Professional Documents
Culture Documents
TENDER DOCUMENTS
TABLE OF CONTENTS
Instructions to Bidders (ITB)
A. General
B. Bidding Documents
C. Preparation of Bids
D. Submission of Bids
E. Bid Opening and Evaluation
F. Award of Contract
Form of Contract
Contract Schedules:
BOQ Sections
Section Description
SECTION A/B2/1
SAADIYAT CULTURAL DISTRICT AND LAGOONS ARTERIAL ROAD REMAINING INFRASTRUCTURE WORKS
SECTION A/B2/2
SAADIYAT CULTURAL DISTRICT AND LAGOONS ARTERIAL ROAD REMAINING INFRASTRUCTURE WORKS
SECTION A/B3/1
SAADIYAT CULTURAL DISTRICT AND LAGOONS ARTERIAL ROAD REMAINING INFRASTRUCTURE WORKS
SECTION A/B3/2
SAADIYAT CULTURAL DISTRICT AND LAGOONS ARTERIAL ROAD REMAINING INFRASTRUCTURE
WORKS - PACKAGE 2
SAADIYAT ISLAND, ABU DHABI, UAE
B4.3 EARTHWORKS
Excavation m3 203
Filling m3 1,121
SECTION A/B4/1
SAADIYAT CULTURAL DISTRICT AND LAGOONS ARTERIAL ROAD REMAINING INFRASTRUCTURE
WORKS - PACKAGE 2
SAADIYAT ISLAND, ABU DHABI, UAE
SECTION A/B4/2
SAADIYAT CULTURAL DISTRICT AND LAGOONS ARTERIAL ROAD REMAINING INFRASTRUCTURE
WORKS - PACKAGE 2
SAADIYAT ISLAND, ABU DHABI, UAE
B5 - TMC Building
B5.1 EARTHWORKS
Excavation m3 1,426
Backfill m3 1,358
Imported fill m3 128
Disposal m3 69
B5.2 STRUCTURAL
Cocrete m3 878
Reinforcement T 144.25
B5.3 MASONRY
External Wall m2 839
Internal Wall m2 623
B5.4 WATERPROOFING
Substructure m2 2,061
Wet areas m2 124
Roofing m2 450
B5.9 HVAC
Ductworks m2 230
SECTION A/B5/1
SECTION B - PRICING PREAMBLES
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
1.1 GENERALLY
A The Bills of Quantities herein, including all notes and instructions, shall form an integral
part of the Contract Documents. However, the descriptions contained in the Bills of
Quantities for each item are not necessarily complete.
B The Tenderer is referred to the Drawings and Specifications as well as relevant Standard
and Codes of Practice for complete information.
C The rates for each item must be comprehensive and must include for complying with the
Specifications, Drawings as well as relevant Standards and Codes of Practice and all
obligations under the Contract including all matters and things necessary for the proper
construction, completion, and maintenance of the Works. No claims for additional
payment will be allowed for any error or misunderstanding by the Contractor of the Work
involved. The Bill of Quantities shall be read in conjunction with the General Conditions
of Contract, Specifications and Drawings and the Contractor shall provide against the
bill rates or in the prices for the full scope of work covered by the Contract, no claim or
variations shall be considered on account of the Contractor’s failure to comply with this
provision.
D The Contractor is cautioned to familiarize himself with the full content of the Contract
Documents including Instruction to Bidder, General Conditions, Tender Drawings,
Specifications and any other information that can be reasonably inferred from any of
documents and all obligations contained in the documents shall be included in the item
rates and sums.
E The Contractor’s tender price shall include for supervision of any or all the trades that
are not intended to be performed with his own forces.
F The rates for each item must allow for complying in all respects with the requirements
of the Specifications and Drawings and requirement of the Client and Local Authorities
and must include for, but are not limited to the following:
i) Cutting and the consequent wastage for work in girths, width or heights,
and for all short lengths.
iii) Maintenance.
vi) Fitting and fixing materials and goods in the required and/or existing
position.
viii) Land requirement for tips and stockpiles including all cost for obtaining any
PP/1
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
ix) Temporary Works, unless separately inserted and prices by the Tenderer.
G The Tenderer shall submit together with his tender, the breakdown of the tendered rates
in the Schedule of Rate Analysis showing the percentage split of Labour, Plant and
Materials for the Works, build-up of measured rates with on-costs and overheads and
any other allowances used to arrive at the Tender Price including Primary Supplier for
the items.
H Variations - The rates inserted in the Bills of Quantities with the application of the
adjustment item will be used to value any variations to the Works, whether omissions or
additions in accordance with Conditions of Contract.
I Lump sum values shall not be inserted where unit rates are applicable, and the Tenderer
shall ensure that identical items occurring in separate bills are not priced at different
rates, unless this is the deliberate intention.
J The Tenderer shall not be entitled for any overheads, profits, builders work, etc. of any
PP/2
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
kind, with respect to the items which are deleted and/or reduced.
K The Tenderer shall not be entitled for any overheads and profit on fees, charges, deposit
paid to the various Local Authorities in connection with service connections. Building
Permit, etc.
L The quantities inserted against items in the Bill of Quantities are estimated quantities for
the Works for the purpose of Tender evaluation and the Tenderer shall be deemed to
have checked and verified such quantities in the compilation of his Tender Price prior to
the submission of his Tender. Upon the award of the Contract, the priced Bill of
Quantities shall be used solely for evaluating interim payments due to the Contractor,
and as a schedule of rates for establishing the value of variations.
M The Contractor shall not use the Bill of Quantities for the purpose of ordering materials,
construction programme or arranging Subcontracts. References to these activities shall
be the Specifications, Drawings and instructions issued by the Engineer.
N All items in the Bill of Quantities shall be deemed to have a monetary value, whether
priced or unpriced. In the absence of a unit rate or price against any item, the cost shall
be deemed to have been included elsewhere within the Contract Price and the work
ascribed to that item shall be executed by the Contractor without any additional
payment.
O Written annotations of any nature that are inserted against items in lieu of a monetary
value shall, without exception, be deemed to mean that the cost of that item is “included”
elsewhere within the Contract and the work ascribed to that item shall be executed by
the Contractor, at no additional cost.
P Any material/items required for the completion of Works whether shown or not in the
drawings, specifications and tender documents and not necessarily measured in the Bill
of Quantities; cost for such items shall be deemed to be included in the tender price.
Contractor shall not be entitled for additional cost/variation/claims for any such
items/works not covered in the Bill of Quantities but are required to complete the works.
A The quantities in the Bill of Quantities have been prepared generally in accordance with
Civil Engineering Standard Method of Measurement, 3rd Edition (1991) (CESMM3),
amended to suit local practice and conditions. The description of each item (which
description shall imply references to any headings, sub- headings, preambles or other
clauses or items which shall apply) shall be held to include all materials, workmanship,
plant and equipment including all taxes, duties, charges, all Government levies, landing
charges, transport, profit and overheads and all other incidental costs to complete the
Works.
B These preambles are to be read in conjunction with the item descriptions in the Bill of
Quantities.
C Item reference number shown in column 3 for the class of works according to CESMM
3 generally follow the convention used by CESMM3. Any deviation in the convention
shall not be the basis for a claim.
PP/3
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
Discrepancies
E In the event of there being any discrepancies between details on Drawings, descriptions
in Specifications and descriptions in the Bill of Quantities then the rates and pricing shall
be deemed to relate to the documents order of precedence set out in the Contract
Conditions. Any discrepancy arising in terms of these Preambles and the items
contained within the Bill of Quantities must be brought to the attention of the Employer
for his clarification prior to the submission of Tender. In case the clarifications are not
asked by the Contractor before submitting the tender, the decision shall be at the sole
discretion of the Engineer.
1.3 PRICING
A. The rates in the Bills of Quantity (BOQ) shall apply throughout the duration of the Contract,
to the execution of these items in any location and, except where otherwise provided for,
to any additional work instructed by the Engineer or the Authority.
B. For the purposes of this Bill of Quantities, Clause 6.1 of CESMM3 shall be modified to
read as “Rates and prices shall be inserted in the rate column of the Bill of Quantities in
United Arab Emirates Dirhams (AED), rounded to the nearest whole Dirham.
C. The Contractor is required to give a rate for each item in the BOQ and extend the same if
any BOQ item is not priced and / or extended the Contractor will undertake the work
(including supply and making good as necessary) at zero cost.
D. The unit rates inserted in the BOQ by the Contractor cover the finished work items
described, without limitation.
E. The Contractor shall ensure that identical items occurring in separate bills of the BOQ are
not priced at different rates unless the Contractor deems it necessary to do so. A brief
narrative must be provided if identical items are priced at different rates.
F. The Contractor’s unit rates including Dayworks, General Items are inclusive of the entire
Contractor’s overhead recovery and profit for all items within the BOQ.
G. The Engineer reserves the right to interpolate or extrapolate the rates, prices, sums and/
or percentages for any new items of work within the BOQ from similar items.
H. Unless otherwise stated all items are measured net and no allowance has been made for
wastage, working space, bulking or shrinkage, overlaps and the like. The rates and/or
prices for the item entered in the BOQ are fully inclusive of: -
a) the cost of completing the work including all work not specifically described but
which is incidental to, contingent on, or necessary for the completion of the work;
b) all the Contractor’s equipment, goods, plant and other necessary items,
materials, costs and expenses whatsoever which may be required for the
completion and maintenance of the Works;
PP/4
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
c) all general risks, special risks, liabilities and obligations set forth or implied in the
Contract;
e) the costs of all safe and environmentally friendly, good working practices;
f) land required for tips and stockpiles including any licenses and approvals;
I. Where fix only items are specified, the rate shall be inclusive of taking delivery, storing
and installation of goods or materials, including all accessories and associated items.
J. The Engineer and their staff’s normal working hours are as detailed in the Conditions of
Contract. These working hours are to be considered by the Contractor when pricing the
Engineer and their staffs overtime work hours.
K. The Contractor’s attention is drawn to the description of work, material and general items
set out in the Contracts documents and that they are not necessarily repeated in the BOQ.
The item quantities in the BOQ are not to be accepted as the full interpretation of the
Works. The Contractor must allow for all provisions necessary in forming the Contract
Price. Where a discrepancy occurs, it is deemed that the Contractor has allowed for the
full extent of the Works. No contract variations shall be entertained in this regard unless
expressly provided for by the Client within the Contract Documents.
L. Notwithstanding any other provision in the Contract, the Contractor shall be responsible
for, allow for all liaison and co-ordination with other Contractors undertaking construction
Works within the Site and the vicinity. The Contractor shall be fully informed of all utility
Works for the area. The Contractor shall be responsible for coordinating the interface and
scheduling of Work zones, construction schedules so as to minimize any disruptions and
delays
M. All Works associated with Utilities shall be executed in accordance with the relevant
specifications to the entire satisfaction of the concerned Authorities and the Engineer.
Pricing of Materials
PP/5
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
d) Protection of completed work, all casing and temporary coverings and making good,
cleaning and polishing and clearing away upon the completion.
e) The prices shall be comprehensive and must include for complying in all respects
with the Instruction to the Tenderers, Condition of Contract, Specification and
Drawings and for all matters and thing necessary for the proper construction,
completion and maintenance of whole work involved. No claims for additional
payment will be allowed for any error or misunderstanding by Main Contractor of
work involved.
f) Where the word "allow” is used, the cost of the item shall be responsibility of the
Main Contractor.
g) Contractor is responsible for storing the material either on project site or at any other
appropriate place (it is found fit with prior concurrence from the Engineer / Employer)
as per manufactures and supplier’s specification. All such storages, material shifting,
loading, unloading, re-shifting etc. shall be the responsibility of Contractor at their
risk and cost and Client shall be not charged for the same.
1.4 CESMM3
SECTION 1 – DEFINITIONS
A No additions or amendments.
A No additions or amendments.
"In so far as the text of an item description may conflict or be inconsistent with the
CESMM3 code following the text then the text shall always prevail".
A Paragraphs 5.22, 5.25, 5.26 and 5.27 of CESSM3 are not used.
B CESMM3 Section 5.2 is amended. Section f has been used for “Schedule of Rate
Breakdown”
PP/6
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
“5.18. The quantities shall be computed net using dimensions from the Drawings, unless
directed otherwise by a measurement rule in the CESMM3 or by the Contract, and no
allowance shall be made for bulking, shrinkage or waste. Quantities will be rounded up
or down where appropriate.”
PP/7
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
set - Set
Spec. - Specifications
SRC - Sulphate Resisting Cement
t - tonnage
thk. - thick
UC - Universal Column
uPVC - Unplasticised Polyvinyl Chloride
veh-day - Vehicle x Number of Days
W - Width
A Paragraph 6.1 of CESMM3 to state all rates and prices shall be in United Arab Emirates
Dirhams (AED).
Generally
A The BOQ for General Items comprises three (3) sections within Class A:
a) Contractual Requirements
b) Specified Requirement
c) Method Related Charges
Contractual Requirements
A The cost of procuring any guarantees, warranties and insurances required under the
Contract shall be for the Contractors account and included within the Priced BOQ.
B The cost of procuring Professional Indemnity Insurance for Contractor Design elements,
as required by the Contract, shall be for the Contractors account and be included for
within the Priced BOQ.
C Payment for the Performance Security and Insurance and the like shall be made after
approval of all the relevant documents by the Employer.
Specified Requirements
A ‘Engineer’s Site Offices and Facilities’ shall comprise, but not limited to, offices, furniture,
ventilation, heating, cooling, utility connections, utility supplies including telecom line(s),
satellite internet connections, and car parking as stipulated in all the Contract
PP/8
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
Documents.
B Payment for establishment costs relevant to these items will be Lumpsum and shall be
made only after the completion and acceptance of the facilities by the
Engineer/Employer. No part payment against this item will be permitted.
C Payment for maintenance items will be monthly commencing from the acceptance of the
establishment items from Engineer/Employer
D Payment for removal of these items will be lump sum and shall be made only after the
completion of their removal.
E Payment for transport and equipment items shall commence from the time that the
specified requirements are provided and approved.
F 'Office Equipment' shall comprise, but not limited to, information technology, IT software,
communication / telecommunication equipment, digital camera, digital video camera, all
stationary, surveying, measuring and recording equipment and safety equipment and
clothing as stipulated in all the Contract Documents.
G Fully licensed copies of the latest versions of all software, stipulated in the Contract
documents, shall be provided including licences for use in the Engineer's office. The
Software must be compatible with the Client’s systems. This shall include allowance for
the purchase, maintenance and providing updates of the software, data backup
including UPSs. Rates include all required updating or renewal of the same for the
duration of and quantities required by the Engineer Contract.
H ‘Attendance upon the Engineer’ shall comprise, but not limited to, assistance to the
Engineer and Contract administration (including cleaners, provisions of hygiene
services, office/beverage staff and services) as stipulated in all the Contract Documents.
K If any test fails, the Contractor shall re-test the sample until such times as the test is
successful. The cost of this additional testing shall be for the Contractor`s account. The
rate(s) for testing include for the taking and providing of the test sample(s) and
transportation to the laboratory identified by the Engineer to carry out the test(s).
L ‘Testing of the Works,’ in accordance with all Contract Documents, shall be priced as a
sum for the full. If the costs for completing the testing of the works exceeds the sum
inserted in the BOQ the additional costs will be for the Contractor’s account.
M ‘Temporary Traffic Diversions’ shall comprise, but not limited to, traffic diversions, traffic
regulations, temporary roads etc. as stipulated in the Contract Documents.
PP/9
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
N ‘Temporary Works’ shall comprise but not limited to, project sign boards and covers and
barricades, etc. as stipulated in the Contract Documents.
O ‘Over-Pumping and Dewatering‘ - The Contractor shall identify the appropriate pumps
and all associated equipment (including tanking if required), that it considers necessary,
to provide the necessary Over-Pumping and/or Dewatering requirements for the project
works, in accordance with all the Contract Documents, together with the duration(s) the
pumping activities and/or tanker disposal will be required on the project site. The
Contractor will use this information to calculate the sum(s) for Over-Pumping and
Dewatering requirements on the project. For each activity, Over-Pumping and/or
Dewatering, individual sums shall be provided for:
b) Operation and maintenance of the pumping equipment and disposal of water from
the site for the duration(s) identified by the Contractor.
The Contractor is fully responsible for undertaking all required over pumping and/or
dewatering required for whole duration of the works and this should be priced accordingly
within the BOQ.
A The Contractor may insert items for Method-Related charges under Bill 1 – General
Items in the BOQ.
B Method-Related charges shall be certified and paid pursuant to the relevant Clauses of
Conditions of Contract. Section 7.7 of CESMM3 is not applicable.
D Payment for establishment costs relevant to these items shall be by lump sum which will
only be made upon completion and acceptance of all facilities.
F Payment can be suspended, reduced or deleted from the Contract Payment if, in the
opinion of the Engineer, the Contractor is not fulfilling his obligation.
G ‘Contractor’s Site Facilities’ shall comprise, but not be limited to, offices, laboratories,
cabins, stores, canteens and mess rooms etc. as stipulated in the Contract Documents.
H ‘Services’ shall comprise, but not be limited to, electricity, water, security, hoardings,
site transport, personnel transport, welfare, broadband satellite internet connection(s)
as stipulated in the Contract Documents.
