Handbook
Contractor
Handbook
A contractors guide to working
at Sohar Aluminium
Maximise shareholder and social value by responsible
VISION
Financial Strength
Customers
$
Retain strong position in the 1st quartile on the cost curve
Meet the highest customer expectations through quality in aluminium and power generation through ensuring
products, supply reliability and responsive employees. return on investment and cost management.
Maximize revenue growth opportunities, support Maximize the shareholders economic welfare and support
downstream industry development, and expand the company's future growth.
company’s operations through a diverse product
portfolio. Resource efficiency, waste elimination and sustainability in
the supply chain of raw materials.
VALUES
02
Objectives
You are responsible for your own Safety
Contractor Employee
Individual remunerated and supervised by the
Contractor or Sub-Contractor for the execution of
04
Contractor Classes
Look out for Safety Transgressions
Administration Workers - Companies or individuals • SA carries out audits on vendor • Valid PO/Contract.
Examples engaged to work within or on premises (Insurances, Certification, • Area Induction.
• Office cleaners. behalf of Sohar Aluminium. The EHS, Facilities, Employee Wellbeing, • Work Permits.
• Administration work being performed is not Equipment Etc.) • Understand the work requirements.
staff. hazardous nor performed within • Company registered on SA vendor • Pre-start daily
• Office equipment a hazardous location. data base. • Clear Scope of Work.
repairs. • SA vendor number issued. • Area responsible person to oversee
• Catering services. • Employee Medical Fitness Certificates work / Carry out Audits.
– Approved by SA - valid for 2 years • Adhere to SA golden rules, site rules
• Valid work Visa / Resident Card which and regulations.
should match the designation for the • Know the Area Life Saving Rules.
task they intend to perform. • Reliable and safe equipment, tools
• SA access badge (Site Induction). and material.
• Correct PPE/C for the work and
working environment.
05
Contractor Classes
Doesn’t matter how far. JUST BUCKLE UP!
06
Contractor Classes
Have another day by being Safe today!
07
Contractor Classes
Knock out…accidents
09
Inductions And Site Access
If in doubt, Ask!
