: 015.24/AI/DIV-1/I/2019
NO Items Satuan
B Services :
Optical Distribution Networks
1 Jasa Tarik FO Micro Cable 48 - 72 Core (Include mobilisasi & Koordinasi Lingkungan) Meter
2 Penarikan Drop Cable 4 - 12 Core (Include mobilisasi & Koordinasi Lingkungan) Meter
3 Penarikan Drop Cable 1 - 2 Core indoor (Include mobilisasi & Koordinasi Lingkungan) Meter
4 Tiang 6 Meter (3 inches + 3 inches) Unit
5 Tiang 8 Meter (4 inches + 3 inches) Unit
6 Splicing + OTDR Core
7 Terminasi di pelanggan ( Pemasangan Fiber outlet + Splicing) Lot
8 Instalasi Fixing Slack Incl. Pemasangan Joint Box Unit
9 Instalasi ODP Incl. pemasangan Splitter Unit
10 Mobilisasi untuk bawa tiang Lot
11 Dokumen dan Pelaporan Lot
Total
TOTAL
hid hasyim
18,500 Rp -
12,500 Rp -
4,550 Rp -
4,000 Rp -
1,760 Rp -
700 720 Rp 504,000
517,000 - Rp -
365,000 1 Rp 365,000
150,000 Rp -
150,000 Rp -
660,000 1 Rp 660,000
900,000 - Rp -
30,000 1 Rp 30,000
Rp 1,559,000
5,000 - Rp -
3,000 - Rp -
2,000 720 Rp 1,440,000
200,000 1 Rp 200,000
300,000 - Rp -
35,000 3 Rp 105,000
100,000 3 Rp 300,000
75,000 - Rp -
150,000 Rp -
250,000 1 Rp 250,000
70,000 3 Rp 210,000
Rp 2,505,000
Rp 4,136,000
Customer : Fttx Nusanet_Edbert-JLM_Fave-Indonet_Whid hasyim
Region : Divre-1
Description
1 2 3
Begining Balance - 6.58 9.64
Cash in
1. Instalation Charge 4.70
2. Revenue 4.15 4.15 4.15
Total Cash in 8.85 4.15 4.15
Cash out
A. Capital expense
1. Services expense (2.505)
2. Material expense (1.559)
3. Other expense
Total Capital expense - - -
B. Maintenance expense
1. Trouble shoot 0.07 0.07 0.07
Total Maintenance expense 0.07 0.07 0.07
Dibuat oleh,
33
Meder Tarigan
M_Fave-Indonet_Whid hasyim
*Kelebihan Kabel
200000 Edbert
Tahun ke-1
4 5 6 7 8 9 10 11 12
12.70 15.76 18.82 21.88 24.93 27.99 31.05 34.11 37.17
- - - - - - - - -
37
1.2500%
Disetujui oleh,
Elvinsius Sembiring
In Million Rp.
Tahun ke-2
Total 1 2 3 4 5 6 7 8
- - - - - - - - -
4.70
49.80 - - - - - - - -
54.50 - - - - - - - -
-
-
-
- - - - - - - - -
0.86 - - - - - - - -
0.86 - - - - - - - -
0.86 - - - - - - - -
13.41 - - - - - - - -
36.16 - - - - - - - -
36.16 - - - - - - - -
2
9 10 11 12 Total
- - - - -
4.70
- - - - 49.80
- - - - 54.50
-
-
-
- - - - -
- - - - 0.86
- - - - 0.86
- - - - 0.86
- - - - 13.41
- - - - 53.64
- - - - 53.64
Fttx Nusanet_Edbert-JLM_Fave-Indonet_Whid hasyim
Instalasi
No. Kota Nama Site Layanan Target User Estimasi Biaya
Instalasi
C Material :
Tambahan Aktifasi
1 Rosset Pcs
2 Pigtail SC Connector Pcs
3 Patch Core SC-SC Connector Pcs
4 Patch Core SC-LC Connector Pcs
5 Adapter SC Pcs
6 Termofit Pcs
7 ONU C-Data + adaptor Unit
Edbert Fave Whid hasyim Total
Rp -
Rp -
220 100 400 Rp 1,440,000
1 Rp 200,000
Rp -
1 1 1 Rp 105,000
1 1 1 Rp 300,000
Rp -
1 Rp 150,000
1 Rp 250,000
1 1 1 Rp 210,000
Rp -
Rp 2,655,000
1 1 1
2 2 2
1 1 1
1 1 1
1 1 1
1 1 1