Process Flow For Site Visit / Visual Scaffolding Erection Insulation Removal

PDT Inspection If Required If Required

KESB-MN-003-00 PTS 15.13.01 (2018)


(KMZ Procedure) (Waiting to get from
Petronas)

UTTM / Phonon Phonon Diagnostic Reporting / Repair If Touch Up Painting If


Preparation Testing Required Required

API 570 / 574 / KMZ-PDT-TEC- P01 ???


ASME V / ASNT (KMZ Procedure) (KMZ Procedure)

Scaffolding Job Complete


Insulation
Dismantle

PTS 15.13.01 (2018) KESB-MN-003-00


(Waiting to get from (KMZ Procedure)
Petronas)