• All personnel must have a valid medical fitness • Special attention must be made to Personal
certificate / resident card / work visa and have been Protective Equipment and Clothing requirements for
site inducted prior to an access card being granted the task and area.
(lost access cards will incur a OMR 5/- replacement
cost). Please keep your access card safe. • Emergency contact number from internal phones
are Smelter 3333, Power Plant 3939, and Port
• No one is allowed to let any other person use their 9991 and from a mobile phone or external line for
access card (non-adherence will result in permanent Smelter 26863333, Power Plant 26863939 and
locking out of site). Port 9991.
• Prior to starting work an area induction is required – • All walkways and access/egress points must be
contact the area responsible person. adhered to at all times.
• All personnel must ensure that they familiarize • Always seek advice from the area responsible
themselves with the site layout, highlighting assembly person if there is any uncertainty.
points, fire extinguisher points, hazardous areas and
restricted areas.
10
Sohar Aluminium 8 Golden Rules
Rule اﻟﻘﺎﻋﺪة Golden Rules اﻟﻘﻮاﻋـﺪ اﻟﺬﻫﺒﻴـﺔ Rule اﻟﻘﺎﻋﺪة Golden Rules اﻟﻘﻮاﻋـﺪ اﻟﺬﻫﺒﻴـﺔ
Seat Belts ﺣﺰام اﻣﺎن 3 Meter Safe Distance أﻣﺘﺎر ﻣﺴﺎﻓﺔ أﻣﺎن٣
All persons, including employees, ﻳﺠﺐ ﻋﻠﻰ ﻛﺎﻓﺔ اﻟﻌﺎﻣﻠﻴﻦ )اﻟﻤﻮﻇﻔﻴﻦ واﻟﻤﺘﻌﺎﻗﺪﻳﻦ All pedestrians are to maintain a safe ﻳﺠﺐ ﻋﻠﻰ ﺟﻤﻴﻊ اﻟﻤﺸﺎة اﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻰ ﻣﺴﺎﻓﺔ
contractors and visitors, are required to واﻟﺰوار( إرﺗﺪاء أﺣﺰﻣﺔ اﻣﺎن ﻓﻲ ﺟﻤﻴﻊ اﻟﻤﻌﺪات 3-meter distance from all mobile equipment أﻣﺘﺎر ﻋﻦ ﻛﺎﻓﺔ اﻟﻤﻌﺪات اﻟﻤﺘﺤﺮﻛﺔ أﺛﻨﺎء٣ أﻣﺎن
wear seatbelts in all mobile equipment. This .اﻟﻤﺘﺤﺮﻛﺔ while in operation, unless a specific task is وﻳﺴﺘﺜﻨﻰ ﻣﻦ ذﻟﻚ ﺑﻌﺾ اﻋﻤﺎل اﻟﻤﺤﺪدة،ﻋﻤﻠﻬﺎ
includes passengers. authorized by the department Manager. .ﺑﺸﺮط اﻟﺤﺼﻮل ﻋﻠﻰ ﺗﺼﺮﻳﺢ ﻣﻦ ﻣﺪﻳﺮ اﻟﻘﺴﻢ
In the Aluminium industry, mobile equipment ﺗﻌﺘﺒﺮ اﻟﻤﺮﻛﺒﺎت و اﻟﻤﻌﺪات اﻟﻤﺘﺤﺮﻛﺔ أﻛﺒﺮ ﻣﺴﺎﻫﻢ ﻓﻲ In the Aluminium industry the presence of mobile ﻳﻌﺘﺒﺮ وﺟﻮد اﻟﻤﻌﺪات اﻟﻤﺘﺤﺮﻛﺔ أﻛﺒﺮ ﻣﺴﺎﻫﻢ ﻟﻮﻗﻮع
historically has been the biggest contributor اﻟﺤﻮادث واﺻﺎﺑﺎت اﻟﺸﺨﺼﻴﺔ ﻓﻲ ﻣﺠﺎل ﺻﻨﺎﻋﺔ equipment is the biggest contributor to accidents وﻛﻘﺎﻋﺪة.اﻟﺤﻮادث واﻟﻮﻓﻴﺎت ﻓﻲ ﻣﺠﺎل ﺻﻨﺎﻋﺔ اﻟﻤﻨﻴﻮم
towards personal harm and accidents. Sohar and fatalities. As a general rule on site, all mobile ﻋﺎﻣﺔ ﻓﻲ ﻣﻮﻗﻊ ﻋﻤﻞ ﺷﺮﻛﺔ ﺻﺤﺎر أﻟﻤﻨﻴﻮم؛ ﺟﻤﻴﻊ
