66 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix E: 55 ft (16.8 m) Tower Assembly
8 7 6 5 4 3 2 1
NOTES: (CONT.)
9. MAKE SURE SECTIONS ARE MARKED AS REQUIRED BY INSTRUCTIONS ON SHEET 3
10. LOOK FOR HIGH SPOTS OR BURRS ON THE FEMALE AND MALE SECTIONS, REMOVE IF NECESSARY
11. TOWER MAY BE BUILT IN VERTICAL OR HORIZONTAL POSITIONS. SWWP RECOMMENDS BUILDING IN
HORIZONTAL POSITION, AND THEN CRANE INTO PLACE.
12. USE COMMON DISH DETERGENT TO LUBRICATE THE ENDS OF THE SECTIONS AND ALIGN LONGITUDINAL F
F
WELD SEAMS ON ALL TOWER SECTIONS PRIOR TO ASSEMBLY.
13. INSERT 1" BY 2 FOOT LONG MILD STEEL RODS IN HOLES PROVIDED ON INDIVIDUAL SECTIONS OF TOWER.
14. USE COME-ALONG MINIMUM 2 TON CAPACITY CHAIN COME-ALONG IS REQUIRED ON EACH SIDE.
15. DRAW SECTIONS TOGETHER UNTIL DESIGN SLIP LENGTH IS ACQUIRED OR CHAIN COME-ALONG REACHES
MAXIMUM STRAIN. MINIMUM SLIP LENGTH MUST BE OBTAINED OR EXCEEDED. DESIGN SLIP LENGTH IS IDEAL
16. REPEAT STEPS 9 -14 FOR REMAINING SECTIONS
610 MIN
E
E
25
DETAIL
MILD STEEL RODS
SCALE 1:10
IMPORTANT!!
LONGITUDINAL SEAM WELDS MUST
BE ALIGNED WHEN DRAWING SECTIONS
TOGETHER
D D
DETAIL C
SCALE 1 : 5
C C
B B
SCALE 1:20
NAME DATE
Q.A. ASSEMBLY
PROPRIETARY AND CONFIDENTIAL COMMENTS:
THE INFORMATION CONTAINED IN THIS SIZE DWG. NO. REV
C A
DRAWING IS THE SOLE PROPERTY OF
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
3-CMBP-3271-200
WITHOUT THE WRITTEN PERMISSION OF
Southwest Windpower IS PROHIBITED.
SCALE: 1:55 WEIGHT: 877.33 kg SHEET 4 OF 4
8 7 6 5 4 3 2 1
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix E: 55 ft (16.8 m) Tower Assembly 67
4 3 2 1
APPENDIX f
REVISIONS
50.0
178.0
E
+882
13717
0
C
Southwest Windpower, Inc.
DETAIL A 1801 West Route 66
SCALE 1 : 10
569 MIN SLIP LENGTH TYPICAL INSTALLATION
Flagstaff, Arizona 86001 USA
3 863 DESIGN SLIP LENGTH NO REBAR SHOWN FOR CLARITY Phone: 928-779-9463
Fax: 928-779-1485
www.skystreamenergy.com
1 1 3-CMBP-3239-100 TOWER, 45 FT
8 7 6 5 4 3 2 1
A 9/26/2010 JPW
2. PARALLELISM OF BASE PLATE ASSEMBLY AND TOP PLATE WILL BE .5 .
E
190.0 TYP
E
TOWER SECTION TOP
3
3
758 DESIGN SLIP LENGTH
D D
464 MINIMUM SLIP LENGTH
TOWER SECTION D
3
863 DESIGN SLIP LENGTH
569 MINIMUM SLIP LENGTH
+1470 DETAIL A
21370
C 0 SCALE 1 : 10 C
TOWER SECTION C
NOTE:
8. A MINIMUM OF TWO FULL THREADS IS REQUIRED ABOVE TOP UNIT
9. TYPICAL INSTALLATION, REBAR NOT SHOWN FOR CLARITY.
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix F: 70 ft (21.3 m) Tower Assembly 69
8 7 6 5 4 3 2 1
F
F
E
E
D D
C C
SCALE: 1:6
3-CMBP-3260-01
SHOWN FOR REF ONLY
B B
Q.A. ASSEMBLY
584 (23") DIAMETER OF BOLT PATTERN PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS
INTERPRET GEOMETRIC
TOLERANCING PER: ASME Y14.5M-1994 COMMENTS:
DRAWING IS THE SOLE PROPERTY OF MATERIAL SIZE DWG. NO. REV
SEE NOTES
C A
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
USED ON
FINISH 3-CMBP-3271-300
WITHOUT THE WRITTEN PERMISSION OF NEXT ASSY
Southwest Windpower IS PROHIBITED.