PP/10
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
I ‘General Requirements’ shall comprise, but not limited to, Authority supervision,
temporary controls to protect the works, location of underground services, site surveys,
progress photographs, programming the works, as built records and instruction
manuals, site superintendence, permitting requirements, cleaning the works following
completion, protection of the works, coordination with other contractors, coordination
with utility providers and Authorities, setting out the works, benchmarks and monuments,
Contractor’s mobilisation and demobilisation and operational maintenance, compliance
with Contract specification requirements and work related to utilities comprising, but not
limited to, location, identification, marking, recording etc; as stipulated in the Contract
Documents.
J As Built Records and Operation & Maintenance (Instruction) Manuals shall be fully
compliant with the requirements of all the Contract Documentation.
a) Provision and maintenance of health & safety plans, quality assurance plans,
sustainability plans, environmental plans, traffic management plans, stakeholder
management plans and logistics plans; and
b) Compliance with health & safety plans, quality assurance plans, sustainability plans,
environmental plans, traffic management plans and stakeholder management plans.
Conditions of Contract
A Payment for this item shall be pro-rata to the value of work done and shall cover all cost
and expenses including overhead and profit incurred by the Contractor in carrying out
the requirements of the Conditions of Contract not otherwise included in the Bill of
Quantities.
A Items for ground investigation shall be deemed to include testing of samples, preparation
and submission of records and results.
C The items for trial trenches and pits will be executed in accordance with the Engineer's
instructions.
D Items for ground investigation shall also include any necessary trench supports.
E The rates for boreholes shall include boring in any material and all necessary operations
for working below the water table for the support of the bore.
F The work under this Class includes providing all labour, materials, tools and equipment
necessary for demolition, clearing, grubbing, removing and disposing of all vegetation
and debris (including earthen materials incidentally removed with vegetation and debris),
and removing structures and obstructions located within the limits shown on the
PP/11
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
G The general clearance rate includes site clearance of the site by the Contractor;
including demolition and removal of all articles, objects and obstructions which are
expressly required to be cleared, other than separate items identified and set out in this
Class. The rate shall also include backfilling of voids with suitable material except as
otherwise directed.
H The work item for general site clearance shall cover the following: -
a) Removal of soil (sweet soil / topsoil), stockpiling and protection as directed by the
Engineer;
c) Removal of soil (sweet soil / topsoil) from site and deposition as directed by the
Engineer;
e) Removing of all covers and frames to existing manholes, inspection chambers and
other utilities apparatus. Storing of all such materials and reusing them in the
permanent works or disposal as directed by the Engineer;
f) Locating and marking of all existing services/utilities and ascertaining the status of
each service and determine the requirements for service operationally for the
duration of the Works. The Contractor shall take care in its operation not to interfere
with nor damage or interrupt any existing services/utilities. If the Contractor
damages any existing services/utilities it shall immediately arrange for the relevant
service stakeholder to make good such damage to match the existing and all costs
for this work shall be borne by the Contractor;
h) All temporary works and temporary connections required for the clearance and
diversion of services; and
i) Removal of all above and below ground plant / apparatus / equipment / street
j) Holes left by demolition, clearing, grubbing and removing operations shall be filled
with material approved by the Engineer and compacted to the standard specified in
the Earthworks specification.
PP/12
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
I Existing trees or bushes shown on the drawings for removal and relocation shall be
verified by the Contractor in accordance with DMAT PRFD prior to removal and
relocation as directed by the Engineer.
J The unit of measurement for take up and relocate existing trees is Numbers (nr) and the
rate shall include but not limited to the following items in the item coverage: -
d) transplanting of trees;
f) protection; and
g) all other works for removal, transplanting and protection of trees in accordance with
all Contract documentations.
K The rates include hand digging around services, where the works dictate the
requirement.
L The rates allow for the use of electronic detection (e.g. CAT Scan and the like) to locate
and identify existing services prior to any works being undertaken.
M Items for this section shall be deemed to include preparation and submission of records,
drawings and reports.
CLASS E – EARTHWORKS
A In line with CESMM3, excavation and filling rates are required for the following: -
a) Excavation in any material including running sand; rock or artificial hard material.
These rates shall not include any temporary diversions, support and protection of
any existing services and utilities, but shall include for upholding sides of excavation,
additional excavation to provide working space and removal of dead services;
PP/13
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
a) allowance for working in such a manner as not to interfere with the stability of
adjacent structures and properties and keeping the excavations free from water and
sewage whether affected by groundwater, floods, storms or otherwise.
b) all plant, materials and labour required for the excavation of and getting out from the
depth specified for any material and in any location within the site boundary,
including upholding the sides of excavation.
c) any additional excavation necessary to provide working space, refilling to any over
excavation with materials, multiple handling and stockpiling materials required for
filling anywhere on the site, breaking down material that is unsuitable in its natural
form to make it suitable for filling and blinding concrete to formation and all other
items necessary to complete the work.
d) the removal of soft spots, dead services (unless measured elsewhere) disposal of
the unsuitable material and refilling with either concrete or well compacted granular
material, as instructed.
f) allow for the provision of access and all necessary protection for Works carried out
by other contractors during rock excavation or blasting work.
g) allow for the use of mechanical plant, double handling or additional cartage of
excavated material if required.
C The unit of measurement for earthworks where measured separately shall be in Cubic
metres (m3).
D Abortive excavation for pipelines due to the relocation of works instructed by the
Engineer shall be measured in Cubic metres (m3).
E The rate for imported fill material shall include borrow pit excavation, hauling, placement
and compaction in specified layers as detailed in all the Contract Documents.
F The rates for abortive excavation for pipelines shall include for all plant, materials and
labour necessary for the excavation in natural ground backfilling with excavated material
and compaction as instructed by the Engineer and the disposal of surplus materials.
G The excavation of bitumen shall include for taking precautions to avoid damage to
property, structures, sewer drainage and services adjoining paved areas to be retained.
PP/14
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
H The deposition of fill shall include for screening, sieving and adding required sizes of
aggregates, as well as other physical/chemical treatment for suitable materials as per
the Engineer’s instruction.
I The compaction of formation shall be to the specified maximum dry density for a
specified thickness.
J The unit of measurement for unpaved verges shall be Square metres (m2) and shall be
the area calculated from the dimensions on the drawings. The coverage shall be the
trimmings, regulating and rolling of the surfaces, taking measures to protect the sub-
grades from deterioration from the use of construction plant and the ingress of water,
and the binding of rock fill.
K The quantities of earthworks shall be computed net using dimensions from the Drawings
with no allowance for bulking, shrinkage, waste or working space and the like.
L Where rock, running sand or artificial hard material are encountered in excavations for
which the Contractor requires the quantity of rock, running sand or artificial hard material
to be measured and agreed by the Engineer, for payment purposes, the Contractor shall:
a) Give the Engineer 48 hours’ notice of when an excavation, where rock, running sand
or artificial hard material is known to be present, is due to commence in order that
the levels at which the rock, running sand or artificial hard material commence and
finish can be recorded and agreed and the parameters for measurement, as
identified within the Contract documentation, confirmed.
c) The Contractor shall provide all necessary personnel and measuring/ recording
equipment, considered necessary and/or advised by the Engineer, to adequately
measure/ record the quantity of rock, running sand or artificial hard material.
Failure, by the Contractor, to notify the Engineer or comply with Engineer’s direction as
identified above may negate the Contractors claim for payment for the excavation of rock,
running sand or artificial hard material carried out in non-compliance with the above.
M Excavated material is not Contractor’s property and the disposal of the surplus
excavated material off site shall be approved by the Engineer. Shall the surplus
excavated material be suitable for backfilling, it shall be disposed on site stockpile yard
and reuse for backfilling as approved by the Engineer.
N Contractor shall seek approval from all concerned local authorities for the disposal of
surplus or unsuitable excavated materials. The rate for disposal of surplus excavated
material shall include for compliance with all the applicable regulations.
CLASS E8 LANDSCAPING
PP/15
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
Softscaping Works
A Soiling, cultivating and grading, as stipulated in all the Contract Documents. Filling with
approved topsoil for planting, supplied, spread, graded and finished.
Item Coverage:
e) Prevention of erosion.
B Planting, comprising palms, trees and plants identified in the BOQ, as stipulated in
DMAT PRFD and/or any other Contract Documents.
b) Linear metres (m) with stated number of plants per metre for hedges.
d) Square metres (m2) with stated number of plants, bulbs per Square metre (m2)
for ground cover.
Item Coverage:
a) Plants/trees;
b) Soiling, cultivating and grading, filling with approved topsoil for planting, supplied,
spread, graded and finished unless otherwise measured elsewhere;
PP/16
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
f) Cutting and treating roots, pruning and the like, including anti-desiccant and tree
wound dressings;
g) Supply and planting including backfilling hole with planting soil and firming;
i) Supports to shrubs, as required, including stakes, guys, ties and chafing guards.
Supports to trees and palms are identified and measured separately (see item C
below);
j) Trunk wrapping;
k) Labelling;
m) Temporary protection;
C Supports to trees and palms, including stakes, guys, ties and chafing guards are
measured separately for specimen trees and palms, as stipulated in DMAT PRFD,
Standard Drawing(s) and/or any other Contract Documents.
Irrigation Works
A The irrigation works included shall be as stipulated in all the Contract Documents.
B Irrigation Pipes
a) Irrigation pipe shall be measured per linear metre (m) and shall cover earthwork,
supply of material, installation, testing commissioning and all surface reinstatement.
Item Coverage
Rates for irrigation pipes shall include for the following as applicable for pressure and/or
gravity pipes:
a) supply of pipes, coupling, and all appropriate fittings, specials and jointing materials;
b) transportation and hauling about the Site, loading, unloading and laying in the trench
or fixing to appropriate structure;
d) earthworks, including:
PP/17
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
Item Coverage
a) supply of valve fittings couplings and specials for connection to adjacent network;
PP/18
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
Item Coverage
d) valve box, complete with locking cover and marker posts for RCPRV;
f) painting, lining and coating and all other ancillary works; and
a) The unit of measurement for Irrigation Control Wires is linear metre (m).
Item Coverage
a) Supply of wires, and all appropriate accessories, specials and jointing materials;
b) Transportation and hauling about the site, loading, unloading and laying or fixing to
appropriate structure;
PP/19
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
g) Breaking out existing materials and hard paving including concrete, reinforced
concrete, brickwork, stonework, drains, and coated macadam or asphalt and the
like;
j) Connections;
Hardscaping Works
Bitumen/asphalt, tile and block paving are covered in Class R – Roads and Paving of
these Preambles.
BOQ provide separate items for various ranges of boulder sizes and stone type.
The measurement of natural stone boulders shall be the complete placing of each number
as non-objected by the Engineer.
Item Coverage
d) Engineer’s approvals;
e) Bedding;
f) Compacting;
g) Curing of concrete;
PP/20
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
The units of measurement for loose aggregate/stone mulching is square metre (m2).
BOQ provides separate items for various loose aggregates/stone mulching of different
aggregate size ranges and colours.
The loose aggregates/stone mulching shall be as stipulated in all the Contract Documents.
The measurement of loose aggregates/stone mulching shall be the laid completed area
all as non-objected by the Engineer.
Item Coverage
a) Supply of materials;
c) Storing;
d) Multiple handling;
e) Bed preparation;
f) Engineer’s approval;
g) Laying of materials;
l) Compaction.
D Landscape Furniture
PP/21
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
The measurement of landscape furniture items shall be the completed installed item as
non-objected by the Engineer.
Item Coverage
The items for, but not limited to, street/park benches, litter bins, bike racks bollards (fixed
and collapsible), tree grates and drinking fountains shall include:
a) Supply;
b) Installation;
e) Compacting if required;
f) Foundations if required;
h) Engineer’s approval;
k) Finishing works, protection and cleaning before the Taking Over Date.
Item Coverage
PP/22
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
c) Storing;
d) Multiple handling;
e) Engineer’s approval;
h) Finishing works;
F Root Barrier
BOQ provide separate items for root barrier systems for different materials, gauges and
widths.
Item Coverage
a) Supply of materials;
c) Storing;
d) Multiple handling;
e) Engineer’s approval;
PP/23
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
A The carrying out of successful air or water tests as specified in the Contract documents
is a pre-requisite to the certification of payment for pipework items.
B The depth band into which a length of gravity pipeline falls is determined by averaging
the depths to invert (from original surface unless otherwise stated) at the two adjacent
manholes (or other structures or changes of pipe gradient).
C Deep connections include the provision of pipework fittings and make-up pieces, jointing
and fixing in position. The length of each connection is from the final surface to the
sewer invert level, which also determines the depth classification. Deep connections are
measured by number according to each connection depth classification. The rate
includes the mass concrete surround of the main sewer junction and the oblique
extension around the high-level lateral and forming the rodding chamber and cover slab.
Fittings for the connection are measured separately.
D Rates for sewage pumping mains, treated sewage effluent mains, water mains and fuel
line ducts include suitable marker tape.
E The rates include the giving immediate effect to instructions from the Engineer to remedy
any defects in reinstatement.
F Rates for connecting to existing pipework include for transporting, removed end caps or
fittings to drainage store as described in other classes/sections in the BOQ.
G All additional works required for the construction of gravity pipelines over existing septic
tanks, manholes, chambers or other structures, abandoned are measured as extra over
the pipelines. The unit of measurement is linear metres (m) as described in other
classes/sections in the BOQ.
H The rates for all additional works required for the construction of gravity pipelines over
abandoned septic tanks, manholes, chambers or other structures include all necessary
additional plant, materials and labour required to construct the pipeline including dealing
with and maintaining existing flows.
I The average depth to invert between termination points shall be calculated as the
average depth from existing ground level to invert level of the pipe measured at each
end of the pipeline.
J Where pipelines pass into structures and the material of the pipes in the structure walls
is different from the pipe material external to the structure then this short length of
alternative pipe material is not measured as a separate item. Any additional costs
associated with this short length of alternative pipe material are allowed for in the items
for building pipelines into structures.
K The rates for pipelines include all plant, materials and labour required to install the
pipeline in position at the depth indicated including all short lengths of pipe, make up
pieces, adaptors, couplings, trial holes carried out to locate services crossing or adjacent
to the pipeline except measured elsewhere in the BOQ.
L All temporary diversions, support and protection of any existing services and utilities,
temporary support and maintenance of the excavation, testing of pipes, stockpiling
PP/24
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
materials, breaking down material that is unsuitable in its natural form to make it suitable
for filling, are covered by other items within this BOQ.
M Excavation and getting out from any material, multiple handling, backfilling, bedding and
surround with sand, compaction, disposal of surplus material and all other items
necessary to complete the work are included in the rates provided unless otherwise
expressly stated in the BOQ.
N Where pressure pipelines pass through thrust blocks and the material of the pipes in the
thrust block is different from the pipe material external to the thrust block then this short
length of alternative pipe material is not measured as a separate item. Any additional
costs associated with this short length of alternative pipe material are allowed for in the
items for thrust blocks in Class L of the BOQ.
O Pipe Fittings shall be included in this class except expressly identified in the BOQ under
Class J.
P Other scopes not mentioned in this class but included under the Class I of CESMM3
shall be deemed included.
Q Pipework in trenches including all pipe fittings and accessories except those identified
separately in Class J; excavation in all ground conditions with the exception of running
sand and rock including disposal of excess excavated material; trench backfilling and
compaction of selected excavated material; will be paid based upon actual completed
work, agreed with the Engineer at the time of the interim payment application valuation
date, on the basis of the following partial payment instalments:
a) Excavation and removal of excavated materials from site at 25% of unit rate;
A Non-disruptive pipe laying (micro tunnelling) installation processes for pipes and ducts
as required shall be incorporated into the project as necessary.
B All non-disruptive pipe laying (micro tunnelling) works must conform to the Contract
Documents.
C The non-disruptive pipe laying (micro tunnelling) installation processes rates shall
include for all necessary works required to complete the installation, including but not
limited to the following:
a) Provision to site, placing into position, relocation and removal from site, as
necessary, of suitable micro tunnelling equipment capable of installing the pipe
diameters at the required depths, indicated in the Contract Documentation;
PP/25
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
d) All necessary caissons and grouting work as applicable / required for the selected
non-disruptive pipe laying system;
D Quantities in the BOQ for non-disruptive pipe laying (micro tunnelling) installation
processes are given in linear metres (m) measured along the centre line of the pipes.
A The carrying out of successful air or water tests as specified in the Contract documents
is a pre-requisite to the certification of payment for pipework fittings and valves items.
B The rates for fittings described above include fittings of any kind and all additional plant,
materials and labour necessary for the satisfactory installation and testing of the fittings
in accordance with all the Contract Documents at any location and at any depth.
C The rates for valves include all additional plant, materials and labour necessary for the
satisfactory installation and testing of the valves in accordance with the Specification at
any location and at any depth.
E Rates for motorised valves include power supplies and switching unless specifically
measured elsewhere.
a) Excavation;
b) Backfilling;
PP/26
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
e) Concrete works (appropriate mix grade, selected by the Contractor and approved
by the Engineer) including steel reinforcement and formwork;
h) Manhole cover and frame, GRP lining and accessories, waterproofing, water-stop;
j) Other scopes not mentioned in this class but included under Class K in CESMM3
shall be deemed included.
B Abortive excavation for manholes and inlets due to the relocation of works instructed by
the Engineer shall be measured in cubic metres (m3). The volume shall be computed
as the lesser of either the actual volume of the void produced or the product of the
average depth of the excavation from existing ground level and the plan area of the base
of the manhole, catch basin or inlet.
C Manhole Covers shall be deemed to be included in the rates provided for manholes.
