Professional Documents
Culture Documents
Face Plates
Racks
17 Rack of size 42U with fan & power strip Piece
Note 1 : the riser will be executed by the Engineering Department of MAC according to our requirements.
Note 2 : all the lengthes of the cables are calclated according to the drawings that have been got from the customer and ac
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Department of MAC
about the paths routes it may be some change in the lengthes.
Note : Please be informed that this offer doesn't include the accommodation and it will be charge on the customer
This offer will be done in one visit and any extra visit will be with extra charge
407900471 139
700206725 278
140 19,460
407900422 278
N/A 139
N/A 10 20 200
N/A 20 28 560
N/A 70 36 2,520
N/A 48 42 2,016
N/A 38 47 1,786
N/A 40 53 2,120
N/A 10 92 920
Imported 1 7,500 7,500
142,747
ements.
on the customer
MAC Carpets
S.N Description
Face Plates
3 Supply of LF80 .
Racks
Note 1 : the riser and the cable trays inside the factory will be executed
by the Engineering Department of MAC according to our requirements.
Note 2 : all the lengthes of the cables are calclated according to the drawings that have been got from the c
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Depa
about the paths routes it may be some change in the lengthes.
Note : Please be informed that this offer doesn't include the accommodation and it will be charge on the cus
This offer will be done in one visit and any extra visit will be with extra charge
Piece 407900471 24
Piece 700206725 48
140 3,360
Piece 407900422 48
Piece N/A 24
47,152
Face Plates
Note 2 : all the lengthes of the cables are calclated according to the drawings that have been got from the custo
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Departm
about the paths routes it may be some change in the lengthes.
Note : Please be informed that this offer doesn't include the accommodation and it will be charge on the custom
This offer will be done in one visit and any extra visit will be with extra charge
407900471 60
700206725 120
140 8,400
407900422 120
N/A 60
N/A 15 28 420
N/A 8 53 424
80,194
our requirements.
Face Plates
Racks
Note 1 : the riser will be executed by the Engineering Department of MAC according to our requirements.
Note 2 : all the lengthes of the cables are calclated according to the drawings that have been got from the custo
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Departm
about the paths routes it may be some change in the lengthes.
Note : Please be informed that this offer doesn't include the accommodation and it will be charge on the custom
This offer will be done in one visit and any extra visit will be with extra charge
407900471 88
700206725 176
140 12,320
407900422 176
N/A 88
N/A 20 28 560
N/A 45 36 1,620
N/A 37 42 1,554
N/A 33 47 1,551
N/A 13 53 689
our requirements.
Face Plates
OptiSPEED Multimode indoor fiber optic cable 4 core (inside the building)
11 FT
Racks
Note 2 : all the lengthes of the cables are calclated according to the drawings that have been got from the custo
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Departm
about the paths routes it may be some change in the lengthes.
Note : Please be informed that this offer doesn't include the accommodation and it will be charge on the custom
This offer will be done in one visit and any extra visit will be with extra charge
407900471 22
700206725 44
140 3,080
407900422 44
N/A 22
CPC3312-03F003 44 45 1,980
CPC3312-03F010 44 50 2,200
N/A 12 28 336
N/A 35 36 1,260
60,826
according to our requirements.
Face Plates
Note 1 : all paths in this building will be executed by the Engineering Department of MAC according to our requ
Note 2 : all the lengthes of the cables are calclated according to the drawings that have been got from the custo
to our suggestion of the paths shape and if there is any conflict that raised by the Engineering Departm
about the paths routes it may be some change in the lengthes.
Note : Please be informed that this offer doesn't include the accommodation and it will be charge on the custom
This offer will be done in one visit and any extra visit will be with extra charge
Terms & Conditions :
* Prices :All prices in EGP including sales tax
* Payment :50% down payment with purchase order
40% upon delivery
10% after installation & testing
* Validity :One week
* Delivery :Within One week
Date : 22/7/2008
407900471 9
700206725 18
140 1,260
407900422 18
N/A 9
CPC3312-03F003 18 45 810
CPC3312-03F010 18 50 900
39,290