SEE NOTES
APPLICATION DO NOT SCALE DRAWING SCALE: 1:80 WEIGHT: 1259.00 kg SHEET 2 OF 5
8 7 6 5 4 3 2 1
70 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix F: 70 ft (21.3 m) Tower Assembly
8 7 6 5 4 3 2 1
1338
282.4
1921 SECTION E CG
388
73 Kg SECTION WEIGHT
622
682 DESIGN SLIP LENGTH MARK WITH A PERMENENT MARKER
E 388 MINIMUM SLIP LENGTH THE MIN AND DESIGN SLIP LENGTHS E
5340
5340
2579 SECTION B CG
672
235 Kg SECTION WEIGHT
966
MARK WITH A PERMENENT MARKER
6624 TOWER CG THE MIN AND DESIGN SLIP LENGTHS 1485
1259 Kg TOWER WEIGHT 2840
B B
1061 DESIGN SLIP LENGTH 52 CG
73.1
770 MINIMUM SLIP LENGTH
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix F: 70 ft (21.3 m) Tower Assembly 71
8 7 6 5 4 3 2 1
NOTES:
10. MAKE SURE SECTIONS ARE MARKED AS REQUIRED BY INSTRUCTIONS ON SHEET 3 6"X6" BLOCK
11. LOOK FOR HIGH SPOTS OR BURRS ON THE FEMALE AND MALE SECTIONS
12. USE COMMON DISH DETERGENT TO LUBRICATE THE ENDS OF THE SECTIONS BEFORE
ASSEMBLING THEM. ALL LONGDITUDINAL SEAMS WELDS MUST BE ALIGNED ON ALL
TOWER SECTIONS.
13. INSTALL THE HOIST WELDMENT TRIPOD ONTO BASE SECTION AS SHOWN. USE THE SAME F
F BOLTS USED IN ASSEMBLY OF THE TOWER.
14. USE COME-ALONG TO DRAW SECTIONS TOGETHER. A MINIMUM 2 TON CAPACITY
CHAIN COME-ALONG IS REQUIRED.
15. DRAW SECTIONS TOGETHER UNTIL DESIGN SLIP LENGTH IS ACQUIRED OR CHAIN COME-
ALONG REACHES MAXIMUM STRAIN. MINIMUM SLIP LENGTH MUST BE OBTAINED OR
EXCEEDED. DESIGN SLIP LENGTH IS IDEAL.
16. STEP 1: UNNEST TOWERS AND LAY THEM OUT.
17. STEP 2: ASSEMBLE HINGED STUB SECTION TO FOUNDATION.
18. STEP 3: SEE DETAIL B.
19. STEP 4: REPEAT STEPS 3 FOR REMAINING TOWER SECTIONS
E
E
D D
B B
SCALE: 1:20
SCALE: 1:20
DETAIL B
SCALE 1 : 10
Q.A. FAB
PROPRIETARY AND CONFIDENTIAL INTERPRET GEOMETRIC
TOLERANCING PER: ASME Y14.5M-1994 COMMENTS:
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF MATERIAL SIZE DWG. NO. REV
SEE NOTES
C A
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
USED ON
FINISH 3-CMBP-3271-300
WITHOUT THE WRITTEN PERMISSION OF NEXT ASSY
Southwest Windpower IS PROHIBITED.
SEE NOTES
APPLICATION DO NOT SCALE DRAWING SCALE: 1:80 WEIGHT: 1131.92 kg SHEET 4 OF 5
8 7 6 5 4 3 2 1
72 Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix F: 70 ft (21.3 m) Tower Assembly
8 7 6 5 4 3 2 1
NOTES:
20. STEP 5: REMOVE COME-ALONG AND HOIST WELDMENT TRIPOD.
21. STEP 6: CONFIRM PROPER ASSEMBLY OF EACH SECTION.
22. STEP 7: ACTIVATE JACK TO LIFT TOWER.
23. STEP 8: WHEN TOWER IS COMPLETELY VERTICAL INSTALL BOLTS TO BASE SECTION.
F
F
E
E
TOWER SECTION E
D D
TOWER SECTION D
TOWER SECTION C
C 23 PART OF 3-CMBP-300 C
(8X BOLT, HEX M33X125)
(8X WASHER, M33)
(8X NUT, M33) TOWER SECTION B
B B
SCALE 1:50
C DETAIL C
SCALE 1 : 15
Q.A. ASSEMBLY
PROPRIETARY AND CONFIDENTIAL INTERPRET GEOMETRIC
TOLERANCING PER: ASME Y14.5M-1994 COMMENTS:
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF MATERIAL SIZE DWG. NO. REV
SEE NOTES
C A
Southwest Windpower. ANY
REPRODUCTION IN PART OR AS A WHOLE
USED ON
FINISH 3-CMBP-3271-300
WITHOUT THE WRITTEN PERMISSION OF NEXT ASSY
SEE NOTES
SCALE 1:50
Southwest Windpower IS PROHIBITED.
APPLICATION DO NOT SCALE DRAWING SCALE: 1:80 WEIGHT: 1552.30 kg SHEET 5 OF 5
8 7 6 5 4 3 2 1
Sectional Monopole Tower Foundation & Installation Manual, Rev A Appendix F: 70 ft (21.3 m) Tower Assembly 73
Southwest Windpower, Inc.
1801 West Route 66
Flagstaff, Arizona 86001
Phone: 928.779.9463
Fax: 928.779.1485
www.skystreamenergy.com