D The rates for adjusting cover levels of manholes include all plant, materials and labour
required to adjust the level of covers as instructed by the Engineer including additional
courses of block work, concrete and all other works required to adjust the cover level is
measured separately in number (nr) in the BOQ.
F The rates for such connections to existing manholes or collection chambers include
dealing with and maintaining existing flows, temporary diversions, reforming of benching
and making good all finishes where necessary, additional excavation and additional
reinstatement. The rates also include the removal of any caps or plugs from existing
ports, backdrops and vertical risers and delivery of these to Authority stores. No extra
payment will be made if it is necessary to remove more than one cap or plug to make
the connection complete.
H In cases where work is required to modify the existing manhole or collection chamber
before the connection can be made i.e. making connections to existing port of larger or
smaller diameter, forming new backdrops on existing ports, building in new ports or
backdrops, converting existing vertical risers to new ports or backdrops and altering
invert levels of existing backdrops, the rates include all additional plant, materials and
labour required to carry out the alterations and make the connection including breaking
PP/27
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
into the manhole or chamber, breaking out existing works, disposal off site of abandoned
pipework and debris, building in pipes of any material, provision of rodding eye, bend,
specials, forming backdrop, additional concrete within the existing structure and
immediately outside as surround to the pipeline, additional reinforcement and also
include making a satisfactory watertight joint between the manhole or chamber wall and
pipeline, and all other works necessary for the satisfactory completion of the work.
I Concrete backfill to pipe trenches, bed and surround to pipelines and slabs over
pipelines are measured separately elsewhere in Class L.
K The rates for concrete include all plant, materials and labour required to achieve the
finished concrete or as otherwise instructed, including testing, concrete of any class,
screeds that are not included for elsewhere, formwork, finishes, tanking, lining,
expansion joints, water bars and all other works necessary for the satisfactory
completion of the work.
L The rates for soakaway(s) include all plant, materials and labour required to construct
the soakaway(s).
M The rates include the supply and handover of manhole or chamber keys.
N Manholes; (including M/H covers); and pipework ancillaries in accordance with the
Contract documents; including excavation in all materials with the exception of running
sand, rock and artificial hard materials; backfilling around with selected excavated
material will be paid based upon actual completed work, agreed with the Engineer at the
time of the interim payment application valuation date, on the basis of the following
partial payment instalments:
a) All additional excavation including excavation below ground water level and next
to and around existing services and temporary supports thereto, earthwork support
and necessary structures required to utilise excavated pit(s) as required thrust
and/or reception pit(s), installing, maintaining and observing a monitoring system
PP/28
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
during all shoring and excavation works, backfilling work around final manhole /
chamber structures and disposal of surplus fill off site;
b) All necessary temporary works to support the micro tunnelling pipe installation
processes in full compliance with all Contract Documentation and any other
applicable Health & Safety and Environmental legislation for the agreed scope of
works;
c) Obtaining necessary approval from all authorities, utilities and roads prior to
commencement of works; and
A The Contractor shall, after excavating the trench and preparing the proper bedding,
furnish all necessary facilities for properly lowering and placing sections of the pipe in
the trench without damage and shall properly install the pipe.
B Pipe bedding shall be well compacted as stipulated in all the Contract Documents and
shall completely fill the whole width of the trench excavated. Additional bedding
necessary to fill voids created by over excavation shall be provided entirely at the
Contractor's expense.
C Granular bedding material for rigid pipes shall conform to all the Contract Documents.
D The items included in the Class L of the BOQ include for bedding and surround in
materials as stated in the BOQ.
B The Contractor shall allow in the rates and prices for road works for complying with the
requirements of tolerances and procedures as stated in the Specification.
a) The units of measurement for sub-base and road base in item provided in
thickness as stated in the BOQ is square metre (m2).
b) The items for sub-base and base courses shall include the following items in the
item coverage;
PP/29
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
deterioration due to the ingress of water and the use of constructional plant;
vi. taking measures to increase the thickness and/or strength of the sub-base
to protect the sub-base and sub-grade from damage due to the
Contractors method of construction and choice of constructional plant;
vii. shaping to cambers, falls and crowns.
D Flexible Surfacing
a) The units of measurement for base course and wearing course in item provided in
range of thickness as stated in the BOQ is square metre (m2).
b) Bituminous spray forming an integral part of any specified group or type of flexible
surfacing shall be measured separately in square metre (m2) of coverage. As
clarified further in items h) below.
c) The items for base course and wearing course shall include the following items in
the item coverage;
d) The item for the removal of flexible asphalt surface shall be measured in square
metre (m2) and shall have the following items to the item coverage;
PP/30
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
f) The item for joint for tie-in between existing unsealed track and new flexible
pavement shall be measured in linear metre (m) and shall have the following
items to the item coverage:
i. edge support;
ii. slurry sealing and bituminous spray as required;
iii. saw cutting, scarifying existing asphalt, all necessary operations required
for jointing and preparation of surfaces of various pavement layers including
sub-base and road base. The rates shall allow for working in narrow widths
and include for the pavement layers extending into existing pavement and
the prime coat / tack coat to pavement surfaces.
g) The rate for cold planing (milling) also includes sweeping and cleaning of the final
surface prior to receiving tack coat. The rates for cold planning (milling) shall be
based on the nominal milling depth stated in the item description, plus or minus
10mm.
h) Bituminous spray(s) either prime coat or tack coat shall be measured separately
in square metre (m2) of coverage as follows:
i. Prime coat – The BOQ area allows for prime coat between non bituminous
and bituminous courses (e.g. between imported granular sub-base course
and bituminous base course) the area shall be multiplied by the number of
coats specified within the Specification;
ii. Tack coat – The BOQ area allows for tack coats between bituminous
courses (e.g. between bituminous base, intermediate and wearing courses)
the areas shall be multiplied by the number of coats specified within the
Specification. The Contractor is to allow in his rates any additional tack
coat(s) that may be required between layers within a particular course (e.g.
combining 2 or 3 layers of bituminous base to form a very thick layer) as
specified within the Specification.
ii. The items for kerbing, channelling and edging shall include the following
PP/31
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
• edge support;
• laying to falls;
• straight, circular and radial cutting and fitting;
• making, filling and sealing joints;
• surface finishing, curing and protecting;
• samples for testing;
• provision of suppliers / manufacturers test certificates;
• drainage holes or pipes through concrete; and
• disposal of surplus materials.
ii. The item for granular sub-base/road base for footpaths, medians, or any
other block paving shall include the following items in the item coverage: -
ii. The item for pre-cast concrete block paving shall include the following items
in the item coverage: -
PP/32
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
i. The item for granite paving blocks is measured in square metre (m2) and
shall include the following items in the item coverage: -
i. The item for speed tables is measured in number (nr) and shall include the
following items in the item coverage: -
a) Traffic Signs
i. The items for traffic signs shall include the following items in the item
coverage:
PP/33
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
b) Road Markings
i. The items for solid areas, lines, triangle, circles with enclosing arrows kerb
markings and letters numerals and all markings as per ADM Traffic Manual
shall have the following items to the item coverage:
i. The items for road and speed humps shall be measured in Number (nr) and
shall have the following items to the item coverage:
G Traffic Signals
a) Ductwork
ii. The type, sizes and diameters of ductwork and number of ways shall be
stated in the item descriptions.
iii. The items for ductwork and trench composite items shall include the
following in the item coverage:
PP/34
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
ii. Type of the manhole or chamber shall be stated in the item description.
iii. The items for manholes or chambers shall include the following items in the
item coverage;
PP/35
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
ii. The type and size of cable and number of ways laid in the trench shall be
described in the item descriptions.
iii. The items for cables and trench composite items shall include the following
items in the item coverage: -
i. The units of measurement for cables not in trench shall be in linear metre
(m).
ii. The items for cables shall include the following items in the item coverage: -
PP/36
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
i. The units of measurement for traffic signal controller shall be in number (nr).
iii. The items for traffic signal controller shall include the following items in the
item coverage: -
f) Traffic Signal Support, Cantilever Sign Support and Overhead Sign Gantry.
i. The units of measurement for traffic signal support, cantilever sign support and
overhead sign gantry shall be in number (nr).
ii. Measurement of traffic signal support, cantilever sign support and overhead sign
gantry shall be made for complete installation of the unit.
iii. The items for traffic signal support, cantilever sign support and overhead sign gantry
shall include the following items in the item coverage: -
PP/37
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
i. The units of measurement for signal heads, arrow mask and pedestrian push
buttons shall be in number (nr).
ii. Signal heads shall be classified according to the type and make of heads and
measured separately accordingly.
iii. Measurement of traffic signal support shall be made for complete installation of the
unit.
iv. The items for signal heads, arrow mask and pedestrian push buttons shall include
the following items in the item coverage:
h) Earthing System.
PP/38
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
ii. The items for earthing system shall include the following items in the item coverage:
i. The units of measurement for preformed detector loops shall be in number (nr).
ii. The measurement of loop detector shall be of the complete installation of the system
as shown on drawings and approved by the Engineer.
iii. The items for vehicle loop detector system shall include the following items in the
item coverage:
PP/39
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
i. The unit of measurement for electricity service cabinets shall be in number (nr).
ii. The measurement of electricity service cabinets shall be of the complete installation
of the system as shown on drawings and approved by the Engineer.
iii. The items for electricity service cabinet shall include the following items in the item
coverage: -
H Street Lighting
a) Ductwork
i. The unit of measurement for ductwork and trenches shall be in linear metre
(m). Where multiple ducts (ways) are laid in a common trench the different
duct multiples (ways) and shall be identified and measured as separate items.
ii. The type, sizes and diameters of ductwork and number of ways shall be stated
in the item descriptions.
iii. The items for ductwork shall include the following in the item coverage: -
PP/40
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
• supply and laying specified bedding for trench including in-situ concrete
unless measured elsewhere within the BOQ.
• laying duct(s) including jointing and cutting;
• supply and installation of draw rope;
• supply and installation of end stoppers where required;
• testing and cleaning;
• full compliance with Roads Department (Street Lighting Section)
Specifications and liaison.
iv. The items for trenches shall include the following in the item coverage: -
i. The unit of measurement for road crossing ducts shall be in linear metre (m). Where
multiple ducts (ways) are laid in a common trench the different duct multiples (ways)
and shall be identified and measured as separate items.
ii. The type, sizes and diameters of ductwork and number of ways shall be stated in
the item descriptions.
iv. The items for road crossing ducts shall include the following in the item coverage: -
PP/41
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
i. The units of measurement for street lighting columns, brackets and lamps shall
be in number (nr).
ii. Separate items shall be provided for street lighting columns and brackets for
the complete work in accordance with the following: -
iii. The items for street lighting columns, brackets and lamps shall include the
following items in the item coverage: -
• excavation of any material including rock, pavement, and footpaths;
prepare formation level and excavation sides;
• formwork and reinforcement;
• supply and place in-situ concrete, form ducts in bases and concrete
protection;
• supply and install threaded anchor bars to exact location;
• backfilling, compaction and reinstatement of surfaces;
• supply and install threaded anchor bars in exact position;
• conduits including all-purpose made screwed and threaded connections,
bends, tees and the like and draw wires;
• drilling or forming holes and pockets in structures or foundation, and
casting in bolts, sockets, base plates and anchorage assemblies;
• supply and install streetlight column and brackets including lantern/lamps,
rivets, nuts, bolts, shims, washers and the like, and protective treatment;
• bedding and grouting;
• electrical equipment for road lighting, wiring and making connections,
plugging cable entry slots, earthing, excluding network cabling;
• preparation and supply of data sheets marking and lettering, notices,
recording and preparation and supply of record drawings;
• disposal of surplus material;
• base covers to columns;
• installing to leave footpaths clear of obstructions;
• locks, keys, backboard;
• threading cable through ducts, sleeves, conduit and the like;
• complying with regulations, earthing and inspection;
• lightning protection for high mast columns;
• soil resistivity test for high mast columns.
PP/42
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
ii. The type and size of cable and number of ways laid in the trench shall be
described in the item descriptions.
iii. The items for cables and trench composite items shall include the following
items in the item coverage: -
ii. The measurement of street lighting feeder pillar shall be for the complete
installation.
iii. Separate items shall be provided for different types and sizes of feeder pillar.
PP/43
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
iv. The items for street lighting feeder pillar shall include the following items in
the item coverage:
a) Generally:
i. The rates for expansion joints are deemed to include the cost of associated
formwork to stop ends.
ii. The rate for the bar reinforcement deems to include for bends, laps, ties, and the
like.
iii. The rates for formwork for voids in bridge deck shall include for the formwork for
sides, bottom, top, vertical sides of internal diaphragms, pier diaphragms and
internal face of abutment diaphragms.
iv. Formwork to curved surfaces of retaining walls is not measured separately and is
deemed to be included in the relevant available pay item.
v. Suitable pay items have been included for measurement of formwork. Some of the
formwork surface may be in vertical curve as well. The tenderer is required to
include the additional costs, associated with any of the formwork surface being in
the vertical curve to the relevant available pay item.
vi. The formwork items, plane sloping and curved surfaces, of bridge deck formwork is
not measured separately and is deemed to be included in the BOQ item provided
as “curved and sloping soffit of bridge deck”.
PP/44
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
vii. The rate for bearings shall include the cost of all equipment, material test and labour
required for the complete installation of the bearings including any provision for
seating of jack for future replacement of bearings.
viii. The rate for prestressing tendons shall include the cost of the prestressing stands,
steel ducts, anchorage system, grouting vents, local zone reinforcement and all
other accessories necessary for the complete installation of the prestressing
tendons. The rate shall also include for all labour and tools required for the works.
ix. The payment for the number of jacking of prestressing tendons shall be deemed as
full compensation for the prestressing operation regardless to the actual post
tensioning force, or number of strands.
x. The rates for coating system to exposed concrete surfaces shall include for the cost
of painting the piers in two different colours.
xi. The rate for coating system to concrete surfaces shall include for all the preparatory
works prior to application of the coating system. The rate for coating system to the
surfaces inside the box girders shall also include for in-situ finishing of the top
surface of bottom slab concrete.
xii. The concrete rate shall include the obligation to verify the requirement for cover
using cover meter measurements as specified.
xiii. Any Regulation Layer that is not shown in the drawings but is required to cover any
irregularities is deemed to be included in the rate of wearing course.
i. The rates for bored cast-in-place shall include for boring in any material and all
necessary operations for working below the water table for the support of the bore.
Irrespective of the method of casting the commencing surface of the depth bored
shall be taken as the cut off level, expressly required. Any additional depth bored
shall be attributable to the Contractor’s working method and shall not be payable.
Also, the rate of depth bores shall be deemed to include the cost of formwork and
any other work associated with casting a part of the pile as freestanding column.
ii. The rates shall include for the use of temporary casings for the pile and the
oversized hole according to the approved method statement.
iii. The rates for boring shall, unless otherwise stated, include for disposal of water and
bentonite suspension as displaced by concrete.
iv. The commencing surface level to be agreed with Engineer on site for each location.
v. The rates for cutting off surplus length also includes disposal of material arising to
tip.
vi. The concreted length of pile shall be measured from the cut off level, expressly
required, to the toe level expressly required, along the axes.
vii. The rates for vertical pile load test for non-working piles shall include for the cost of
pile and all related works.
PP/45
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
i. The units of measurement for guardrails, fencing and metal crash barrier shall
be in linear metre (m).
iii. The measurement of guardrails, fencing and metal crash barriers shall be the
developed length along the centre line of the guardrails, fence or metal barrier.
The measurement of height of guardrails, fencing and metal barriers shall be
that shown on the Drawings or directed by the Engineer for the type of fence.
iv. Separate items shall be provided for different types and sizes of guardrails,
fence and metal barriers.
v. The items for guardrails, fencing and metal crash barriers shall include the
following items in the item coverage: -
i. The units of measurement for concrete crash barrier shall be in linear metre
(m).
ii. The measurement of concrete crash barriers shall be the developed length
along the centre line of the concrete barrier. The measurement of height of
concrete barriers shall be that shown on the Drawings or directed by the
Engineer for the type of fence.
PP/46
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
iii. Separate items shall be provided for different types and sizes of concrete
barriers.
iv. The items for concrete crash barriers shall include the following items in the
item coverage:
c) Rock-filled Gabions.
ii. Separate items shall be provided for different types and sizes of gabions.
iii. The items for rock-filled gabions shall include the following items in the item
coverage: -
PP/47
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
• filling with specified fill material including overfilling to allow for settlement;
• bracing wires and wiring lids after filling;
• special filling where specified to form fair faced finish;
• in the case of water courses, working in land dealing with the flow of water.
Class Y – Sewer, water main and other renovation and ancillary works
A Raising of the cover levels of existing manhole and chambers is measured by the number
(nr) of manholes/chambers and the builders work in connection with the work this item in
the unit of measurement as indicated in the BOQ.
B The rates for raising cover levels of existing manhole and chambers shall include for all
plant, materials and labour required, making good all finishes, reinstatement and all other
works required to raise the cover.
C Replacement of existing manhole/chamber covers and frames with new ones are to be
paid as an extra over raising or lowering of cover levels. Rates include all works for the
provision and installation of covers and frames on existing chambers.
D Lowering of the cover levels of existing manholes and chambers shall be measured by
the number (nr) of manholes/chambers and the builders work in connection with this item.
E Minor adjustment of cover levels of existing manholes and chambers shall be measured
by number (nr).
