You are on page 1of 17

Awareness on Evaluation of

PO attainment

By
Dr.P D Sudersanan
Professor, Dept. of ME
Dr. TTIT
PROGRAM OUTCOME
1. Engineering knowledge
2. Problem analysis
3. Design/development of solutions
4. Conduct investigations of complex problems
5. Modern tool usage
6. The engineer and society
7. Environment and sustainability
8. Ethics
9. Individual and team work
10. Communication
11. Project management and finance
12. Life-long learning
PO ATTAINMENT

• Use a 3 point scale for mapping CO to PO


• Get PO Mapping average for each course and
later for the entire program. (Say for PO1- 2.5)
• If mapping strength is low (fix a minimum
value) department need to address the issue
• Fix a target percentage (Say 70% - ie.PO1 -1.75)
• Compute actual attainment of POs for each batch
COURSE OUTCOME

Course Outcomes are specific and


measurable statements that define the
knowledge, skills, and attitudes
learners will demonstrate by the
completion of a course.
Revised Blooms Taxonomy
1. Set a target percentage for the course (say 50%)
2. Find the number of students scored more than the
target percentage in each CO
3. Calculate the attainment for each CO
0.98x0.4 + 0.88x0.6 = 0.92

CO Test VTU DA
CO1 0.98 0.88 0.92
CO2 0.98 0.88 0.92
CO3 0.90 0.88 0.89
CO4 0.70 0.88 0.81
CO5 0.90 0.88 0.89

CO6 0.70 0.88 0.81


0.92x0.8 + 0.935x0.2 = 0.923
CO PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12
C1 2 2.2 1.4
C2
- - - - - - - - - - - - -
C52
Avg 2.2

CO PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12
C1 1.72 1.88 1.19
C2
- - - - - - - - - - - - -
C52
Avg 1.8

Relative Actual
PO1=1.8/2.2=0.81 PO1=1.8/3=0.6
CO PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12
C1 1.72 1.88 1.19
C2
- - - - - - - - - - - - -
C52
Avg 1.8

DA of PO1=1.8/2.2=0.81 or 81%
If IDA = 0.9 through exit survey
Attainment of PO1= 0.81 x 0.8 + 0.9 x 0.2 = 0.83 or 83%
PO attainment of Project work
CO PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12
CO1 2 2 3 3 2
Project CO2 3 2 2 3 2
group-1 CO3 1 3 2 2 3 3 3 3
CO4 3 2 1 3 3 2 1 2
Avg 2.25 2.25 2 3 2.5 2.5 2.5 2 2.5

CO PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12
CO1 2 2 3 2
Project CO2 1 2 2 2
group-2 CO3 2 2 1 3 3 3 3
CO4 3 2 1 2
Avg 1.67 2 2 2.5 2.5 2 2.5

CO PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12
Mapping Avg 2 2.14 2 2 2.5 2.5 2.5 2 2.5
Project PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12
group-1 Avg 2 1.8 1.9 2.4 2.1 2.1 2.2 1.8 2.1 20

Project PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12
group-2 Avg 1.4 1.7 1.8 2.2 2.2 1.9 2 10

PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

Avg 1.8 1.76 1.26 2.2 1.4 2.13 2.2 1.83 2.06

(2 x 20 + 1.4 x 10) / (20 + 10)


Thank
you

You might also like