1 General Details
The Lead Bidder and Consortium
Member must be a Company
incorporated in India under the
Registration Companies Act 1956/2013/Limited Certificate of incorporation
a) Status Liability Partnership Act and MoA
2008/Partnership act 1932 for at
least 10 years with their registered
offices in India.
The Lead Bidder and Consortium Duly attested copies of
Company
b) Member should be registered under certificate should be
Documents
EPF, GST, PAN, ESI. submitted
The Bidder(s) should have
minimum average annual turnover
(MAAT) of at least INR Four
Hundred (400) crores during last
three audited financial years ending
31st March 2019 (2016-17, 2017-18 The audited balance sheet
and 2018-2019). and Profit & loss statement
In case of a consortium, the Lead for financial year 2016-17,
c) Turnover bidder should have minimum 2017-18 and 2018-2019
average annual turnover of at least are to be submitted along
INR Three Hundred and Sixty (360) with CA certificate as
crores and the other consortium documentary evidence
member of at least INR Forty (40)
crores during last three audited
financial years ending 31st March
2019 (2016-17, 2017-18 and 2018-
2019).
The audited balance sheet
The Lead Bidder and Consortium
and Profit & loss statement
Member should have positive Net
for financial year 2016-17,
Worth for the each of the last three
d) Net Worth 2017-18 and 2018-19 are
(3) Financial Years ending 31st
to be submitted along with
March 2019 (2016-17, 2017-18 and
CA certificate as
2018-2019)
documentary evidence.
The Lead Bidder should be
ISO/IEC-9001:2008/2015 OR have Copy of certification from
e) Certification at least CMM/CMMI level four (4) authorized certification
certification as on bid submission body
date.
f) Blacklisting The Lead Bidder and Consortium Self-Declaration signed by
4. New Connection
5. Disconnection &
Dismantling
6. Meter Data Acquisition
(MDAS)
7. Energy Auditing/
Accounting
8. Identity & Access
Management (IDAM)
9. Asset & Maintenance
Management
10. Customer Care Centre
(CCC)
11. Customer Relationship
Management (CRM)
12. Management Information
System (MIS)
13. Meter Data Management
(MDM)
14. Web Self Service
15. Mobile Applications for
Consumers and DISCOM
business operations
16. Document Management
System
Documentary
Sl. No. Requirements Description
Evidence
OR of Department.
Should have implemented and
completed Two (2) ERP projects
each costing not less than the
amount equal to Fifteen (15) Cr.
Documentary
Sl. No. Requirements Description
Evidence
The offered ERP OEM should
b) Implementation Self-Certification by
have at least Three
Partners Authorized Signatory
Implementation Partners in India
The offered ERP product should Work Order /Purchase
c) Cloud Based be implemented on at least One Order directly placed on
Hosting (1) Cloud based IT Infrastructure OEM /through SI along
for at least One Client Globally. with Agreement copy
Documentary
Sl. No. Requirements Description
Evidence
16. Document Management
System
The offered IT Enablement OEM
b) Implementation Self-Certification by
should have at least One (1)
Partners Authorized Signatory
Implementation Partners in India
The offered IT Enablement
Work Order /Purchase
product should be implemented
c) Cloud Based Order directly placed on
on at least One (1) Cloud based
Hosting OEM /through SI along
IT Infrastructure for at least One with Agreement copy
Client Globally.
1. GENERAL
2. FINANCIAL
Maximum Documentary
Section Criteria marks Evidence to be
provided
Presentation to be
delivered by the
Project Manager and
Assistant Project
Managers who are
proposed to be
deployed on full time
basis at client
locations until Go-
Live and should
depict SI
understanding of the
Technical Presentation extended by the System business/functional
1.1 20
Integrator to the Technical Evaluation Committee. requirements of
SBPDCL & NBPDCL
DISCOMs, BSPHCL
& BSPGCL &
proposed solution
and implementation
approach.
Note: The broad
classification for the
Presentation shall be
shared with the
Qualified SI.
Maximum Documentary
Section Criteria marks Evidence to be
provided
Human Resource/Manpower proposed 6 Marks
2.
