GADARWARA SUPER THERMAL POWER PROJECT

PROJECT STAGE I 2 X 800 MW


COAL HANDLING PLANT PACKAGE

CLIENT

NTPC COMMENTS DRG/DOC NO. REV.


LETTER NO./DATE CAT
35193 / 02.11.17 II
9572-155-PVE-Y-176 03

GA, Wiring diagram, BOM, I/O list etc. of


DOCUMENT TITLE:
PLC Panel for S/R

EPC CONTRACTOR

FOR APPROVAL FOR REVIEW FOR INFORMATION REFERENCE & RECORDS

R3 10.11.17 FOR APPROVAL HDS HDS NSR NSR SBD SBD


R2 11.10.17 FOR APPROVAL HDS HDS NSR NSR SBD SBD
R1 22.07.17 FOR APPROVAL HDS HDS NSR NSR SBD SBD
R0 03.03.17 FOR APPROVAL HDS HDS NSR NSR SBD SBD
Rev Initials Sign Initials Sign Initials Sign
Date Description
No Prepared by Reviewed by Approved by
REPORT NO:-
T400/CR/CO 2405/SR3 COMPLIANCE REPORT PAGE 1 OF 1

ORDER NO:- CO/2405 DATE:- 10.11.2017


PROJECT:- NTPC GADARWARA PROJECT, Stage I (CHP)

DOCUMENT FOR:- GA, wiring diagram, BOM, I/O list etc. of PLC Panel for S/R
DRAWING NO:- 9572-155-PVE-Y-176 REV.:- 03
COMMENTS
NTPC Reference: CC:PE155:35193 dated 02.11.2017
RECEIVED VIDE:-

Sr.
NTPC Comments ELECON Clarification
No.
plz refer drg no: 9572-155-PVE-Y-180 for typical
1 Comments comply.
comments and comply.
ELECON ENGINEERING CO. LTD.

03

ELECON ENGINEERING CO. LTD.


ELECON ENGINEERING CO. LTD.