Aluminium has forklifts, Anode Pallet Transport و ﺗﻮﺟﺪ ﻓﻲ ﺻﺤﺎر أﻟﻤﻨﻴﻮم ﻣﻌﺪات ﻧﻘﻞ.اﻟﻤﻨﻴﻮم equipment has the right of way over pedestrians. .اﻟﻤﻌﺪات اﻟﻤﺘﺤﺮﻛﺔ ﻟﻬﺎ اوﻟﻮﻳﺔ ﻟﻠﻌﺒﻮر ﻗﺒﻞ اﻟﻤﺸﺎة
Vehicles (APTV) and Metal Transport Vehicles اﻟﻤﻌﺪن وﻣﻌﺪات ﻧﻘﻞ اﻧﻮدات واﻟﺮاﻓﻌﺎت اﻟﺸﻮﻛﻴﺔ ﺗﻌﻤﻞ This means that pedestrians need to maintain a 3
أﻣﺘﺎر٣ وﻟﺬﻟﻚ ﻳﺠﺐ ﻋﻠﻰ اﻟﻤﺸﺎة اﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻰ ﻣﺴﺎﻓﺔ
(MTV) driving around site 24 hours per day. As ووﻓﻘﺎ ﻟﻘﺎﻧﻮن اﻟﻌﻤﻞ ﻳﺠﺐ ﻋﻠﻰ. ﺳﺎﻋﺔ٢٤ ﻋﻠﻰ ﻣﺪى meters distance and wait for mobile equipment to
per Oman Law all occupants of any vehicle shall PRYHÀUVWEHIRUHWKH\FDQPRYH3HGHVWULDQVDUH
ﻛﻤﺎ ﻳﺠﺐ.أﻣﺎن واﻧﺘﻈﺎر اﻟﻤﻌﺪة اﻟﻤﺘﺤﺮﻛﺔ ﻟﻠﻌﺒﻮرأوﻻ
ﺣﻴﺚ أن, ﺟﻤﻴﻊ اﻟﺮﻛﺎب ﻓﻲ أي ﻣﺮﻛﺒﺔ إرﺗﺪاء ﺣﺰام اﻣﺎن ﻋﻠﻴﻬﻢ اﻟﺘﻮاﺻﻞ اﻟﺒﺼﺮي ﻣﻊ ﺳﺎﺋﻖ اﻟﻤﻌﺪة او اﻟﺘﻨﺒﻴﻪ
wear a seat belt. In the event of an accident the also required to make eye contact or make the
seat belt will restrict your movement and reduce ﺣﺰام اﻣﺎن ﻳﻌﻤﻞ ﻋﻠﻰ ﺗﻘﻴﻴﺪ ﺣﺮﻛﺘﻚ وﻳﻘﻠﻞ أو ﻳﻤﻨﻊ vehicle operator aware of his / her presence. The .ﺑﻮﺟﻮدﻫﻢ ﻓﻲ ﻧﻔﺲ اﻟﻤﻮﻗﻊ
or prevent the risk of serious injury or fatality. .ﺧﻄﺮ اﺻﺎﺑﺔ اﻟﺨﻄﻴﺮة أو اﻟﻮﻓﺎة ﻓﻲ ﺣﺎﻟﺔ وﻗﻮع ﺣﺎدث intent of this rule is to ensure that all the activities ﻓﺎﻟﻬﺪف ﻣﻦ ﻫﺬه اﻟﻘﺎﻋﺪة ﻫﻮ اﻟﺘﺄﻛﺪ ﻣﻦ ﺗﻘﻴﻴﻢ اﻟﻤﺨﺎﻃﺮ
Always ensure that your seatbelt is properly ﻟﺬﻟﻚ ﺗﺄﻛﺪ داﺋﻤﺎ وﻓﻲ ﻛﻞ اﻻوﻗﺎت ﻣﻦ إرﺗﺪاء ﺣﺰام اﻣﺎن where people and equipment need to interact are ﻟﺠﻤﻴﻊ اﻧﺸﻄﺔ اﻟﺘﻲ ﺗﺠﻤﻊ اﻟﻤﻌﺪات اﻟﻤﺘﺤﺮﻛﺔ ﻣﻊ
fastened and used every time you get into a .ﻋﻨﺪ رﻛﻮب أي ﻣﻌﺪة او ﻣﺮﻛﺒﺔ risk assessed and that all controls determined by اﻟﻌﺎﻣﻠﻴﻦ ووﺿﻊ ﺟﻤﻴﻊ اﻟﻀﻮاﺑﻂ اﻟﻤﻨﺎﺳﺒﺔ ﻟﻠﺤﺪ ﻣﻦ ﻫﺬه
vehicle. a Risk Assessment are implemented and اﻟﻤﺨﺎﻃﺮ ﻣﻊ ﻣﻮاﻓﻘﺔ ﻣﺪﻳﺮ اﻟﻘﺴﻢ ﻋﻠﻴﻬﺎ ﻗﺒﻞ اﻟﺒﺪء
approved by the Department Manager before the .ﺑﺘﻨﻔﻴﺬ اﻟﻤﻬﻤﺔ
task occurs.
3 meters
11
Sohar Aluminium 8 Golden Rules
Rule اﻟﻘﺎﻋﺪة Golden Rules اﻟﻘﻮاﻋـﺪ اﻟﺬﻫﺒﻴـﺔ Rule اﻟﻘﺎﻋﺪة Golden Rules اﻟﻘﻮاﻋـﺪ اﻟﺬﻫﺒﻴـﺔ
12
Sohar Aluminium 8 Golden Rules
Rule اﻟﻘﺎﻋﺪة Golden Rules اﻟﻘﻮاﻋـﺪ اﻟﺬﻫﺒﻴـﺔ Rule اﻟﻘﺎﻋﺪة Golden Rules اﻟﻘﻮاﻋـﺪ اﻟﺬﻫﺒﻴـﺔ
13
Sohar Aluminium 8 Golden Rules
Rule اﻟﻘﺎﻋﺪة Golden Rules اﻟﻘﻮاﻋـﺪ اﻟﺬﻫﺒﻴـﺔ Rule اﻟﻘﺎﻋﺪة Golden Rules اﻟﻘﻮاﻋـﺪ اﻟﺬﻫﺒﻴـﺔ
14
General Site Rules
10 fingers, 10 toes, 2 eyes, 1 nose…Safety counts
15
General Site Rules
Avoid the worst. Put Safety first.