F The rates for minor adjustment of cover levels of existing manholes and chambers include
all plant, materials and labour required to adjust the cover levels by adjustment of the
depth of block or concrete bed beneath the cover and frame including breaking out and
disposal off site of existing works, concrete, block work, making good all finishes, and all
other works required to adjust the cover level.
G Abandonment of the existing manholes, septic tanks and soakaway chambers are
measured by the number (nr) of units and the builder work connection with the work this
item in the unit of measurement as indicated in the BOQ.
H The rates for abandonment shall include for all plant, materials and labour required,
making good all finishes, reinstatement and all other works required to complete the work.
a) Walls
PP/48
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
ii. The measurement of solid block walls and hollow concrete block walls shall
be the area completed, finished and approved by the Engineer.
iii. Separate items shall be provided for different types and thickness of walls.
iv. The items for walls shall include the following items in the item coverage: -
b) Mass Concrete
i. The units of measurement for mass concrete shall be in cubic metre (m3).
ii. The measurement of mass concrete shall be the volume completed, finished
and approved by the Engineer.
iii. Mass concrete shall be classified based on mixture type, strength and
structure elements.
iv. The items for mass concrete shall include the following items in the item
coverage: -
PP/49
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
c) Reinforcement
iii. All reinforcement shall be free from pitting due to corrosion, loose rust, mill
scale, paint, oil, grease or other material which may, in the Engineer’s opinion,
impair the bond between concrete and reinforcement or cause corrosion of
steel or disintegration of the concrete.
iv. The items for reinforcement shall include the following items in the item
coverage: -
d) Formwork
ii. The measurement of formwork shall be the area prepared, completed and
approved by the Engineer.
iii. Formwork shall be classified based on surface type, finish and structure
elements.
iv. The items for formwork shall include the following items in the item coverage:
PP/50
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
a) Excavation
i. The units of measurement for water main excavation shall be linear metre
(m);
ii. The measurement of the excavation for water mains shall be the linear
measurement along each individual length of water main;
iii. Separate items shall be provided for excavation for different Diameters of
water main pipe
iv. The items for excavation shall include the following items in the item coverage:
i. The units of measurement for water main bedding and surrounds shall be
linear metre (m);
ii. The measurement of the bedding and surrounds for water mains shall be the
linear measurement along each individual length of water main;
iii. Separate items shall be provided for bedding and surrounds for different
diameters of water main pipe
iv. The items for bedding and surrounds shall include the following items in the
item coverage:
PP/51
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
c) Backfilling
i. The units of measurement for water main backfilling shall be linear metre (m);
ii. The measurement of the backfilling for water mains shall be the linear
measurement along each individual length of water main;
iii. Separate items shall be provided for backfilling for different diameters of water
main pipe
iv. The items for backfilling shall include the following items in the item coverage:
d) Pipe Laying
i. The units of measurement for pipe laying in trench shall be Linear metre (m);
ii. The measurement for the pipe laying shall be the linear measurement along
each individual length of water main.
iv. The items for pipe laying shall include for the following items in the item
coverage:
i. The units of measurement for fittings and valves shall be Number (nr);
PP/52
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
ii. The measurement of fittings and valves shall be of the complete installation.
• fittings;
• valves;
• different type;
• different size
iv. The items for fittings and valves shall include for the following items in the item
coverage:
f) Corrosion Protection
ii. The units of measurement for corrosion protection to fittings & valves shall be
number (nr);
iii. The measurement of corrosion protection shall be for the complete application
of the protective system.
iv. The items for corrosion protection shall include for the following items in the
item coverage:
PP/53
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
i. The units of measurement for concrete protection slabs shall be linear metre
(m);
iii. Separate items shall be provided for concrete protection slab to different pipe
diameters;
iv. The items coverage for concrete protection slab shall include for the following
items in the item coverage:
iii. The items for removal of cancelled pipework shall include for the following
items in the item coverage:
PP/54
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
i. The units of measurement for the installation of marker posts shall be Number
(nr).
iv. The items for installation of marker posts shall, in accordance with the
Preambles to Bill of Quantities General Directions, include for:
• keeping the excavation free of water, upholding the sides until completion
of backfilling and protection of existing services;
• formwork;
• in-situ concrete;
• assembly of backing and face plates;
• backfill around foundation with suitable fill and compact;
• remove surplus material to approved tip off site;
• reinstate surfaces around marker post foundation as necessary.
i. The units of measurement for the adjustment to existing chamber covers shall
be Number (nr).
PP/55
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
iii. The items for adjustment of existing chamber covers shall include for the
following items in the item coverage:
i. The units of measurement for ducts for water services shall be linear metres
(m).
ii. The measurement of ducts for water services shall be along the centre line of
each type of duct and the summation of the measurement for each type of
duct:
iii. Separate items shall be provided for ducts for water services in accordance
with the following:
iv. The items coverage for ducts for water services shall include for the following
items in the item coverage:
PP/56
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
i. The units of measurement for relocation, removal of Existing Fire Hydrant shall
be numbers (nr).
ii. The units of measurement for supply and installation of New Fire Hydrant shall
be numbers (nr).
iii. The items for relocation, removal and replacement of Fire Hydrants shall be
deemed to include the following:
PP/57
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
ii. The measurement for the pipe realignment/relocation shall be the linear
measurement along each individual length of water main.
iii. For itemisation separate items shall be provided for each pipe type and
diameters.
iv. The items for realignment/relocation of live potable water network shall
include for the following items in the item coverage:
• Contractor to make due allowance of using new pipes and fittings during
realignment/relocation works in order to minimized disruption of existing
services;
• agree programme of pipe realignment/relocation with ADDC;
• trial pits to locate existing pipes and/or clashing services;
• excavation in any material including hand excavation;
• keeping earthworks free of water, upholding the sides until backfilling is
completed and protection of existing services;
• allowing access for realignment/relocation of pipes;
• attendance by ADDC during realignment/relocation of pipes as required;
• backfill with suitable material and compaction;
• removal of surplus material to an approved tip off site;
• reinstatement of existing surfaces where necessary;
• liaison with ADDC and compliance with ADDC Specification;
• lowering as directed;
• recording and staking of junctions and terminations;
• bedding, surrounds and tiles / tape;
• ducts and concrete protection as required;
• excavation and filling of any soft spots;
• testing, sterilising and commissioning of water mains.
i. The units of measurement for cable trench works shall be linear metres (m).
ii. The measurement of cable trench works shall in be along the centre line of
each cable trench between discrete points of cable termination:
iii. Itemisation of the separate items shall be provided for different types and sizes
of cable.
iv. The items for cable trench works shall include for the following items in the
item coverage:
PP/58
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
b) Distribution Cable
i. The Unit of measurement for distribution cable shall be linear metre (m):
ii. The measurement of distribution cable shall be the length of each cable along
its centre line.
iii. Itemisation shall be for separate items shall be provided for each type of cable
iv. The items for distribution cable shall include for the following items in the item
coverage:
PP/59
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
ii. The measurement of removal of existing cables shall be the length of cable
to be removed measured along its centre line.
iii. For itemisation the separate items shall be provided for each type if cable or
groups of cable to be removed.
iv. The items for removal of existing cables shall include for the following items
in the item coverage:
iii. For itemisation separate items shall be provided for each cable type.
iv. The items for realignment/relocation of live cables shall include for the
following items in the item coverage:
PP/60
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
i. The units of measurement for ducts for electrical services shall be Linear
metres (m).
ii. The measurement of ducts for electric service shall be along the centre line of
each type of duct and the summation of the measurement for each type of duct.
iii. Separate items shall be provided for each type of duct for electric services.
iv. The items for ducts for electrical services shall include for the following items in
the item coverage:
PP/61
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
ii. The measurement of removal of existing electrical pole shall be the removal of
the complete unit including the foundation.
iii. The items for removal of existing electrical pole shall include for the following
items for item coverage: -
ii. The measurement of removal of cancelled ducts shall be the length of duct
along its centreline.
iii. The items for removal of cancelled ducts shall include for the following items in
the item coverage
PP/62
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
• keeping the excavation free of water, upholding the sides till completion
of existing services;
• removal of cancelled ducts including concrete surrounds and disposal to
an approved tip off site;
• backfill with approved granular material, compaction and removal of
surplus material to an approved tip off site;
• reinstatement of existing surfaces where required;
• liaison with concerned third parties and compliance with their respective
specifications.
iii. The items for adjustment of existing chambers covers shall include for the
following items in the item coverage:
ii. The measurement of concrete protection slab shall be the summation of the
individual lengths of concrete protection slab measured along the centre line
of the concrete slab.
PP/63
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
iii. Separate items shall be provided for concrete protection slab for different
types of ducts.
iv. The items for concrete protection slab shall include for the following items in
the item coverage:
ii. The type, sizes and diameters of ductwork and number of ways shall be stated
in the item descriptions.
iii. Separate items shall be provided for each type and size of third-party ducting.
iv. The items for construction of third-party ducts shall include for the following
items in the item coverage:
• supply of ducts;
• trial pits to locate existing and/or clashing services;
• excavation in any material, including hand excavation and excavation
below the water table and keeping the excavation free of water;
PP/64
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
• supply and laying specified bedding for trench, including in-situ concrete;
• upholding the sides of excavation till completion of backfill and protection
of existing services;
• laying ducts including joints and cutting;
• surrounding ducts with dune sand as specified;
• concrete protection if required;
• steel reinforcement if required;
• installation of draw rope and stoppers;
• supply, deposition and compaction of approved backfill;
• removal of surplus material to an approved tip off site;
• testing and cleaning;
• supply and installation of approved duct markers;
• reinstatement of existing surface;
• liaison with concerned third parties and compliance with their respective
specifications.
i. The units of measurement manholes and joint boxes shall be Number (nr).
ii. Separate items shall be provided for manholes and joint boxes in accordance
with the following:
iii. The items for manholes and joint boxes shall include for the following items in
the item coverage:
PP/65
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
ii. The measurement of removal of existing telephone posts shall be the removal
of the complete unit including the foundation.
iii. The items for removal of existing telephone posts shall include for the following
items for item coverage:
iv. For itemisation separate items shall be provided for each duct type and size.
PP/66
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
A The Contractor shall be responsible for the design of Gas Network and appoint specialist
sub-contractor in accordance with Authority requirements.
B The description stated in the Bill of Quantities are for reference only, and it shall be the
Contractor's responsibility to design, provide all necessary calculation and shop
drawings, and to supply and install the Works in accordance with Authority
requirements.
C The quantity stated in the Bill of Quantities are indicative only and should be established
and verified by the Contractor and no re-measurement shall be done for Works to be
designed by the Contractor.
D The Contractor will be responsible for the design of all temporary works required for the
construction of the Works.
PROVISIONAL SUMS
A. Provisional sums are included as a separate bill and not under Bill 1 – General Items
Bill.
B. Provisional Sums may only be expended upon the instructions of the Engineer.
E The Provisional Sums given in the Bills of Quantities may be used in whole or in part, or
not at all, on the instruction of the Engineer.
F If the Employer decides not to use one or more of the Provisional Sums, the entire
Provisional Sums including the overheads and profits, attendance and builders works
will be deleted. No compensation will be due to the Contractor for such deletion.
G General and Specific Builders Work for provisional sums will be priced as lump sums
and will not be adjusted due to the difference in the value of the provisional sum
expended from the provisional sum stated in the Bills of Quantities.
SPECIAL ATTENDANCES
PP/67
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
i) Providing space for the Nominated Sub-Contractors for their own Site facilities
(offices, stores, etc.), scaffolding, power, water, hoisting, lifting, etc.
ii) Liaison and co-ordination with the Engineer, sub-Contractor, etc.
iii) Water and power will be provided to the nominated sub-Contractors for
installation, testing and commissioning. The points of drawing power and water
will be agreed with the sub- Contractors.
iv) Cranage for equipment and materials of the nominated Sub-Contractors (except
chillers).
v) Provision, installing, dismantling and removal of scaffolding (as required by the
nominated sub-Contractors). Tubular free-standing scaffolding to the elevator
Contractor’s requirement and working platform is also included.
vi) Use of general construction plant and temporary works.
vii) The clearing away of all rubbish, waste and debris on a regular basis from
collection points on each floor.
viii) The provision of electrical power for the nominated sub-Contractor’s works,
including all lighting and 3-phase or heavy supplies which may be required.
ix) The provision of all fuel necessary for the testing and commissioning of the Sub-
contract works.
x) The general coordination and integration of all the nominated subcontract works
into the general programme.
xi) The provision of all temporary access already fixed or placed in position on the
site for the use of workmen and the delivery of materials.
xiii) The programming of the nominated subcontract works and the necessary
coordination to comply with the Contractor’s overall programme.
xiv) Supplying full size setting out templates and giving and marking dimensions and
taking responsibility for their accuracy.
xv) Obtaining any necessary security passes, access approvals, identity cards and
the like for all nominated Sub-Contractor’s personnel.
A General Builders work in connection will include cutting, chasing, forming and closing
openings in walls, floors, beams, ceilings, bulkheads, access panels in false ceiling for
all works etc., and making good of the same and the like items. Boxouts and frames are
also included. Protective and decorative painting is to be included if not included
elsewhere. Provision for lifting, storage and scaffolding is to be included if not included
elsewhere. For kitchen cabinets, wardrobes, etc. it will include for concrete up stands,
steel supports, frames, brackets and the like. For lifts, sill projections/angle supports at
PP/68
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
A Specific Builders work in connection will include excavation, cutting, filling, providing
openings, making good the openings for ducts, sleeves, supports, bases, pads and
plinths for plant and equipment and the like items. Only vibrator isolators and metallic
frames for inertia bases are to be supplied by the M & E Sub Contractor.
B Specific Builders work for air-conditioning installation will also include frames and
openings in doors, walls or partitions for installation of grills, louvers, etc. and similar
items.
C Specific Builders work for electrical; fire alarm and fire detection installation will also
include for trenching (for cables) and related items.
D Specific Builders work for drainage, plumbing and firefighting installation will also include
for trenching, excavations, backfilling, manholes, septic tank, soakaways, beds,
surrounds, and the like items.
E Specific Builders work for conveyance system, window cleaning equipment and refuse
chute systems will also include for steelwork supports, guide rails and the like items.
G All civil works related with manholes, sumps, channels, concrete tanks, etc., including
benching, GRP (or other specified) lining, etc. Manholes covers and frames and channel
gratings and frames will be supplied by the M & E sub-Contractor.
J All civil works associated with ADDC substation including trenches and transformer
bases and all incoming / outgoing ducts and cable manholes.
A The cost of any work carried out under the Service Authority and Contingency items will
be assessed at rates given in the relevant Bills of Quantities or at such rates to be
determined by the Engineer.
A Should the Contractor wish to use alternative materials to those specified, e.g. to utilize
local stocks or suppliers instead of imports, he shall obtain the approval of the Engineer.
Any alternative materials shall not be of a lesser standard than those stipulated herein.
PP/69
Tender No. - A322201/2021/T/026
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and
Lagoons Arterial Road
PRICING PREAMBLES
PROVISIONAL QUANTITIES
A The Tenderer shall list any other items not included in the BOQ but included in the
specifications, scope of works, Employer's requirements and necessary for the complete
and satisfactory completion of the works. Should the Tenderer fail to insert any items in
the Tender Adjustments Schedule, it will be deemed that their price for the Works
includes for all items and associated items necessary to complete the Works and no
subsequent claim for any additional items will be entertained.
A The Contractor to include in their scope of works Operation and Maintenance of the
works after the issuance of Taking over Certificate as per relevant Authorities’ standards,
procedures and requirements and until the completion of the Defects Liability period.
C It is Contractor’s responsibility to secure all required resources for the Operation and
Maintenance activities.
PP/70
SECTION C - DAYWORK SCHEDULE
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Page No.
Saadiyat Infrastructure - Cultural District Remaining Daywork Schedule C C/1
Infrastructure and Lagoons Arterial Road
DAYWORK SCHEDULE
A Generally
Dayworks will be administered strictly in accordance with the Conditions of Contract. Dayworks shall only be used for minor or
incidental works and shall be executed based on Engineer Instruction.
Should the Engineer authorise the Contractor to undertake works on a dayworks basis during the course of the Contract while
other operations are in progress, the rates set down in this Schedule shall be used. Profit and overheads are to be included in
the item provided for same at the end of the Labour Material and Plant Sections of this Sections of this Schedule of Rates.
The daywork rates quoted for labour are to be the inclusive NETT amounts payable including for use and waste of hand tools
and of all ordinary non-mechanical plant, staging, scaffolding, tarpaulin, use of electric light and water for the Works, etc. and all
special inducements for working in Abu Dhabi. The rates shall also be deemed to include the extra cost of public holidays other
holidays with pay, medical costs, bonus, sick leave, termination indemnity pay and the like. Unless specifically authorized in
writing by the Employer, non-productive overtime or special rates for overtime will not be admissible. The cost of all supervisory
staff including Employers Representatives, foremen, clerks, store men, etc., shall not be paid separately and is deemed to be
included in the percentage addition for profit and overheads.
Materials used on daywork shall be as specified for the Works. The rates are to include delivery to the Site. Should materials
be required for use on dayworks which are not included in the Schedule, the lowest current market prices shall apply, plus a
reasonable allowance for collecting, loading and off loading the transporting to the Works.
Plant hire rates shall included for the cost of maintaining in proper working order, attendance in starting up and shutting down,
refuelling and all fuel and power, oils grease and cleaning materials, replacement and / or sharpening of tools, provision of tools
and all other ancillary items including consumable spares. Idle time in maintenance or traveling to the Site will not be allowed.
