Professional Documents
Culture Documents
(5) 動態的地球系列-東涌考察
香港地質災害的緩減措施
NSS Enriching Knowledge for the Geography Curriculum:
(5) Dynamic Earth Series – Field Trip to Tung Chung
Mitigation Measures on Geohazard in Hong Kong
土木工程拓展署 Ivan Ho
土力工程處 Geotechnical Engineer
土力工程師 Geotechnical Engineering Office
何萬里 Civil Engineering and Development Department
人造斜坡
天然山坡
Man-made
Natural Terrain
Slope
削坡 填土坡 擋土牆
Cut Slope Fill Slope Retaining Wall
削土坡 削石坡
Cut Slope 削坡
Soil Cut Slope Rock Cut Slope
Platform 平台
Fill Slope
填土坡
Retaining Wall
擋土牆牆
7 . 6 . 2008
每小時雨量145.5毫米
Hourly rainfall 145.5 mm
每年平均雨量2,400毫米
Mean annual rainfall 2,400 mm
2008年裕東路天然山坡山泥傾瀉
Yu Tung Road Natural Hillside Landslide in 2008
裕東路泥石流三維流動性模擬
3-D mobility simulation of Yu Tung Road debris flow
初始滑坡體積2,350 立方米 最後總滑坡體積(連挾帶物)3,400 立方米
Initial landslide volume 2,350 m3 Final total landslide volume (with entrainment) 3,400 m3
翔東路
Cheung Tung Road
北大嶼山公路封閉16小時
North Lantau Highway closed for 16 hours
北大嶼山公路封閉
Closure of North Lantau Highway
裕東路西行線封閉
Closure of Westbound Yu Tung Road
C15
C15
C17
C16
C17
C16
C18
C18
C24
C24
C26
C26
C29
C29
C30
C30
防止 Prevention VS 防治 Mitigation
人造斜坡
Man-made slopes
天然山坡
Natural terrains
斜坡鞏固工程
Slope stabilisation works
風險緩減措施
Risk mitigation measures
9SE-B/ND8
9SE-B/ND9
9SE-/ND10
9SE-B/ND11
9SE-B/ND1
9SE-B/ND3
9SE-B/ND4
9SE-B/ND5
泥石壩
ND8 ND9 ND10 ND11 ND1 ND3 ND4 ND5
Check Dam
容量(立方米)
2969 3790 1445 2394 820 1490 806 2900
Volume (m3)
高度(米)
6 7 5.5 5.5 4.5 5 4 7
Height (m3)
闊度(米)
22 31 18 23 18 22 18 24
Width (m3)
長度(米)
37 40 30 30 27 30 30 37
Length (m3)
9SE-B/ND8
9SE-B/ND9
9SE-/ND10
9SE-B/ND11
多謝!
Thank you!
查詢:
Enquiry: mlho@cedd.gov.hk