17
General Site Rules
Being alert never hurts.
Hands and Fingers Safety • Know how the tool works and use it as intended.
Hand and Finger injuries are one of the most • Carry out pre-start task analysis and risk
common injuries at the work place. Sohar Aluminium assessments.
recognizes the risks associated with working with • Look out and Identify pinch points.
your hands and have consistently focused on • Look out and Identify sharp edges.
seeking measures to prevent injuries. • Remove rings and bracelets.
• Look out for hot surfaces.
Before starting any job follow these simple rules: • Never put your hands / fingers in the line of fire.
• Select the correct glove for the job.
• Do not use banned tools.
18
General Site Rules
Gloves Matrix
19
General Site Rules
Gloves Matrix
20
General Site Rules
Danger never takes a vacation
ﻗﻨــﺎع ﻧﺼﻒ وﺟﻬﻲ- ﻛﻴـﻒ ﺗﺮﺗﺪي ﻗﻨـﺎع اﻟﺘﻨﻔﺲ ﻛﻤﺎﻣـــﺔ- ﻛﻴـﻒ ﺗﺮﺗﺪي ﻗﻨـﺎع اﻟﺘﻨﻔﺲ
How to Wear a Respirator - Half-Face Respirator How to Wear a Respirator - Face Mask
1 2 1 2
ﻗﻢ ﺑﻀﺒﻂ ﺣﺎﻣﻞ اﻟﺮأس ﻣﻊ اﻟﺘﺄﻛﺪ ﻗﻢ ﺑﺘﺜﺒﻴﺖ اﻟﺤﺰام اﻟﺨﻠﻔﻲ ﺑﺈﺳﺘﺨﺪام .ﺿﻊ اﻟﻜﻤﺎﻣﺔ ﺣﻮل ﻓﻤﻚ وأﻧﻔﻚ اﺳﺤﺐ اﻟﺸﺮﻳﻂ اﻟﻌﻠﻮي أﻋﻠﻰ اﻟﺮأس
.ﺑﻮﺿﻊ ﺟﻬﺎز اﻟﺘﻨﻔﺲ ﻋﻠﻰ اﻟﻮﺟﻪ ﺛﻢ ﻗﻢ ﺑﺸﺪ اﻟﻄﺮﻓﻴﻦ،اﻟﻤﺸﺒﻚ ﺛﻢ ﻗﻢ ﺑﺴﺤﺐ اﻟﺸﺮﻳﻂ اﻟﺴﻔﻠﻲ
Position the mask over
"EKVTUIFBEDSBEMFTJ[FUPmU .¦ﺣﻜﺎم اﻟﻐﻠﻖ ﺣﻮل اﻟﺮﻗﺒﺔ .ﺧﻠﻒ اﻟﺮﻗﺒﺔ
your mouth and nose.
crown on head and the Hook the back straps and Pull the top strap over your
respirator over mouth and nose. tighten them by pulling the head just above your ears
ends. and pull the bottom strap
over your neck.
3 4
3
ﻗﻢ ﺑﺸﺪ اﺷﺮﻃﺔ اﻟﻌﻠﻮﻳﺔ ﻋﺒﺮ ﺳﺤﺐ ﻗﻢ ﺑﻔﺤﺺ ﻗﻨﺎع اﻟﺘﻨﻔﺲ ﻋﻦ ﻃﺮﻳﻖ
ﻧﻬﺎﻳﺎﺗﻬﺎ ﻟﺘﺤﺼﻞ ﻋﻠﻰ وﺿﻊ اﻟﻀﻐﻂ ﻋﻠﻰ اﻟﻔﻼﺗﺮ اﻟﺠﺎﻧﺒﻴﺔ وﺳﺤﺐ اﺳﺘﺨﺪم اﺻﺒﻌﻚ ﻣﻊ اﺑﻬﺎم
.ﻣﺤﻜﻢ وﻣﺮﻳﺢ ﻟﻠﺮأس اﻟﻬﻮاء ﺑﻘﻮة واﻟﺘﺄﻛﺪ ﺑﻌﺪم ) ﻛﻞ واﺣﺪة ﻓﻲ ﺟﻬﺔ ﻣﻦ اﻧﻒ( ﻟﺘﻌﺪﻳﻞ
Tighten the top straps by .وﺟﻮد ﺗﺴﺮﻳﺐ اﻟﻬﻮاء .اﻟﻜﻤﺎﻣﺔ ﻋﻠﻰ اﻧﻒ
pulling on ends to achieve Test the respirator by 6TFBmOHFSBOEUIVNC
BDPNGPSUBCMFBOETFDVSFmU pressing on the cartridges and (one on each side of nose)
inhaling deeply. to mould it to your nose.