Drivers and attendants shall be charged for at the rates as laid down for labour.
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Page No.
Saadiyat Infrastructure - Cultural District Remaining Daywork Schedule C C/2
Infrastructure and Lagoons Arterial Road
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Page No.
Saadiyat Infrastructure - Cultural District Remaining Daywork Schedule C C/3
Infrastructure and Lagoons Arterial Road
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Page No.
Saadiyat Infrastructure - Cultural District Remaining Daywork Schedule C C/4
Infrastructure and Lagoons Arterial Road
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Page No.
Saadiyat Infrastructure - Cultural District Remaining Daywork Schedule C C/5
Infrastructure and Lagoons Arterial Road
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Page No.
Saadiyat Infrastructure - Cultural District Remaining Daywork Schedule C C/6
Infrastructure and Lagoons Arterial Road
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Page No.
Saadiyat Infrastructure - Cultural District Remaining Daywork Schedule C C/7
Infrastructure and Lagoons Arterial Road
BILLS OF QUANTITIES
SECTION D - WORK ITEMS
BILL NO: 01
PRELIMINARIES & GENERAL ITEMS
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure Preliminaries & General D 1
and Lagoons Arterial Road - Package 2 Items D/1/1
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Temporary Works
Temporary Traffic management as necessary for
P A272.1 sum 1
execution of Works
Temporary Traffic diversions / management as necessary
Q A272.2 sum 1
for execution of Works
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Preliminaries & D 1
Infrastructure and Lagoons Arterial Road - Package 2 General Items
D/1/4
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Preliminaries & D 1
Infrastructure and Lagoons Arterial Road - Package 2 General Items
D/1/5
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Preliminaries & D 1
Infrastructure and Lagoons Arterial Road - Package 2 General Items
D/1/6
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Preliminaries & D 1
Infrastructure and Lagoons Arterial Road - Package 2 General Items
D/1/7
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Preliminaries & D 1
Infrastructure and Lagoons Arterial Road - Package 2 General Items
D/1/8
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Preliminaries & D 1
Infrastructure and Lagoons Arterial Road - Package 2 General Items
D/1/9
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Preliminaries & D 1
Infrastructure and Lagoons Arterial Road - Package 2 General Items
D/1/10
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/1/1
Page D/1/2
Page D/1/3
Page D/1/4
Page D/1/5
Page D/1/6
Page D/1/7
Page D/1/8
Page D/1/9
BILLS OF QUANTITIES
BILL NO. 2 - GROVE TUNNEL ACCESS
SAADIYAT CULTURAL DISTRICT AND LAGOONS ARTERIAL ROADS REMAINING INFRASTRUCTURE WORKS - PACKAGE 2
SAADIYAT ISLAND, ABU DHABI, UAE
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Demolition & Site D 2.1
D/2.1/2
Infrastructure and Lagoons Arterial Road Clearance
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Demolition & Site D 2.1
D/2.1/3
Infrastructure and Lagoons Arterial Road Clearance
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/2.1/1
Page D/2.1/2
BILLS OF QUANTITIES
BILL NO: 2.2
GROUND INVESTIGATION
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Ground Investigation D 2.2
D/2.2/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Ground Investigation D 2.2
D/2.2/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Ground Investigation D 2.2
D/2.2/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/2.2/1
Page D/2.2/2
TOTAL FOR BILL NO. 2.2 - GROUND INVESTIGATION CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.3
EARTHWORKS
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Earthworks D 2.3
D/2.3/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Filling
General backfill / imported fill to excavated area,
typical maximum pay limits roadway excavation
including trimming and compaction
B Filling of selected suitable excavated material E634 m3 1,426
Disposal
Disposal of excavated material to ADM approved tip
F E532 m3 2,734
or Aldar specified location
Excavation ancillaries
Preparation of excavated surface to receive
G E522 m2 9,529
permanent works
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Earthworks D 2.3
D/2.3/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Tenderer's Adjustments
The Tenderer shall list any other items not included
in the BOQ but included in the specifications, scope
of works, Employer's requirements and necessary for
the complete and satisfactory completion of the
works. Should the Tenderer fail to insert any items in
the Tender Adjustments Schedule, it will be deemed
that their price for the Works includes for all items
and associated items necessary to complete the
Works and no subsequent claim for any additional
items will be entertained
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Earthworks D 2.3
D/2.3/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/2.3/1
Page D/2.3/2
BILLS OF QUANTITIES
BILL NO: 2.4
ROAD WORKS
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 2.4
D/2.4/1
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Bituminous spray
F Prime coat R351.1 m2 7,168
G Tack coat R351.2 m2 7,168
Ancillaries
Traffic signs
Supply and install traffic signs including panel,
plated, post, earthworks, foundation, fittings and
other related works as per Drawings and
Specifications
M Stop sign, type 301 R81*.1 nr 10
N One way sign, type 307 R81*.2 nr 2
P Pass either side sign, type 326 R81*.3 nr 4
Q Keep right sign, type 327 R81*.4 nr 1
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 2.4
D/2.4/3
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Directional signs
Supply and install directional signs including all
G necessary fittings and other related works as per
Drawings and Specifications
Ground mounted sign at Avenue posted speed
H R81*.14 nr 2
60kph, type Sign panel 01
Ground mounted sign at Avenue posted speed
J R81*.15 nr 1
60kph, type Sign panel 02
Ground mounted sign at Tunnel posted speed 40kph,
K R81*.16 nr 1
type Sign panel 03
Ground mounted sign at Tunnel posted speed 40kph,
L R81*.17 nr 1
type Sign panel 04
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 2.4
D/2.4/4
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Continuous lines
Thermo-plastic paint (white and yellow) complete as
per Drawings and Specifications
F Stop line marking, type 601 R822.1 m 76
G Channelizing line marking, type 612 R822.2 m 85
H Edge line marking, type 613 R822.3 m 874
Intermittent lines
Thermo-plastic paint (white and yellow) complete as
per Drawings and Specifications
J Give way line marking, ref. 602 R825.1 m 16
K Lane line marking, ref. 654 R825.2 m 429
L Guide line marking, ref. 680 R825.3 m 319
M Continuity line marking, ref. 681 R825.4 m 110
N Pedestrian crossing marking, 6900x4000mm, ref. 603 nr 2
P Pedestrian crossing marking, 8800x4490mm, ref. 603 R825.5 nr 1
Q Pedestrian crossing marking, 10800x4490mm, ref. 603 R825.6 nr 1
R Hatch marking, size 200m2, ref. 658 R825.7 nr 1
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 2.4
D/2.4/5
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
CLASS V: PAINTING
Chlorinated rubber based quick drying paint applied
in two coats to exposed faces of concrete kerbs and
road separator; colour as per specification and as
directed by the Engineer
F Painting on upstand kerbs V939 m2 512
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 2.4
D/2.4/6
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Fences
Gates
Rumble Strip
Site furniture
F Bollards X900.3 nr 8
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 2.4
D/2.4/8
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL SUMMARY
Page D/2.4/1
Page D/2.4/2
Page D/2.4/3
Page D/2.4/4
Page D/2.4/5
Page D/2.4/6
Page D/2.4/7
TOTAL FOR BILL NO. 2.4 - ROAD WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.5
STREETLIGHTING NETWORK
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Streetlighting D 2.5
D/2.5/1
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Earth Pit
In-situ reinforced concrete earth pit construction
complete with excavation in any type of soil,
backfilling, dispose of surplus material an approved
location within site including haulage, dewatering,
concreting, reinforcement, waterproofing, cover and
frame etc. complete all in accordance with the
Drawings and Specifications
C Earth pit various sizes; depth not exceeding 1.5m K231.2 nr 1
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Streetlighting D 2.5
D/2.5/2
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure Streetlighting Network D 2.5
and Lagoons Arterial Road D/2.5/3
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Connections
Allow for all necessary tie-in connection to other street
lighting networks; complete including co-ordination and
liaison with Local Authorities
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Streetlighting D 2.5
D/2.5/5
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/2.5/1
Page D/2.5/2
Page D/2.5/3
Page D/2.5/4
TOTAL FOR BILL NO. 2.5 - STREETLIGHTING NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.6
STORMWATER WORKS
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 2.6
D/2.6/1
Infrastructure and Lagoons Arterial Road
CESMM3 UNIT QUANTITY UNIT RATE AMOUNT (AED)
ITEM REF ITEM DESCRIPTION
REF.
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 2.6
D/2.6/2
Infrastructure and Lagoons Arterial Road
CESMM3 UNIT QUANTITY UNIT RATE AMOUNT (AED)
ITEM REF ITEM DESCRIPTION
REF.
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure Stormwater Works D 2.6
and Lagoons Arterial Road D/2.6/3
CESMM3 UNIT QUANTITY UNIT RATE AMOUNT (AED)
ITEM REF ITEM DESCRIPTION
REF.
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 2.6
D/2.6/5
Infrastructure and Lagoons Arterial Road
CESMM3 UNIT QUANTITY UNIT RATE AMOUNT (AED)
ITEM REF ITEM DESCRIPTION
REF.
BILL SUMMARY
Page D/2.6/1
Page D/2.6/2
Page D/2.6/3
Page D/2.6/4
TOTAL FOR BILL NO. 2.6 - STORMWATER WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.7
POTABLE WATER WORKS
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and Potable Water Works D 2.7
Lagoons Arterial Road D/2.7/1
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Potable Water Works D 2.7
Infrastructure and Lagoons Arterial Road D/2.7/4
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/2.7/1
Page D/2.7/2
Page D/2.7/3
TOTAL FOR BILL NO. 2.7 - POTABLE WATER WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.8
SEWERAGE WORKS
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Sewerage Works D 2.8
D/2.8/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Sewerage Works D 2.8
D/2.8/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL NO. 2.8 - SEWERAGE WORKS (CONT'D)
CLASS K: Pipework - Manholes and Pipework
Ancillaries
Supply, construct and connect GRP structure
manhole, including anti-floatation manhole base unit,
complete with 75mm thk blinding, 50mm thk dry
mortar screed, 10mm GRP base plate, C40 concrete
fill, C40 RC cover slab, GRP sealing plate, benching,
lining, coating, external protection, wrapping, all as
specified and shown on drawings or as instructed by
the Engineer, allow for extra excavation in any type
of soil/rock, dewatering, backfill, labour, plant,
material required and all incidental works All items in
accordance with the contract drawings and project
specifications
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Sewerage Works D 2.8
D/2.8/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Sewerage Works D 2.8
D/2.8/4
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Sewerage Works D 2.8
D/2.8/5
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/2.8/1
Page D/2.8/2
Page D/2.8/3
Page D/2.8/4
TOTAL FOR BILL NO. 2.8 - SEWERAGE WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.9
POWER NETWORK
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Power Network D 2.9
D/2.9/1
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL NO. 2.9 - POWER NETWORK
Note: All works are to be carried out in accordance
with ADDC/ADWEA Standards and Specifications
CLASS E: Earth Works
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure Power Network D 2.9
and Lagoons Arterial Road D/2.9/2
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Supply and lay warning tape appropriate width and thick for
D X900.4 m 622
cables in the trenches
Cables
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Power Network D 2.9
D/2.9/4
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL SUMMARY
Page D/2.9/1
Page D/2.9/2
Page D/2.9/3
TOTAL FOR BILL NO. 2.9 - POWER NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.10
TELECOMMUNICATION NETWORK
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Telecommunication D 2.10
D/2.10/1
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Telecommunication D 2.10
D/2.10/2
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Telecommunication D 2.10
D/2.10/3
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Telecommunication D 2.10
D/2.10/4
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/2.10/1
Page D/2.10/2
Page D/2.10/3
TOTAL FOR BILL NO. 2.10 - TELECOMMUNICATION NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.11
IRRIGATION NETWORK
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Irrigation Network D 2.11
D/2.11/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL NO. 2.11 - IRRIGATION NETWORK
Note: All works are to be carried out in accordance
with ADDC/ADM Standards and Specifications
CLASS I: Pipe Work - Pipes
Supply and install HDPE recycle water line in
trenches including excavation in any type of soil,
upholding sides of excavation, disposal of excess
excavated materials to an approved location
including haulage, dewatering, backfilling with
suitable approved fill material, including covering
including finishes, jointing, detectable warning tapes
testing and commissioning. (beds & surrounds
measured separately) as per Drawings and
Specifications
HDPE pipes; outer diameter 110 mm
A Depth not exceeding 1.5 m; I712 m 552
CLASS J: Pipework - Fittings and Valves
Supply and fix fittings and valves complete with
fixtures and all other necessary accessories as per
Drawings and Specifications
Endcap
B 110 mm dia J621 nr 1
Gate Valve
C 110 mm dia J811 nr 2
Flow Meter
D 110 mm dia J891 nr 1
CLASS K: Pipework - Manholes and Pipework
Ancillaries
Road Crossing Ducts
Road Crossing Ducts with uPVC (class 10), including
excavation, backfilling, disposal of excavated
material to approved tip, reinforced concrete
encasement, duct markers, warning tapes, end caps,
etc.
E Road crossing duct K592.1 m 82
F Road crossing duct (spare) K592.2 m 18
Valve Chambers/Assembly
Construct reinforced concrete chambers with precast
cover slab for valves, including waterproofing, water
stop at construction joints, installation of hot dipped
galvanized lifting hooks in cover slab, supports for
valve spindle extension; casting in of anchor flange,
sealing flange (water stop), access cover frame,
surface box, chamber indication plates, owner
information plate, ventilation pipes, bolting of
aluminium ladder, excavation, dewatering, backfilling
etc., all as per the Specification and as shown on
Drawings, Specifications and as directed and
authorized by the Engineer (valves measured
separately)
G Gate valve chamber K232 nr 2
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Irrigation Network D 2.11
D/2.11/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Irrigation Network D 2.11
D/2.11/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Tenderer's Adjustments
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Irrigation Network D 2.11
D/2.11/4
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/2.11/1
Page D/2.11/2
Page D/2.11/3
TOTAL FOR BILL NO. 2.11 - IRRIGATION NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.12
GAS NETWORK
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Gas Network D 2.12
D/2.12/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Gas Network D 2.12
D/2.12/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Tenderer's Adjustments
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Gas Network D 2.12
D/2.12/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/2.12/1
Page D/2.12/2
TOTAL FOR BILL NO. 2.12 - GAS NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.13
MCC NETWORKS
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure MCC Network D 2.13
and Lagoons Arterial Road D/2.13/1
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
A 7-way x 75mm dia concrete encased PVC duct bank K592 m 115
Poles
Earth Pit
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining MCC Network D 2.13
D/2.13/3
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining MCC Network D 2.13
D/2.13/4
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL SUMMARY
Page D/2.13/1
Page D/2.13/2
Page D/2.13/3
TOTAL FOR BILL NO. 2.13 - MCC NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.14
DISTRICT COOLING WORKS
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining District Colling D 2.14
D/2.14/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining District Colling D 2.14
D/2.14/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining District Colling D 2.14
D/2.14/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Connections
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining District Colling D 2.14
D/2.14/4
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining District Colling D 2.14
D/2.14/5
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/2.14/1
Page D/2.14/2
Page D/2.14/3
Page D/2.14/4
TOTAL FOR BILL NO. 2.14 - DISTRICT COOLING WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.15
TRAFFIC SIGNAL NETWORKS
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Traffic Signal D 2.15
D/2.15/1
Infrastructure and Lagoons Arterial Road Networks
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
BILL NO. 2.15 - TRAFFIC SIGNAL NETWORKS
Note: All works are to be carried out in accordance
with ADM Standards and Specifications
Tenderer's Adjustments
The Tenderer shall list any other items not included
in the BOQ but included in the specifications, scope
of works, Employer's requirements and necessary for
the complete and satisfactory completion of the
works. Should the Tenderer fail to insert any items in
the Tender Adjustments Schedule, it will be deemed
that their price for the Works includes for all items
and associated items necessary to complete the
Works and no subsequent claim for any additional
items will be entertained
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Traffic Signal D 2.15
D/2.15/5
Infrastructure and Lagoons Arterial Road Networks
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
BILL SUMMARY
Page D/2.15/1
Page D/2.15/2
Page D/2.15/3
Page D/2.15/4
TOTAL FOR BILL NO. 2.15 - TRAFFIC SIGNAL NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.16
TUNNEL WORKS
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Tunnel Works D 2.16
D/2.16/1
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
CLASS E: EARTHWORKS
Excavation
Disposal
Excavation ancillaries
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Tunnel Works D 2.16
D/2.16/2
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Formwork
M Rough finish plane vertical G149 m2 3,193
N Rough finish plane sloping G129 m2 88
P Fair finish plane vertical G249 m2 2,363
Q Fair finish plane horizontal G219 m2 2,321
R Fair finish plane sloping G229 m2 197
Reinforcement
Supply and fix deformed high yield steel bar
S G52* t 1,426
reinforcement to BS 4449 - all diameters
Sundries
Approach slab interface, including joint sealant and
T G670 m 146
dowel bars
V Road tunnel and ramp construction joint; various width G6*.2 m 793
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Tunnel Works D 2.16
D/2.16/3
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Bituminous spray
D Tack coat R351 m2 3,956
Ancillaries
Connection to existing roads
G Tie-ins R900 m 15
CLASS V: PAINTING
Protective layers
Waterstop
Fences
Tenderer's Adjustments
The Tenderer shall list any other items not included
in the BOQ but included in the specifications, scope
of works, Employer's requirements and necessary for
the complete and satisfactory completion of the
works. Should the Tenderer fail to insert any items in
the Tender Adjustments Schedule, it will be deemed
that their price for the Works includes for all items
and associated items necessary to complete the
Works and no subsequent claim for any additional
items will be entertained
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Tunnel Works D 2.16
D/2.16/6
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL SUMMARY
Page D/2.16/1
Page D/2.16/2
Page D/2.16/3
Page D/2.16/4
Page D/2.16/5
TOTAL FOR BILL NO. 2.16 - TUNNEL WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 2.17
STORM WATER PUMPING STATION AND MCC+DC
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/1
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
CLASS E: EARTHWORKS
To pumping station
A Depth of 0.25 m - 0.50 m E212 m3 6
To MCC building
E Depth of 5.00 m - 10.00 m E216 m3 1,425
Filling
To structures
Filling ancillaries
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/2
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Vertical surfaces
C To pumping station E999.3 m2 390
Dewatering
Allow for dewatering works; including all necessary
E E999.3 item 1
ancillaries; all in accordance with the Specifications
Shoring
Provision of concrete
To pumping station
G Concrete Grade C25/20 F259.1 m3 11
Placing of concrete
Blinding; Grade C25/20 (SRC); all in accordance
with the Drawings and Specifications
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/3
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL NO. 2.17 - Storm Water Pumping Station,
MCC and DG Building (CONT'D)
To pumping station
A Cross-sectional area; not exceeding 0.03 m2 F581 m3 1
To MCC building
D Cross-sectional area; exceeding 1 m2 F585 m3 25
To MCC building
E Thickness not exceeding 150-300 mm F582 m3 1
To pumping station
To MCC building
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/4
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL NO. 2.17 - Storm Water Pumping Station,
MCC and DG Building (CONT'D)
Plane Vertical
To pumping station
A Width; exceeding 1.22 m G145.1 m2 265
To MCC building
B Width; 0.4 - 1.22 m G144 m2 7
Plane Horizontal
To pumping station
D Width; exceeding 1.22 m G215.1 m2 14
To MCC building
E Width; exceeding 1.22 m G215.2 m2 57
Plane Vertical
To pumping station
F Width; 0.2 - 0.4 m G243.1 m2 8
To MCC building
J Width; 0.2 - 0.4 m G243.2 m2 7
Reinforcement
Joints
Concrete accessories
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/5
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
External Works
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/6
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
External Works
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/7
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
CLASS V: PAINTING
To MCC building
E To floors V731.2 m2 57
To MCC building
F To concrete walls V733.2 m2 195
H To ceilings V734.2 m2 57
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/8
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Damp-proofing
G To ceilings W249.3 m2 14
Protective Layers
Protection screed
To pumping station
Upper surfaces inclined at an angle not exceeding
H degrees to the horizontal W 441.1 m2 31
To MCC building
Upper surfaces inclined at an angle not exceeding
J degrees to the horizontal W 441.2 m2 199
Protection board
To pumping station
Surfaces inclined at an angle exceeding 60
K degrees to the horizontal W 463.1 m2 265
To MCC building
Surfaces inclined at an angle exceeding 60
L degrees to the horizontal W 463.2 m2 199
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/9
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
To MCC building
C Double leaf swing door; 2600 x 2500 mm high Z393 nr 1
To MCC building
D Single leaf; 1500 x 2500 mm high (overall) Z323 nr 2
To MCC building
E 1600 x 2200 mm high (overall) Z325.1 nr 1
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/10
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
To pumping station
A 600 x 600 mm wide (clear opening) Z329.1 nr 1
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/11
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/12
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/13
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Isolators
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/14
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
To Collection
.
