Doha Metro Project

Asset Fault/Defect Report


M008: GWST020
S200-ACIFM-MNT-30-
ACIFM Report No: Station: White Palace Date: 28/07/2020
RPT-XXXXXXX-01991
Station

Sub CWS/Pressurizatio 11:00


RKH Ref. No. NA Time:
System n system

ACIFM/ Sub- ACIFM


Location of Event: White Palace Station
Contractor: Technicians

Position & Mechanical /


Person(s) Involved: Ignacio Nicor
I.D: HVAC SME

☐ Customer ☒ Assets
Subsequent Impact: Safety: ☐ High* ☒ Med* ☐ Low* ☒ Operations
Experience Reliability / Life
* High: Immediate Safety Impact (within 1 week) Medium: Potential Safety Impact (~1week or more) Low: Potential Safety Impact (~1month or more)

Fault/ Defect Title: Chilled water dedicated pressurization system is not in operation and
malfunction.

Fault/ Defect Description: When the Chiller team carried out PPM inside the HVAC Pump room. They have
observed that the chilled water pressurization system is not in ready position as
all switches from control panel, isolator is in switch Off mode and the water piping
valves are isolated. This requires immediate rectification by the JV.

Asset/ Plant/ Equipment reference: MEP-CWS-ACC

Means of Fault / Defect realisation ☐ PM ☒ CM ☐ Testing ☐ Random Inspection ☐ Incident /Accident


☐ Other Specify______________

Actions Taken:  Visual inspection and analysis have d


 Inform the SM that this additional defect observation had to be raised
and to be rectified by the JV.

Parts removed ☐ Yes ☒ NO


Is Yes [Specify Equipment Description/Part Number/Serial Number]
1.
2.
3.

Parts Used ☐ Yes ☒ NO


Is Yes [Specify Equipment Description/Part Number/Serial Number]
1.
2.
3.

Current Status: ☒ Open/Outstanding ☐ Partial/Temporary ☐ Closed/resolved


☐ Other Specify______________

Property: QHSE Dept. ACIFM – Internal Use Only


M01-ACI-HSE-FRM-0034 Rev. 2 Page 1 of 2
Doha Metro Project

Action(s) to Be Taken/ Recommendation(s): Responsible Due Date

JV shall rectify and complete the T&C process of the pressurization system PSH JV 18.08.2020
and to put online as this vital to the chilled water line.

Root cause analysis shall be conducted on the above-mentioned defect, PSH JV 18.08.2020
corrective action shall be derived and implemented

Full Name Mohamed Ben Shaam Position Mechanical Supervisor

Approved: Adib Yaghi Position MEP Manager

Supporting information:

PPM WO:183851 (08.08.2020); 165411 (08.07.2020) & 145224 (08.06.2020)- PPM Done

Both Isolator and control panel switch are OFF position.

Photo

Property: QHSE Dept. ACIFM – Internal Use Only


M01-ACI-HSE-FRM-0034 Rev. 2 Page 2 of 2