22
General Site Rules
Half Mask & Headtop
23
General Site Rules
Dust Mask
24
General Site Rules
Chance takers are accident makers
Personal Protective Equipment / Clothing It is the Contractors’ duty to ensure that PPE/C
(PPE/C) are regularly checked and inspected. All damaged
Each contracting company is responsible for or expired PPE/C must be removed from use
supplying its employees with Personal Protective immediately. Sohar Aluminium will from time to
Equipment and clothing that meets Sohar time conduct PPE/C audits. Contractors shall
Aluminium's health and safety requirements / ensure that Personal Protective Equipment is
standards. Sohar Aluminium will only supply maintained and used by their employees and
PPE/C if previously agreed upon under the sub-contractors in relation to hazards associated
contractual agreement between the Contractor with their work. Non complying personnel will be
and Sohar Aluminium. removed from site.
ﻣﻌﺪات وﻣﻼﺑﺲ اﻟﺤﻤﺎﻳﺔ اﻟﺸﺨﺼﻴﺔ اﻟﻼزﻣﺔ ﻣﻌﺪات وﻣﻼﺑﺲ اﻟﺤﻤﺎﻳﺔ اﻟﺸﺨﺼﻴﺔ اﻟﻼزﻣﺔ ﻣﻌﺪات وﻣﻼﺑﺲ اﻟﺤﻤﺎﻳﺔ اﻟﺸﺨﺼﻴﺔ اﻟﻼزﻣﺔ ﻣﻌﺪات وﻣﻼﺑﺲ اﻟﺤﻤﺎﻳﺔ اﻟﺸﺨﺼﻴﺔ اﻟﻼزﻣﺔ ﻣﻌﺪات وﻣﻼﺑﺲ اﻟﺤﻤﺎﻳﺔ اﻟﺸﺨﺼﻴﺔ اﻟﻼزﻣﺔ ﻣﻌﺪات وﻣﻼﺑﺲ اﻟﺤﻤﺎﻳﺔ اﻟﺸﺨﺼﻴﺔ اﻟﻼزﻣﺔ
PPE/C REQUIREMENT PPE/C REQUIREMENT PPE/C REQUIREMENT PPE/C REQUIREMENT PPE/C REQUIREMENT PPE/C REQUIREMENT
*Refer to Glove matrix for specific task @ﻳﺮﺟﻰ اﻟﺮﺟﻮع إﻟﻰ ﻗﺎﺋﻤﺔ اﻟﻘﻔﺎزات اﻟﺨﺎﺻﺔ ﺑﻜﻞ ﻣﻬﻤﺔ ﻋﻤﻞ *Refer to Glove matrix for specific task @ﻳﺮﺟﻰ اﻟﺮﺟﻮع إﻟﻰ ﻗﺎﺋﻤﺔ اﻟﻘﻔﺎزات اﻟﺨﺎﺻﺔ ﺑﻜﻞ ﻣﻬﻤﺔ ﻋﻤﻞ *Refer to Glove matrix for specific task @ﻳﺮﺟﻰ اﻟﺮﺟﻮع إﻟﻰ ﻗﺎﺋﻤﺔ اﻟﻘﻔﺎزات اﻟﺨﺎﺻﺔ ﺑﻜﻞ ﻣﻬﻤﺔ ﻋﻤﻞ *Refer to Glove matrix for specific task @ﻳﺮﺟﻰ اﻟﺮﺟﻮع إﻟﻰ ﻗﺎﺋﻤﺔ اﻟﻘﻔﺎزات اﻟﺨﺎﺻﺔ ﺑﻜﻞ ﻣﻬﻤﺔ ﻋﻤﻞ *Refer to Glove matrix for specific task @ﻳﺮﺟﻰ اﻟﺮﺟﻮع إﻟﻰ ﻗﺎﺋﻤﺔ اﻟﻘﻔﺎزات اﻟﺨﺎﺻﺔ ﺑﻜﻞ ﻣﻬﻤﺔ ﻋﻤﻞ *Refer to Glove matrix for specific task @ﻳﺮﺟﻰ اﻟﺮﺟﻮع إﻟﻰ ﻗﺎﺋﻤﺔ اﻟﻘﻔﺎزات اﻟﺨﺎﺻﺔ ﺑﻜﻞ ﻣﻬﻤﺔ ﻋﻤﻞ
25
General Site Rules
Personal Protective Equipment/Clothing
26
General Site Rules
Personal Protective Equipment/Clothing
27
General Site Rules
Personal Protective Equipment/Clothing
28
General Site Rules
Mobile Equipment
Mobile Equipment name and have a red number plate, yellow plate
Only vehicles with a site access pass or escorted (private vehicles) vehicles will not be allowed on
by a Sohar Aluminium Employee will be allowed site.