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/15
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/16
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/17
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Tenderer's Adjustments
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining SW PS, MCC and DG D 2.17
D/2.17/18
Infrastructure and Lagoons Arterial Road Building
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL SUMMARY
Page D/2.17/1
Page D/2.17/2
Page D/2.17/3
Page D/2.17/4
Page D/2.17/5
Page D/2.17/6
Page D/2.17/7
Page D/2.17/8
Page D/2.17/9
Page D/2.17/10
Page D/2.17/11
Page D/2.17/12
Page D/2.17/13
Page D/2.17/14
Page D/2.17/15
Page D/2.17/16
Page D/2.17/17
TOTAL FOR BILL NO. 2.17 - STW PS and MCC NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO. 3 - GROVE EXTERNAL INFRASTRUCTURE
SAADIYAT CULTURAL DISTRICT AND LAGOONS ARTERIAL ROAD REMAINING INFRASTRUCTURE WORKS - PACKAGE 2
SAADIYAT ISLAND, ABU DHABI, UAE
Tender No. A322201/2021/T/026
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Demolition & Site D 3.1
D/5.1/2
Infrastructure and Lagoons Arterial Road Clearance
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Demolition & Site D 3.1
D/5.1/3
Infrastructure and Lagoons Arterial Road Clearance
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
BILL SUMMARY
Page D/3.1/1
Page D/3.1/2
TOTAL FOR BILL NO. 3.1 - DEMOLITION & SITE CLEARANCE CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.2
ROAD WORKS
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 3.2
D/3.2/1
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
Pavement Type 1
Sub-bases, flexible road bases and surfacing, roadwork
etc. all in accordance with Road Geometry Layout plan,
Drawings and Specifications
C 200mm thick granular sub base (min. CBR 60%) R195.1 m2 2,266
D 150mm thick aggregate base course (min. CBR 80%) R195.2 m2 2,266
Asphalt binder course and base course
E 100mm thick asphalt base course R312.1 m2 2,266
F 60mm thick asphalt binder course R312.2 m2 2,266
Bituminous spray
H Prime coat R351.1 m2 2,266
J Tack coat R351.2 m2 2,266
Ancillaries
Traffic signs
E Speed hump & give way to pedestrian sign, type 435(750) R81*.5 nr 12
G Provision of post only for proposed future bus stop sign R81*.7 nr 6
Surface markings
Supply and apply surface markings including all
necessary accessories and other related works as per
Drawings and Specifications
Letters and shapes
H Straight arrow, type 614 R823.1 nr 14
J Right turn arrow, type 615 R823.2 nr 11
K Left turn arrow, type 616 R823.3 nr 8
L Straight/right arrow, type 617 R823.4 nr 1
M Straight/left arrow, type 618 R823.5 nr 1
Continuous lines
Thermo-plastic paint (white and yellow) complete as per
Drawings and Specifications
N Stop line marking, type 601 R824.1 m 86
P Channelizing line marking, type 611 R824.2 m 778
Intermittent lines
Thermo-plastic paint (white and yellow) complete as per
Drawings and Specifications
Q Give way line marking, ref. 602 R825.1 m 49
R Road dividing line marking, ref. 652 R825.2 m 213
S Road continuity line, ref. 681 R825.3 m 260
T Pedestrian crossing marking, 3000x6500mm, ref. 603 R825.4 nr 1
U Pedestrian crossing marking, 3000x9500mm, ref. 603 R825.5 nr 1
V Pedestrian crossing marking, 3500x4000mm, ref. 603 R825.6 nr 3
W Pedestrian crossing marking, 3800x3500mm, ref. 603 R825.7 nr 6
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 3.2
D/3.2/3
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
Ancillaries
Raised pedestrian crossing
Raised pedestrian crossing including vehicular pavers,
sand bed, levelling course, tactile paving, yellow solid
triangle pavement marking, pedestrian bollards &
imprinted header course with all complete as per
Drawings and Specifications
Bus stop
Bus stop marking with optional red asphalt wearing
course or resin-bound aggregates surfacing (red) and
100mm wide yellow thermoplastic dashed line with all
complete as per Drawings and Specification (asphalt
pavement measured separately)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 3.2
D/3.2/4
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
CLASS V: PAINTING
Chlorinated rubber based quick drying paint applied in
two coats to exposed faces of concrete kerbs and road
separator; colour as per specification and as directed by
the Engineer
Tenderer's Adjustments
The Tenderer shall list any other items not included in the
BOQ but included in the specifications, scope of works,
Employer's requirements and necessary for the complete
and satisfactory completion of the works. Should the
Tenderer fail to insert any items in the Tender
Adjustments Schedule, it will be deemed that their price
for the Works includes for all items and associated items
necessary to complete the Works and no subsequent
claim for any additional items will be entertained
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 3.2
D/3.2/6
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
BILL SUMMARY
Page D/3.2/1
Page D/3.2/2
Page D/3.2/3
Page D/3.2/4
Page D/3.2/5
TOTAL FOR BILL NO. 3.2 - ROAD WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.3
STREETLIGHTING NETWORK
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Streetlighting Network D 3.3
D/3.3/1
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 AMOUNT
UNIT QUANTITY UNIT RATE
REF. (AED)
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Streetlighting D 3.3 D/3.3/3
Infrastructure and Lagoons Arterial Road Network
ITEM REF ITEM DESCRIPTION CESMM3 AMOUNT
UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/3.3/1
Page D/3.3/2
TOTAL FOR BILL NO. 3.3 - STREETLIGHTING NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.4
STORMWATER WORKS
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 3.4 D/3.4/1
Infrastructure and Lagoons Arterial Road
CESMM3 UNIT QUANTITY UNIT RATE AMOUNT (AED)
ITEM REF ITEM DESCRIPTION
REF.
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 3.4 D/3.4/2
Infrastructure and Lagoons Arterial Road
CESMM3 UNIT QUANTITY UNIT RATE AMOUNT (AED)
ITEM REF ITEM DESCRIPTION
REF.
End cap
J 300mm diameter J 593.1 nr 3
K 400mm diameter J 593.2 nr 5
L 500mm diameter J 593.3 nr 1
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 3.4 D/3.4/3
Infrastructure and Lagoons Arterial Road
CESMM3 UNIT QUANTITY UNIT RATE AMOUNT (AED)
ITEM REF ITEM DESCRIPTION
REF.
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 3.4 D/3.4/4
Infrastructure and Lagoons Arterial Road
CESMM3 UNIT QUANTITY UNIT RATE AMOUNT (AED)
ITEM REF ITEM DESCRIPTION
REF.
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 3.4 D/3.4/5
Infrastructure and Lagoons Arterial Road
CESMM3 UNIT QUANTITY UNIT RATE AMOUNT (AED)
ITEM REF ITEM DESCRIPTION
REF.
BILL SUMMARY
Page D/3.4/1
Page D/3.4/2
Page D/3.4/3
Page D/3.4/4
TOTAL FOR BILL NO. 3.4 - STORMWATER WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.5
POTABLE WATER WORKS
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Potable Water Works D 3.5 D/3.5/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
TEE's
C OD 110mm x110mmx110mm dia. equal TEE J612.1 nr 1
D OD 225mm x110mmx225mm dia. un-equal TEE J612.2 nr 2
E OD 315mm x110mmx315mm dia. un-equal TEE J612.3 nr 3
F OD 315mm x160mmx315mm dia. un-equal TEE J612.4 nr 1
End cap
G End cap, 110mm dia J612.5 nr 6
H End cap, 160mm dia J612.6 nr 1
Stop valve
Supply the following ISO standard stop valves including
PVC protection tube, valve spindle extension,
electrofusion tapping vale, all accessories as per the
Specification:
J 110 mm diameter J811.1 nr 4
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Potable Water Works D 3.5 D/3.5/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Potable Water Works D 3.5 D/3.5/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Potable Water Works D 3.5 D/3.5/4
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Potable Water Works D 3.5 D/3.5/5
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/3.5/1
Page D/3.5/2
Page D/3.5/3
Page D/3.5/4
TOTAL FOR BILL NO. 3.5 - POTABLE WATER WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.6
SEWERAGE WORKS
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Sewerage Works D 3.6 D/3.6/1
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Sewerage Works D 3.6 D/3.6/2
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Sewerage Works D 3.6 D/3.6/3
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Sewerage Works D 3.6 D/3.6/4
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Sewerage Works D 3.6 D/3.6/5
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
BILL SUMMARY
Page D/3.6/1
Page D/3.6/2
Page D/3.6/3
Page D/3.6/4
TOTAL FOR BILL NO. 3.6 - SEWERAGE WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.7
POWER NETWORK
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Power Network D 3.7 D/3.7/1
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL NO. 3.7 - POWER NETWORK
Note: All works are to be carried out in accordance
with ADDC/ADWEA Standards and Specifications
CLASS J: Pipework - Fittings and Valves
Supply and fix fittings and valves complete with
fixtures and all other necessary accessories as per
Drawings and Specifications
Concrete Protection
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Power Network D 3.7 D/3.7/2
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Power Network D 3.7 D/3.7/3
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Power Network D 3.7 D/3.7/4
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL SUMMARY
Page D/3.7/1
Page D/3.7/2
Page D/3.7/3
TOTAL FOR BILL NO. 3.7 - POWER NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.8
TELECOMMUNICATION NETWORK
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Telecommunication D 3.8 D/3.8/1
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Telecommunication D 3.8 D/3.8/2
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Telecommunication D 3.8 D/3.8/3
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/3.8/1
Page D/3.8/2
TOTAL FOR BILL NO. 3.8 - TELECOMMUNICATION NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.9
LANDSCAPE WORKS
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Landscape Works D 3.9 D/3.9/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Trees
A Azadirachta indica; ref. AZAind E860 nr 9
Ground cover
B Sesuvium portulacastrum; ref. SESpor E890.1 m2 256
Shrubs
C Atriplex halimus; ref. ATRhal E890.2 m2 52
D Clerodendrum inerme; ref. CLEine E890.3 m2 286
E Vitex Trifolia purpurea; ref. VITtri E890.4 m2 20
Sundries
F 80mm thick bark mulch E900.1 m2 358
G Timber stake; 50x50x2000mm E900.2 nr 18
H Root barrier system to trees E900.3 m2 124
J Salt barrier system to trees E900.4 m2 124
K 200mm thick gravel drainage layer to trees E900.5 m2 27
L Geotextile to ground cover and shrubs E900.6 m2 614
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Landscape Works D 3.9 D/3.9/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Paving
Precast concrete pavers; complete including
50mm thk sand beds, geotextile membrane
(where applicable), joints and cutting as per
Drawing and Specifications
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Landscape Works D 3.9 D/3.9/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Site Furniture
Supply and install site furniture including finishes,
foundation/bases, all fixings and accessories,
complete all in accordance with the Drawings and
Specifications
H Bench; ref. FU-01 X900.2 nr 1
J Litter bin; ref. FU-02 X900.3 nr 1
K Bollard; ref. FU-03 X900.4 nr 44
L Cycle studs; ref. SW-01 X900.5 nr 5
M Bike rack; ref. FU-04 X900.5 nr 3
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Landscape Works D 3.9 D/3.9/4
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Landscape Works D 3.9 D/3.9/5
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/3.9/1
Page D/3.9/2
Page D/3.9/3
Page D/3.9/4
TOTAL FOR BILL NO. 3.9 - LANDSCAPE WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.10
IRRIGATION NETWORK
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Irrigation Network D 3.10 D/3.10/1
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
BILL NO. 3.10 - IRRIGATION NETWORK
Note: All works are to be carried out in accordance
with ADDC/ADM Standards and Specifications
CLASS I: Pipe Work - Pipes
Supply and install HDPE pipes in trenches including
excavation in any type of soil, upholding sides of
excavation, disposal of excess excavated materials
to an approved location including haulage,
dewatering, backfilling with suitable approved fill
material, including covering including finishes,
jointing, detectable warning tapes testing and
commissioning. (beds & surrounds measured
separately) as per Drawings and Specifications
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Irrigation Network D 3.10 D/3.10/2
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Irrigation Network D 3.10 D/3.10/3
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Irrigation Network D 3.10 D/3.10/4
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
BILL SUMMARY
Page D/3.10/1
Page D/3.10/2
Page D/3.10/3
TOTAL FOR BILL NO. 3.10 - IRRIGATION NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.11
GAS NETWORK
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure Gas Network D 3.11 D/3.11/1
and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
End cap
C End cap, 63mm diameter J691.1 nr 1
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Gas Network D 3.11 D/3.11/3
Infrastructure and Lagoons Arterial Road
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
BILL SUMMARY
Page D/3.11/1
Page D/3.11/2
TOTAL FOR BILL NO. 3.11 - GAS NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.12
TRAFFIC SIGNAL NETWORKS
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Traffic Signal D 3.12
D/3.12/1
Infrastructure and Lagoons Arterial Road Networks
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
BILL NO. 3.12 - TRAFFIC SIGNAL NETWORKS
Tenderer's Adjustments
The Tenderer shall list any other items not included
in the BOQ but included in the specifications, scope
of works, Employer's requirements and necessary for
the complete and satisfactory completion of the
works. Should the Tenderer fail to insert any items in
the Tender Adjustments Schedule, it will be deemed
that their price for the Works includes for all items
and associated items necessary to complete the
Works and no subsequent claim for any additional
items will be entertained
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No.A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Traffic Signal D 3.12
D/3.12/5
Infrastructure and Lagoons Arterial Road Networks
ITEM REF ITEM DESCRIPTION CESMM3 UNIT QUANTITY UNIT RATE AMOUNT
REF. (AED)
BILL SUMMARY
Page D/3.12/1
Page D/3.12/2
Page D/3.12/3
Page D/3.12/4
TOTAL FOR BILL NO. 3.12 - TRAFFIC SIGNAL NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 3.13
MCC NETWORK
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining MCC Network D 3.13
D/3.13/1
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Concrete Protection
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining MCC Network D 3.13
D/3.13/2
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining MCC Network D 3.13
D/3.13/3
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining MCC Network D 3.13
D/3.13/4
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL SUMMARY
Page D/3.13/1
Page D/3.13/2
Page D/3.13/3
TOTAL FOR BILL NO. 3.13 - MCC NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO. 4 - GAD & HEADLAND AREA
SAADIYAT CULTURAL DISTRICT AND LAGOONS ARTERIAL ROAD REMAINING INFRASTRUCTURE WORKS - PACKAGE 2
SAADIYAT ISLAND, ABU DHABI, UAE
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Demolition & Site D 4.1 D/4.1/2
Infrastructure and Lagoons Arterial Road Clearance
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Demolition & Site D 4.1 D/4.1/3
Infrastructure and Lagoons Arterial Road Clearance
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/4.1/1
Page D/4.1/2
TOTAL FOR BILL NO. 4.1 - DEMOLITION & SITE CLEARANCE CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 4.2
GROUND INVESTIGATION
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Ground Investigation D 4.2 D/4.2/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Ground Investigation D 4.2 D/4.2/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Ground Investigation D 4.2 D/4.2/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/4.2/1
Page D/4.2/2
TOTAL FOR BILL NO. 4.2 - GROUND INVESTIGATION CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 4.3
EARTHWORKS
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Earthworks D 4.3 D/4.3/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
CLASS E: EARTHWORKS
Excavation
Excavation in cutting including trimming &
preparation, levelling, compacting bottom of
excavation to horizontal & sloped surfaces,
compacted backfill and all necessary temporary
supports as required in accordance with the
Drawings and Specifications
Filling
Disposal
Disposal of excavated material to ADM approved
D E532 m3 Rate only
tip or Aldar specified location
Excavation ancillaries
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Earthworks D 4.3 D/4.3/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Tenderer's Adjustments
The Tenderer shall list any other items not included
in the BOQ but included in the specifications, scope
of works, Employer's requirements and necessary
for the complete and satisfactory completion of the
works. Should the Tenderer fail to insert any items
in the Tender Adjustments Schedule, it will be
deemed that their price for the Works includes for
all items and associated items necessary to
complete the Works and no subsequent claim for
any additional items will be entertained
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Earthworks D 4.3 D/4.3/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/4.3/1
Page D/4.3/2
BILLS OF QUANTITIES
BILL NO: 4.4
ROAD WORKS
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 4.4 D/4.4/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL NO. 4.4 - ROAD WORKS
Note: All works are to be carried out in accordance
with ADM Standards and Specifications
CLASS R: ROADS & PAVINGS
Removal of existing roads and reinstatement where
required
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 4.4 D/4.4/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
A
200mm thick aggregate base course (min. CBR 80%) R195.3 m2 2,466
Ancillaries
Traffic signs
