Professional Documents
Culture Documents
1256196-H
Design-Engineering-Fabrication
Company Profile
Page 1/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
Table of Content
3 Project Reference
4 Certification
Page 2/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
Page 3/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
Page 4/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
PDFSB
Admin Project
Electrical
&
Instrumentation
Civil Works
General Facility
Maintenance
and Cleaning
Page 5/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
Page 6/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
2.1.1
Welder Certificate
Page 7/26
2.1.2
Hydrotest Certificate
Page 8/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
Cable Laying and PMI Test for SS316 Installation of Level RTJ Orifice Plate for Hi
terminations Orifice Plates Switch Pressure Services
Multistage Orifice
Plate for Pressure
Regulation
Page 9/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
Page 10/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
Page 11/26
2 Scope of Work and Supplies
2.2.3
Transmitter Calibration Facility
Page 12/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
Page 13/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
TNB Eectrical
Substation Area
Maintenance-(After
Maintenance Picture)
Page 14/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
Reference:
3Mil to 5Mil=A,1Mil to 3Mil=B,500Kto 1Mil=C,200K to 500K=D,100K to 200K=E,Below100K=F
Page 15/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
8 KEV Hot Oil Tank Level Limit Switch Emerson Process D 2018
at Unit 1&2 installation and testing
Reference:
3Mil to 5Mil=A,1Mil to 3Mil=B,500Kto 1Mil=C,200K to 500K=D,100K to 200K=E,Below100K=F
Page 16/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
4 Pipe Rack Base and Structer for Level Emerson Process C 2019
TX Piping at KEV Kapar Unit 2
Reference:
3Mil to 5Mil=A,1Mil to 3Mil=B,500Kto 1Mil=C,200K to 500K=D,100K to 200K=E,Below100K=F
Page 17/26
3 Project Reference/ Experience
3.4
General Facility Maintenance and Cleaning
Table D: Completed projects for our General Facility Maintenance and Cleaning Works
Reference:
3Mil to 5Mil=A,1Mil to 3Mil=B,500Kto 1Mil=C,200K to 500K=D,100K to 200K=E,Below100K=F
Page 18/26
PD FABRICATOR SDN BHD
1256196-H
Design-Engineering-Fabrication
END OF DOCUMENT
Page 26/26