into the Smelter. All mobile equipment brought
onto site must be ROP Licensed and have their Note: A SITE ACCESS PASS DOES NOT MEAN
lights on. Vehicles must be in good condition and UNRESTRICTED ACCESS TO ALL AREAS.
be inspected on a daily basis (use a vehicle
Safe Driving Checklist
checklist). Vehicles may only be operated by ROP
licensed personnel who's license is valid and
related to the vehicle being operated.
Vehicles must be registered under a company IF ANY OF THE ABOVE RULES ARE BREACHED, THE VEHICLE ACCESS PASS WILL BE REVOKED.
29
General Site Rules
Don’t be a fool. Use the proper tool.
30
General Site Rules
Get Smart! Use Safety from the start.
Working At Heights starting the work. All working at height task must
Its defined as whenever people are at risk of be stopped in bad environmental condition like
falling from, into or through one level to another rain and wind.
(above ground or below ground) Working at
height will be applicable where the distance Aluminium, metal or conductive ladders are not
between the ground surface, the person’s feet or allowed on site. Scaffolding will only be allowed
the potential fall into a next level is equal or by SA approved scaffolding vendor. Where
greater than 2 meters. Where work is carried out elevated work is undertaken, the area below shall
on a working platform where no potential to fall be suitably barricaded and signages posted for
exists, this work is not classified as working at unauthorised entry.
height. (e.g. Scaffolding permanent platforms and
Mobile elevated working platform.
32
General Site Rules
Trenching, Excavation and Demolishing
33
General Site Rules
Learn from others mistakes, don’t have others learn from yours
Permits / Risk Assessments / Work Method followed. All personnel in the work team must
Statements/ Scope of Work understand the dangers and the work to be done.
Prior to any work commencing each and every job Specialized permits exist for specific tasks e.g. Hot
must have a pre-start task analysis, risk assessment work permit, confined space permit etc.
and permit to work carried out. For detailed
engineering jobs a Scope of Work (SOW) and Work
Method Statements (WMS) must be available and
34
General Site Rules
Success is no Accident
35
General Site Rules
Safety by choice, not by chance
Suspended Loads
All lifting activities must be barricaded and a Banned Tools / Tools in Use
minimum fall radius distance maintained from the No modified tools will be allowed to be used within
furthest reach or any part of the working area. No any of SA premises. SA has identified a list of tools
work must occur under a suspended load. Where that can potentially be harmful if used incorrectly.
load rotation can occur, taglines need to be in place. These tools have been banned and are not allowed
Always ensure that loads are not left suspended on site. In addition to banned tools all electrical
longer than required. If work activities stop for the rotating equipment must not have a mechanical
day always ensure that loads are lowered and area latch to keep the equipment in the on position i.e. if
is left in a safe condition. All lifting activities shall the on button (dead man switch) is released the
have a lifting plan in place as per SA Lifting equipment must switch off. These are specifically for
Operation Standard. rotating equipment e.g. grinders, drilling machines,
blowers etc.
Adjustable Spanner Non-retractable Knife Grinders above 7 Inches Double Ended Crowbar Screw-gate Carabiner Test Lamp, Electrical Tester Cut-off Grinders
36
General Site Rules
Don’t be hasty when it comes to safety.