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 4.4 D/4.4/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Continuous lines
Thermo-plastic paint (white) complete as per
Drawings and Specifications
Ancillaries
Intermittent lines
Thermo-plastic paint (white) complete as per
Drawings and Specifications
E Give way line marking, ref. 602 R825.1 m 33
F Parking envelope line marking, type 620 R825.1 m 190
G Dividing line marking, type 652 R825.1 m 167
H Hatch marking, size 8m2, type 658 R825.2 nr 1
J Hatch marking, size 17m2, type 658 R825.2 nr 1
K Hatch marking, size 18m2, type 658 R825.2 nr 1
L Hatch marking, size 19m2, type 658 R825.2 nr 1
M Hatch marking, size 20m2, type 658 R825.2 nr 1
N Hatch marking, size 22m2, type 658 R825.2 nr 1
P Hatch marking, size 41m2, type 658 R825.2 nr 1
Q Hatch marking, size 130m2, type 658 R825.2 nr 1
R Pedestrian crossing marking, 4500x4000mm, ref. 603 R825.3 nr 1
S Pedestrian crossing marking, 5500x4000mm, ref. 603 R825.3 nr 1
T Pedestrian crossing marking, 7500x4000mm, ref. 603 R825.3 nr 1
U Pedestrian crossing marking, 9000x4000mm, ref. 603 R825.3 nr 1
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 4.4 D/4.4/4
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Ancillaries
Bus stop marking with optional red asphalt wearing
course or resin-bound aggregates surfacing (red)
and 100mm wide yellow thermoplastic dashed line
with all complete as per Drawings and Specification
D Bus stop marking; 117m2 R823.1 nr 1
Connection to existing roads
E Tie-ins R900 m 170
CLASS V: PAINTING
Chlorinated rubber based quick drying paint applied
in two coats to exposed faces of concrete kerbs and
road separator; colour as per specification and as
directed by the Engineer
F Painting on upstand and mountable kerbs V939 m2 219
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 4.4 D/4.4/5
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Tenderer's Adjustments
The Tenderer shall list any other items not included
in the BOQ but included in the specifications, scope
of works, Employer's requirements and necessary for
the complete and satisfactory completion of the
works. Should the Tenderer fail to insert any items in
the Tender Adjustments Schedule, it will be deemed
that their price for the Works includes for all items
and associated items necessary to complete the
Works and no subsequent claim for any additional
items will be entertained
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Road Works D 4.4 D/4.4/6
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL NO. 6.4 - ROAD WORKS (CONT'D)
BILL SUMMARY
Page D/4.4/1
Page D/4.4/2
Page D/4.4/3
Page D/4.4/4
Page D/4.4/5
TOTAL FOR BILL NO. 4.4 - ROAD WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 4.5
STREETLIGHTING NETWORK
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Streetlighting D 4.5 D/4.5/1
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Earth Pit
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Streetlighting D 4.5 D/4.5/2
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Streetlighting D 4.5 D/4.5/3
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Streetlighting D 4.5 D/4.5/4
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Connections
Allow for all necessary tie-in connection to other
street lighting networks; complete including co-
ordination and liaison with Local Authorities
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Streetlighting D 4.5 D/4.5/5
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Streetlighting D 4.5 D/4.5/6
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/4.5/1
Page D/4.5/2
Page D/4.5/3
Page D/4.5/4
Page D/4.5/5
TOTAL FOR BILL NO. 4.5 - STREETLIGHTING NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 4.6
STORMWATER WORKS
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 4.6 D/4.6/1
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 4.6 D/4.6/2
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Tie In Connections
Contractor to allow for all interface and co-
ordination required with stakeholders to facilitate
the final connection and tie in works in all
necessary tie-in connection to existing storm water
networks; complete with co-ordinate and liaise with
Local Authorities
C Allow for connections to existing manhole/ inlet X900 nr 6
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 4.6 D/4.6/3
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Stormwater Works D 4.6 D/4.6/4
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL SUMMARY
Page D/4.6/1
Page D/4.6/2
Page D/4.6/3
TOTAL FOR BILL NO. 4.6 - STORMWATER WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 4.7
POTABLE WATER WORKS
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Potable Water Works D 4.7 D/4.7/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
C 50 mm diameter J811 nr 1
CLASS K: Pipework - Manholes and Pipework
Ancillaries
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Potable Water Works D 4.7 D/4.7/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Potable Water Works D 4.7 D/4.7/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Tenderer's Adjustments
The Tenderer shall list any other items not included in
the BOQ but included in the specifications, scope of
works, Employer's requirements and necessary for the
complete and satisfactory completion of the works.
Should the Tenderer fail to insert any items in the
Tender Adjustments Schedule, it will be deemed that
their price for the Works includes for all items and
associated items necessary to complete the Works and
no subsequent claim for any additional items will
be entertained
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Potable Water Works D 4.7 D/4.7/4
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/4.7/1
Page D/4.7/2
Page D/4.7/3
TOTAL FOR BILL NO. 4.7 - POTABLE WATER WORKS CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 4.8
POWER NETWORK
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Power Network D 4.8 D/4.8/1
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL NO. 4.8 - POWER NETWORK
Note: All works are to be carried out in accordance
with ADDC/ADWEA Standards and Specifications
CLASS E: Earthworks
Excavate trenches, including excavation in any type
of soil, dispose of surplus material to an approved
location within site including haulage and backfill
with natural soil filling to the normal level and
compacted in layers, sieved sand beds and
surrounds, in any formation for single or multiple
MV/LV cable laying in the same trench or for the
jointing pit backfill the same and reinstate (MV/LV
cable & road crossing ducts measured separately)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure Power Network D 4.8 D/4.8/2
and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Cables
Termination
Tenderer's Adjustments
The Tenderer shall list any other items not included
in the BOQ but included in the specifications, scope
of works, Employer's requirements and necessary
for the complete and satisfactory completion of the
works. Should the Tenderer fail to insert any items
in the Tender Adjustments Schedule, it will be
deemed that their price for the Works includes for
all items and associated items necessary to
complete the Works and no subsequent claim for
any additional items will be entertained
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Power Network D 4.8 D/4.8/4
Infrastructure and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
BILL SUMMARY
Page D/4.8/1
Page D/4.8/2
Page D/4.8/3
TOTAL FOR BILL NO. 4.8 - POWER NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 4.9
TELECOMMUNICATION NETWORK
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure Telecommunication D 4.9
D/4.9/1
and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
C JRC 14 K131 nr 1
CLASS L: Pipe Work - Supports & Protection,
Ancillaries to Laying and Excavation
Connections
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Telecommunication D 4.9 D/4.9/3
Infrastructure and Lagoons Arterial Road Network
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/4.9/1
Page D/4.9/2
TOTAL FOR BILL NO. 4.9 - TELECOMMUNICATION NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO: 4.10
IRRIGATION NETWORK
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Irrigation Network D 4.10 D/4.10/1
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL NO. 4.10 - IRRIGATION NETWORK
Note: All works are to be carried out in accordance
with ADDC/ADM Standards and Specifications
CLASS K: Pipework - Manholes and Pipework
Ancillaries
Concrete Protection Slab
Concrete protection slab, including excavation,
backfilling, disposal of excavated material to
approved tip, reinforced concrete encasement, duct
markers, warning tapes, end caps, etc.
A Concrete protection K592 m 62
CLASS L: Pipework - Supports and Protection,
Ancillaries to Laying and Excavation
Beds and Surrounds
Reinforced concrete beds and surrounds to road
crossing pipes/ducts including reinforcement
formwork, waterproofing, blinding and necessary
accessories all in accordance with the Drawings
and Specifications
B Concrete protection L551 m 62
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Irrigation Network D 4.10 D/4.10/2
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
A
B
C
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Irrigation Network D 4.10 D/4.10/3
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/4.10/1
Page D/4.10/2
TOTAL FOR BILL NO. 4.10 - IRRIGATION NETWORK CARRIED TO BILL SUMMARY
BILLS OF QUANTITIES
BILL NO. 5
TMC BUILDING
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure TMC BUILDING D 5 D/5/1
and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
CLASS E: EARTHWORKS
Excavation Ancillaries
Backfilling
Backfilling (cont'd)
Filling Ancillaries
Horizontal areas
Vertical areas
Dewatering System
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure TMC BUILDING D 5 D/5/3
and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Provision of concrete
Placing of concrete
To boundary wall
To boundary wall
Formworks
Rough Finish
Plane Vertical
Fair Finish
Plane Horizontal
Plane Vertical
Rough Finish
Plane Vertical
Fair Finish
Plane Horizontal
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure TMC BUILDING D 5 D/5/6
and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Formworks (cont'd)
Plane Vertical
To boundary wall
Plane Vertical
Reinforcement
Joints
Concrete accessories
External Works
L RCC Hume pipe; ref: P1, Depth: not exceeding 1.5 I212 m 28
External Works
External Works
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/8
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/9
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Ancillaries
Surface markings
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure TMC BUILDING D 5 D/5/10
and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
External wall
To boundary wall
Internal wall
CLASS V: PAINTING
External wall
To boundary wall
Internal wall
CLASS V: PAINTING
CLASS W: WATERPROOFING
Roofing
Roofing (cont'd)
Protective Layers
Gate Barrier
Site furniture
External
Vent pipes
Waste pipes
Soil pipes
Vent pipes
Waste pipes
Soil pipes
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/15
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/16
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Windows
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/17
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
External Doors
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/18
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Internal Doors
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/19
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Glazing
Surface finishes
Internal finishes
Floor finishes
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/20
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/21
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Infrastructure TMC BUILDING D 5 D/5/22
and Lagoons Arterial Road
CESMM3
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE AMOUNT (AED)
REF.
Wall finishes
To boundary wall
L Allowance for lift and shaft wall finishes, including plaster Z413.11 m2 114
To boundary wall
Ceiling Finishes
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/24
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Suspended ceilings
Partition
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/25
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Partition (cont'd)
External finishes
Wall Finishes
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/26
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Ceiling Finishes
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/27
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Roof finish
Miscellaneous works
G Allowance for fixed furniture to pantry and dining room Z900.6 Item 1
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/28
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/29
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Conveying system
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/30
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/31
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Pex pipes with sleeves for all dropper cold and hot
pipes from ceiling to the fixtures at all toilets, bath
rooms and kitchen including angle valves & all
required accessories, in accordance with
the Drawings and Specifications
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/32
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/33
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Miscellaneous
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/34
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/35
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/36
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
H Y-strainer Z512.26 nr 1
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/37
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
A First and fire hose reel 30m length x 20mm diameter Z525.2 nr 2
L First and fire hose reel 30m length x 20mm diameter Z525.5 nr 1
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/38
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/39
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/40
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
L Thermostat Z631.18 nr 17
Q Thermostat Z631.22 nr 3
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/41
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/42
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
B MSFD-700x250mm Z623.2 nr 2
C MSFD-700x300mm Z623.3 nr 2
E MSFD-750x250mm Z623.5 nr 2
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/43
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Inline fans with fresh air filter and sand trap, including
dampers, controls, control wiring, canvas
connections, fixing accessories, vibration isolators,
electrical works (components, wiring, etc.) complete;
all in accordance with the Drawings and
Specifications
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/44
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Fresh air cut-out with 100mm thick filter and sand trap Z629.12
B nr 1
louver (area 1.5sqft.)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/45
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
D 20KVA Z781.3 nr 1
E DG - 200KVA Z781.4 nr 1
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/46
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
E GF LPDB Z781.9 nr 1
F FF LPDB Z781.10 nr 1
N EMDB-GF Z781.17 nr 1
P EMDB-FF Z781.18 nr 1
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/47
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/48
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
PP1 for general power point, 6/16A switch with socket- Z784.1
H nr 27
02 nos
PP2 for general power point, 6/16A switch with socket- Z784.2
J nr 3
01 nos
PP3 for general power point floor box, 6/16A switch Z784.3
K nr 7
with socket-03 nos
PP4 for general power point, 6/16A switch with socket- Z784.4
L nr 2
02 nos
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/49
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/50
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/51
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/52
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
D Hooter Z781.25 nr 3
K Hooter Z781.30 nr 1
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/53
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
A MDF-2 Z781.34 nr 1
To External
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/55
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/56
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Video Storage
Video recording facility and Storage System in
compliance with dual controller design, multiple raid
level, capable of storing 90 days video streams of
E Z781.58 nr 1
cameras with a resolution of 1280x720 and 30 frame
per seconds inclusive of all hardware and software
capable of archiving and play back and as described
in the Particular Specifications
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/57
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Operator Workstation
Standard workstations plus three monitors for each
traffic operators position enabling them to monitor the
Traffic Control System, Road Network, CCTV
A streams, equipment status, etc. Z781.59 nr 3
- each workstation preinstalled and activated with
Windows 10 Pro and other licensed standard office
softwares such as Micorsoft Office, Adobe Acrobat,
etc.
Printer
B Central Printing Facility as detailed in the Particular Z781.60 nr 1
Specifications
Digital Clock
C Z781.61 nr 1
Digital Clock for real time display in the Operations
area
Server Rack and Active/Passive Hardware
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/58
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Integration of Sub-systems
The Contractor shall integrate free of charge the
following existing UTC systems at 'centre to centre'
D Z781.75 nr 1
level with the UTC system procured under this
contract:
- AD TMC
- Ras al Akhdar
Spare parts
Operator Workstation
Standard workstations plus three monitors for each
traffic operators position enabling them to monitor the
Traffic Control System, Road Network, CCTV
G streams, equipment status, etc. Z781.78 nr 1
Workstation shall be preinstalled and activated with
Windows 10 Pro and other licensed standard office
softwares such as Micorsoft Office, Adobe Acrobat,
etc.