Maximum Documentary
Section Criteria marks Evidence to be
provided
customization, implementation, Roll Out as well officer not below the
as providing FMS services / System Operation rank of Head of
services and involving at least Seven (7) of the Department.
following modules (Metering, Billing & Collection
& MDM module is mandatory) in Power Note: The
distribution company/ Utility in India: Completion
Certificate/
1. Metering Performance
2. Billing Certificate on client
3. Collection letterhead should
4. New Connection contain module
5. Disconnection & Dismantling names & consumer
6. Meter Data Acquisition (MDAS) base covered in the
7. Energy Auditing/ Accounting project
8. Identity & Access Management (IDAM)
9. Asset & Maintenance Management
10. Customer Care Centre (CCC)
11. Customer Relationship Management
(CRM)
12. Management Information System (MIS)
13. Meter Data Management (MDM)
14. Web Self Service
15. Mobile Applications for Consumers and
DISCOM business operations
16. Document Management System
Maximum Documentary
Section Criteria marks Evidence to be
provided
seven (7) financial years for a minimum
consumer base of Five (5,00,000) lakh (for
MDM minimum One (1) Lakh consumers); -
Sl. Module Name Marks
No
Any Offered
product product
Metering,
a. Billing, 3 6
Collection
Customer
Relationship
b. 0.5 1
Management
(CRM)
Smart
c. Prepaid/Postp 0.5 1
aid System
Mobile
Applications
for consumers
d. 0.5 1
and DISCOM
business
operations
Meter Data
e. Management 0.5 1
(MDM)
Maximum Documentary
Section Criteria marks Evidence to be
provided
2. At least one (1) number of the ERP
project shall have more than Two
Hundred (200) Professional user ERP
licenses
3. At least Three (3) modules out of
following functions / modules of the ERP
Product must have been implemented in
each project
a) Finance and Accounts Management
F&A
b) Material Management - MM (Stores &
Purchase)
c) Human Resource Management
including Payroll & Self Services for
Employees - HRM
d) Project Systems PS
e) Business Intelligence Reporting
(Including DMS) BI
One (1) ERP project of Twenty-Five (25) Cr
amount or 2 ERP projects each of Fifteen
(15) Cr amount 10 Marks
Maximum Documentary
Section Criteria marks Evidence to be
provided
Copy of relevant
6.1 Quadrant for Cloud Infrastructure as a service, 2
Certification
published in 2018.
d) Project Systems PS
e) Business Intelligence Reporting
(Including DMS) BI
Maximum Documentary
Section Criteria marks Evidence to be
provided
The offered IT enablement OEM product should
have been implemented in at least Three (3)
projects during the last seven (7) financial years
with at least at least Seven (7) of the following
modules in Power distribution company/utilities in
India:
1. Metering
2. Billing
8.1 3. Collection
4. New Connection
5. Disconnection & Dismantling Self-Certificate from
6. Energy Auditing/ Accounting OEM / Published
7. Asset & Maintenance Management information.
8. Customer Relationship Management
(CRM)
9. Management Information System (MIS)
10. Meter Data Management (MDM)
11. Web Self Service
Single OEM Product offered with the Following;
8.1a First 7 modules 2 Marks 4
Additional 0.5 marks for each additional module.
Maximum Documentary
Section Criteria marks Evidence to be
provided
Response Points
Compliant 2 Points
Customized Compliant 1 Point
Non-Compliant 0 Point
All line items as mentioned in FRS would
be considered along with weightage as
mentioned above. The total marks will be
awarded based on the cumulative
response and total points for each
requirement.
Marks would be awarded based as
below: (5 Marks)
95% - above - 5 Marks
90%-95% - 3 Marks
80%-90% - 1 Marks
Note: The bidder must supply the UNPRICED detailed BOM (Bill of Material) as a part of their
technical bid along with make, model and detailed specifications as well as clearly articulated and
legible architecture proposed for the solution. Bidder shall justify the solution based on expected
transactions and number of concurrent users. The proposed solution may be evaluated using the
experience of existing production environment to assess the appropriateness of design of
Transactions and Concurrent users.
Note:
a) In case of non-furnishing the requisite documents along with the bid, the bid will be considered
as non-responsive and bid may be summarily rejected.
b) In case of replacement of resources deployed by SI (any lead or supporting) equivalent or better
CV/experience to be provided with due approval from SBPDCL/NBPDCL
c) FMS not to be outsourced by bidder in any case anytime in future or duration of contract