Jewellery Photography
Hazardous Energy Control (HEC) SA can supply contractors personal lock on a loan
HEC system has been designed to prevent injury or basis and any person receiving a temporary
damage caused by the unexpected energization or personal lock must fill in the Personal Lock Register.
start up of machinery or equipment or the
unexpected release of energy which can be highly No person is to leave site without signing off the
dangerous to persons and surroundings. All permit and removing his or her lock. Always ensure
contractors are to follow SA HEC rules when that the work area is returned to an acceptable state
working on site. It shall be the area responsible and the isolation authority consulted prior to leaving
persons duty to ensure that the equipment has been site.
isolated and safe to work on. It shall be the
contractors duty to sign on the permits and ensure Always test for live and ensure that ZERO ENERGY
that where a lock box system is used each of his/ exist before working. Contractors personal lock
her workers places a personal lock. (This procedure colour Brass with identification label.
will be made available on request)
38
General Site Rules
When you gamble with Safety…you bet your Life
39
General Site Rules
Trying to make up time could cost you your life
Heat Stress
When the body is unable to cool itself by sweating, Urine Colour
several heat-induced illnesses such as heat cramps,
heat exhaustion and the more severe heat stroke
can occur.
You are hydrated You are dehydrated You are very dehydrated
Keep it up Drink more water Drink water immediately
40
General Site Rules
Heavy Lift
41
General Site Rules
Safe crane operation is uplifting
1 2 3
43
General Site Rules
Stop! Think! Then Act!
Evacuation / Assembly Points hearing the evacuation sirens or fire alarms. The area
Prior to working in any area the area representative fire warden will conduct a role call and ascertain if
shall highlight the closest assembly point in the any person is missing. Full support shall be given to
event of an emergency or evacuation. It is your duty the fire warden. Contractors will have trained fire
to efficiently move to the closest assembly point on wardens during major outages and Projects
EVACUATION PROCEDURE
1
FIRE WHEN ALARM SOUNDS.
WARDEN LEAVE IMMEDIATELY BY
THE NEAREST EXIT.
2 PROCEED IN ORDERLY
MANNER TO ASSEMBLY POINT
44
General Site Rules
K.I.S.S – Keep it Safe and Sound
45
General Site Rules
A casual attitude towards Safety = Casualty
1. Paper Blue
2. Food waste Grey
3. Non-hazardous non-recyclable Yellow
4. Non-hazardous recyclable Green
5. Hazardous non-recyclable Red
6. Hazardous recyclable Orange
7. Medical waste Maroon
46
General Site Rules
For your health and the health of the planet
In the event of task or in the working vicinity, if contractors will need to follow new rules and
any moving scorpions, snakes, spider, etc., seen regulation (example COVID-19 Pandemic).
than do not harm them and try to move them.
Please report to the Plant Protection team Any incident concerning environment will have to
available in SA and pest control team need to be be declared and shared to the contract holder
called at 26863397. and the environment team.
47
General Site Rules
Whistleblowing Policy
If submitting a written report please reference report and results of our investigation to law
“whistle-blower matter” in your report and drop enforcement officials.
off the report in a sealed envelope addressed to
the Legal Counsel, Legal Department, Corporate 3. After your report is received, it will be
Affairs, Main Administration Building, Sohar investigated. Because the report and
Aluminium. investigation are confidential, it is at SA’s
discretion to provide details about the status or
2. The SA staff person who contacts you will ask outcome of the investigation.
a series of questions to obtain as much
information about the matter as possible. You
may choose to remain anonymous. If you opt to
identify yourself so SA can contact you for
additional information, we will make every effort
to maintain confidentiality as the investigation
proceeds. If appropriate, SA will turn over the
49
Contact Information
Alert Today. Alive Tomorrow.
Sohar Aluminium Co. LLC Civil Defence Station Suhar (Fire Brigade)
PO Box 80, Postal Code 327, Suhar Industrial City, Civil Defence Port Station
Suhar, Sultanate of Oman Tel: +968 26864497
Tel: +968 26863000 Tel: +968 26750320
Fax: +968 26883001
Email: Info@sohar-aluminium.com Emergencies Suhar Hospital
Website: www.sohar-aluminium.com Tel: +968 26840399
Tel: +968 26844555
SA Plant Protection / Emergency
SA Power Plant Emergency No.
Tel: +968 26863333
Tel: +968 26863939
50