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/59
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
Tenderer's Adjustments
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/60
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/5/1
Page D/5/2
Page D/5/3
Page D/5/4
Page D/5/5
Page D/5/6
Page D/5/7
Page D/5/8
Page D/5/9
Page D/5/10
Page D/5/11
Page D/5/12
Page D/5/13
Page D/5/14
Page D/5/15
Page D/5/16
Page D/5/17
Page D/5/18
Page D/5/19
Page D/5/20
Page D/5/21
Page D/5/22
Page D/5/23
Page D/5/24
Page D/5/25
CARRIED FORWARD
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/61
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BROUGHT FORWARD
Page D/5/26
Page D/5/27
Page D/5/28
Page D/5/29
Page D/5/30
Page D/5/31
Page D/5/32
Page D/5/33
Page D/5/34
Page D/5/35
Page D/5/36
Page D/5/37
Page D/5/38
Page D/5/39
Page D/5/40
Page D/5/41
Page D/5/42
Page D/5/43
Page D/5/44
Page D/5/45
Page D/5/46
Page D/5/47
Page D/5/48
Page D/5/49
Page D/5/50
CARRIED FORWARD
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining TMC BUILDING D 5 D/5/62
Infrastructure and Lagoons Arterial Road
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BROUGHT FORWARD
Page D/5/51
Page D/5/52
Page D/5/53
Page D/5/54
Page D/5/55
Page D/5/56
Page D/5/57
Page D/5/58
Page D/5/59
BILLS OF QUANTITIES
BILL NO: 6
OPERATION AND MAINTENANCE WORKS
SAADIYAT CULTURAL DISTRICT AND LAGOONS ARTERIAL ROAD REMAINING INFRASTRUCTURE WORKS-PACKAGE 2
SAADIYAT ISLAND, ABU DHABI, UAE
Tender No. A322201/2021/T/026
To B2
A Road Works
Year 1 X900.1 month 12
B Street Lighting Network
Year 1 X900.2 month 12
C Storm Water Works
Year 1 X900.3 month 12
D Potable Water Works
Year 1 X900.4 month 12
E Sewerage Works
Year 1 X900.5 month 12
F Power & FOC Networks
Year 1 X900.6 month 12
G Telecommunication Network
Year 1 X900.7 month 12
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Operation & D 6.1 D/6.1/2
Infrastructure and Lagoons Arterial Road Maintenance Works
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
C MCC Network
Year 1 X900.10 month 12
D District Cooling
Year 1 X900.11 month 12
E Traffic Signal Network
Year 1 X900.12 month 12
F Tunnel Works
Year 1 X900.13 month 12
Storm Water Pumping Station, MCC and DG
G Building
Year 1 X900.14 month 12
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Operation & D 6.1 D/6.1/3
Infrastructure and Lagoons Arterial Road Maintenance Works
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Operation & D 6.1 D/6.1/4
Infrastructure and Lagoons Arterial Road Maintenance Works
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Operation & D 6.1 D/6.1/5
Infrastructure and Lagoons Arterial Road Maintenance Works
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/6.1/1
Page D/101/2
Page D/6.1/3
Page D/6.1/4
TOTAL FOR BILL NO. 6.1 - OPERATION AND MAINTENANCE WORKS to Year 1 (12 Months)CARRIED TO
BILL SUMMARY
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Operation & D 6.2 D/6.2/1
Infrastructure and Lagoons Arterial Road Maintenance Works
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To B2
A Road Works
Year 2 X900.1 month 12
Year 3 X900.2 month 12
Year 4 X900.3 month 12
Year 5 X900.4 month 12
B Street Lighting Network
Year 2 X900.5 month 12
Year 3 X900.6 month 12
Year 4 X900.7 month 12
Year 5 X900.8 month 12
C Storm Water Works
Year 2 X900.9 month 12
Year 3 X900.10 month 12
Year 4 X900.11 month 12
Year 5 X900.12 month 12
D Potable Water Works
Year 2 X900.13 month 12
Year 3 X900.14 month 12
Year 4 X900.15 month 12
Year 5 X900.16 month 12
E Sewerage Works
Year 2 X900.17 month 12
Year 3 X900.18 month 12
Year 4 X900.19 month 12
Year 5 X900.20 month 12
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Operation & D 6.2 D/6.2/2
Infrastructure and Lagoons Arterial Road Maintenance Works
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Operation & D 6.2 D/6.2/3
Infrastructure and Lagoons Arterial Road Maintenance Works
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To B3
D Road Works
Year 2 X900.57 month 12
Year 3 X900.58 month 12
Year 4 X900.59 month 12
Year 5 X900.60 month 12
E Street Lighting Network
Year 2 X900.61 month 12
Year 3 X900.62 month 12
Year 4 X900.63 month 12
Year 5 X900.64 month 12
F Storm Water Works
Year 2 X900.65 month 12
Year 3 X900.66 month 12
Year 4 X900.67 month 12
Year 5 X900.68 month 12
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Operation & D 6.2 D/6.2/4
Infrastructure and Lagoons Arterial Road Maintenance Works
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Operation & D 6.2 D/6.2/5
Infrastructure and Lagoons Arterial Road Maintenance Works
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Operation & D 6.2 D/6.2/6
Infrastructure and Lagoons Arterial Road Maintenance Works
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
To Collection
BILLS OF QUANTITIES
Tender No. - A322201/2021/T/026 Bill of Quantities Bill Section Bill No. Page No.
Saadiyat Infrastructure - Cultural District Remaining Operation & D 6.2 D/6.2/7
Infrastructure and Lagoons Arterial Road Maintenance Works
CESMM3 AMOUNT
ITEM REF ITEM DESCRIPTION UNIT QUANTITY UNIT RATE
REF. (AED)
BILL SUMMARY
Page D/6.2/1
Page D/6.2/2
Page D/6.2/3
Page D/6.2/4
Page D/6.2/5
Page D/6.2/6
TOTAL FOR BILL NO. 6.2 - OPERATION AND MAINTENANCE WORKS to Year 2 to Year 5 CARRIED TO
BILL SUMMARY
BILLS OF QUANTITIES
SECTION E - GRAND SUMMARY
Saadiyat Infrastructure - Cultural District Remaining Infrastructure and Lagoons Arterial Road - Package 2
BILLS OF QUANTITIES
GRAND SUMMARY
S U-turn & qualification plate sign, type 330 & 365; 1 post R81*.7 nr
Speed limit & maximum height limit sign, type 341 &
A R81*.8 nr
355; fixed on gantry post
B Speed limit sign, type 341 R81*.9 nr
Bus stop sign, type 390.1 & 390.2; 1 post; excluding
C R81*.10 nr
sign
D Maximum headroom sign, type 425 R81*.11 nr
Tender No. A322201/2021/T/026
F Bollards X900.3 nr
B DN 100 J812 nr
Supply and installation of HDPE pipe fittings including
all accessories as per Drawings and Specifications
End cap
C End cap, 110mm dia J612.4 nr
Equal TEE's
D OD 315x110x315 mm dia, equal TEE J612.5 nr
CLASS K: Pipework - Manholes and Pipework
Ancillaries
Construct reinforced concrete chambers with precast
cover slab for valves, including waterproofing, water
stop at construction joints, installation of hot dipped
galvanized lifting hooks in cover slab, supports for valve
spindle extension; casting in of anchor flange, sealing
flange (water stop), access cover frame, surface box,
chamber indication plates, owner information plate,
ventilation pipes, bolting of aluminium ladder,
excavation, dewatering, backfilling etc., all as per the
Specification and as shown on Drawings, Specifications
and as directed and authorized by the Engineer (valves
measured separately)
E Isolation valve chamber(s) K232.1 nr
CLASS L: Pipe Work - Supports & Protection,
Ancillaries to Laying and Excavation
Road Crossing Ducts
Supply and Installation of concrete encased GRP duct
pipes including all fittings laid in trench for road
crossings including spacers, excavation, backfilling,
disposal, commissioning and warning tape; complete as
per specification; (concrete beds and surrounds
measured separately)
GRP duct : depth 1.5 to 2.0m
A DN450 GRP duct K593.1 m
End cap
M End cap,160mm dia, class 10 J421 nr
Tender No. A322201/2021/T/026
A Endcap J42* nr
Tender No. A322201/2021/T/026
B JRC 12 K131 nr
Ducts
Supply & install of telecommunication ducts (Type D54)
including excavation and disposal of excavated material,
complete with draw rope, all necessary fittings and
accessories and suitable duct markers, end cap,
warning tape and carry out mandrel test including
connection to chamber and reinstatement, all in
accordance with Drawings and Specifications
C PVC duct; 2xD54 K592.1 m
D PVC duct; 4xD54 K592.1 m
Road Crossing Ducts
Road crossing ducts with uPVC(class 10) including
excavation, backfilling, disposal of excavated tip,
reinforced concrete encasement, duct markers warning
tapes, end caps etc
Endcap
B 110 mm dia J621 nr
Gate Valve
C 110 mm dia J811 nr
Flow Meter
D 110 mm dia J891 nr
CLASS K: Pipework - Manholes and Pipework
Ancillaries
Road Crossing Ducts
Road Crossing Ducts with uPVC (class 10), including
excavation, backfilling, disposal of excavated material to
approved tip, reinforced concrete encasement, duct
markers, warning tapes, end caps, etc.
Gate valve
C 63mm diameter J811 nr
CLASS X: Miscellaneous Works
Connection
Allow for all necessary tie-in connection to proposed
external gas networks; complete including co-ordination
and liaison with Local Authorities
Tender No. A322201/2021/T/026
A DN 200 L513 m
CLASS X: Miscellaneous Works
To pumping station
A Depth of 0.25 m - 0.50 m E212 m3
B Depth of 2.00 m - 5.00 m E215 m3
C Depth of 5.00 m - 10.00 m E216 m3
D Depth of 10.00 m - 15.00 m E217 m3
To MCC building
E Depth of 5.00 m - 10.00 m E216 m3
Preparation of excavated surfaces
Material other than topsoil, rock or artificial hard material
F To pumping station E522.1 m2
G To MCC building E522.2 m2
Disposal of excavated materials
Material other than topsoil, rock or artificial hard material
H To pumping station E532.1 m2
J To MCC building E532.2 m2
Filling
To structures
K Cement stabilised fill at MCC building E619 m3
Filling ancillaries
Preparation of filled surfaces
Material other than topsoil, rock or artificial hard
Tender No. A322201/2021/T/026
To MCC building
E Thickness not exceeding 150-300 mm F582 m3
Tender No. A322201/2021/T/026
To pumping station
F Base slab; thickness 500 mm F623.1 m3
G Suspended slabs; thickness 400 mm F632.1 m3
H Suspended slabs; thickness 300 mm F632.2 m3
J Walls; thickness 300 mm F642.1 m3
K Walls; thickness 200 mm F642.2 m3
L Walls; thickness 500 mm F643.1 m3
To MCC building
M Base slab; thickness 1500 mm F623.2 m3
N Suspended slabs; thickness 500 mm F632.3 m3
P Walls; thickness 400 mm F643.2 m3
Q Walls; thickness 500 mm F643.3 m3
R Walls; thickness 600 mm F643.4 m3
S Walls; thickness 1000 mm F643.5 m3
T Upstand; thickness 400 mm F693 m3
CLASS G: CONCRETE ANCILLARIES
Formwork; Rough Finish
Plane Vertical
To pumping station
A Width; exceeding 1.22 m G145.1 m2
To MCC building
B Width; 0.4 - 1.22 m G144 m2
C Width; exceeding 1.22 m G145.2 m2
Formwork; Fair Finish
Plane Horizontal
To pumping station
D Width; exceeding 1.22 m G215.1 m2
To MCC building
E Width; exceeding 1.22 m G215.2 m2
Plane Vertical
To pumping station
F Width; 0.2 - 0.4 m G243.1 m2
G Width; 0.4 - 1.22 m G244 m2
H Width; exceeding 1.22 m G245 m2
To MCC building
J Width; 0.2 - 0.4 m G243.2 m2
K Width; exceeding 1.22 m G245 m2
Reinforcement
Deformed high yield steel bars to BS4449 Grade
Fy 500
L Various diameters; to pumping station G529.1 t
M Various diameters; to MCC building G529.2 t
Tender No. A322201/2021/T/026
To MCC building
F To concrete walls V733.2 m2
G To plastered walls; external V733.3 m2
H To ceilings V734.2 m2
CLASS W: WATER PROOFING
Damp-proofing
Water proofing membrane
To pumping station; externally
Upper surfaces inclined at an angle not exceeding
A W 141.1 m2
30degrees to the horizontal
Surfaces inclined at an angle exceeding 60 degrees to
B W 143.1 m2
the horizontal
To MCC building; externally
Upper surfaces inclined at an angle not exceeding 30
C W 141.2 m2
degrees to the horizontal
Surfaces inclined at an angle exceeding 60 degrees to
D W 143.2 m2
the horizontal
To MCC building
C Double leaf swing door; 2600 x 2500 mm high (overall) Z393 nr
Metal door and frames including glazing window,
ironmongery and all necessary fixing accessories as per
Drawing and Specifications
To MCC building
D Single leaf; 1500 x 2500 mm high (overall) Z323 nr
Metal louvre including frames, finishes and all necessary
fixing and accessories as per Drawing and
Specifications
To MCC building
E 1600 x 2200 mm high (overall) Z325.1 nr
F 1000 x 2000 mm high (overall) Z325.2 nr
G 600 x 600 mm high (overall) Z325.3 nr
H 450 x 450 mm high (overall) Z325.4 nr
Heavy duty DI access cover and frame; including
ironmongery and all necessary fixing accessories; all in
accordance with the Specifications
To pumping station
A 600 x 600 mm wide (clear opening) Z329.1 nr
B 750 x 750 mm wide (clear opening) Z329.2 nr
C 800 x 400 mm wide (clear opening) Z329.3 nr
D 1150 x 800 mm wide (clear opening) Z329.4 nr
E 1200 x 200 mm wide (clear opening) Z329.5 nr
To MCC and DG Building
Piped building services
D EXF-01&02, 251 L/s flow rate, duct inline type, 1 Duty + Z633.1 nr
E EXF-03&04, 150 L/s flow rate, duct inline type, 1 Duty + Z633.2 nr
Cabled building services
Cabling, laid in ducts, cable tray or trunking (measured
separately), cable sleeves, including terminations,
fixings, fittings required to equipment, complete;
as all in accordance with Drawings and Specifications
Surface markings
TEE's
C OD 110mm x110mmx110mm dia. equal TEE J612.1 nr
D OD 225mm x110mmx225mm dia. un-equal TEE J612.2 nr
E OD 315mm x110mmx315mm dia. un-equal TEE J612.3 nr
F OD 315mm x160mmx315mm dia. un-equal TEE J612.4 nr
End cap
G End cap, 110mm dia J612.5 nr
H End cap, 160mm dia J612.6 nr
Stop valve
End cap
C End cap, 63mm diameter J691.1 nr
D End cap, 90mm diameter J691.2 nr
CLASS X: Miscellaneous Works
Connection
Allow for all necessary tie-in connection to proposed
external gas networks; complete including co-ordination
and liaison with Local Authorities
A
200mm thick aggregate base course (min. CBR 80%) R195.3 m2
Ancillaries
Intermittent lines
Thermo-plastic paint (white) complete as per Drawings
and Specifications
C 50 mm diameter J811 nr
Tender No. A322201/2021/T/026
D OD 50 mm dia L501 m
Wrapping & Lagging
Tender No. A322201/2021/T/026
B JRC 14 K131 nr
Tender No. A322201/2021/T/026
H RCC Hume pipe; ref: P1, Depth: not exceeding 1.5 I212 m
CLASS K: PIPEWORK - MANHOLES AND
PIPEWORK ANCILLARIES
External Works
Manhole chamber complete with excavation, backfilling,
concreting, reinforcement, waterproofing, cover and
frame etc. complete all in accordance with the Drawings
and Specifications
A Manhole chamber; ref: MH K131.1 nr
Tender No. A322201/2021/T/026
External wall
To TMC main building
A 350mm thick wall U431.1 m2
B 300mm thick wall U431.2 m2
C 200mm thick wall U421.1 m2
To maintenance yard covered area
D 350mm thick wall U431.3 m2
E 200mm thick wall U421.2 m2
Internal wall
To TMC main building
F 250mm thick wall U421.3 m2
G 200mm thick wall U421.4 m2
H 100mm thick wall U411.1 m2
To maintenance yard covered area
J 200mm thick wall U421.5 m2
K 100mm thick wall U411.2 m2
CLASS V: PAINTING
L Painting on upstand kerbs V939 m
CLASS W: WATERPROOFING
Waterproofing membrane to structures exposed to
earth; all in accordance with the Drawings and
Specifications
To TMC main building
Upper surfaces inclined at an angle not exceeding 30°
A W141.1 m2
to the horizontal
Surfaces inclined at an angle exceeding 60° to the
B W143.1 m2
horizontal
To maintenance yard covered area
Upper surfaces inclined at an angle not exceeding 30°
C W141.2 m2
to the horizontal
Surfaces inclined at an angle exceeding 60° to the
D W143.2 m2
horizontal
Waterproofing membrane to wet areas; all in
accordance with the Drawings and Specifications
Fresh air cut-out with 100mm thick filter and sand trap Z629.12
B nr
louver (area 1.5sqft.)
Cabled building services
To TMC main building
Electric meter including terminations,
connections, fittings, fixing accessories, etc. as
per ADDC regulations; all in accordance with
the Drawings and Specifications
D 20KVA Z781.3 nr
To maintenance yard covered area
Diesel generator including control panel, storage fuel
tank, interconnecting pipework, fuel filling pipe, exhaust
gas pipe, fixing accessories, complete; all in
accordance with the Drawings and Specifications
E DG - 200KVA Z781.4 nr
Panel boards including bus bars, circuit breakers and
all necessary accessories to complete;
in accordance with the Drawings and Specifications
A 50x5mm Cu. earth strip/150mm2 single core Cu. cable Z711.18 item
B 25x5mm strip/70mm2 single core Z711.19 item
C 25x3mm strip/8 SWGx2nos Z711.20 item
D Lightning arrester ESE type-covering radius 28 meter Z711.21 nr
E 70mm2 insulated Cu. conductor Z711.22 m
Fire alarm devices including all necessary fixing
accessories complete; all in accordance with Drawings