You are on page 1of 66

LAPORAN GAJI TUKANG DAN KENEK

PROYEK RSU KASIH ABADI SIMPANG POS


PERIODE TGL 1 MARET 2021 S/D 6 MARET 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Vijai Kn 5 70,000 350,000 350,000
2 Dipong Tk. Kayu 6 100,000 600,000 600,000
3 Fahmi Kn 6 70,000 420,000 420,000
4 Verri Kn 5 70,000 350,000 350,000
5 Bengbeng Kn 5 70,000 350,000 350,000
6 Irwan Kn 6 70,000 420,000 420,000
7 Kembar Tk. Keramik 6 130,000 780,000 780,000
8 Riko Tk. Kayu 6 110,000 660,000 660,000
9 Arman Tk. Cat 6 95,000 570,000 570,000
10 Riadi Tk. Keramik 6 130,000 780,000 780,000
11 Sudar Kn 6 70,000 420,000 420,000
12 Alpin Kn 6 70,000 420,000 420,000
13 Angga Kn 5 70,000 350,000 350,000
14 Iwan Tk. Keramik 5 120,000 600,000 600,000
15 Sarul Tk. Kayu 3.5 105,000 367,500 367,500
16 Joko Kn 4.5 70,000 315,000 315,000
17 Darma Kn 5 70,000 350,000 350,000
18 Farhan Kn 6 70,000 420,000 420,000
19 Roni Kn 6 75,000 450,000 450,000
20 Anto Tk. Cat 6 100,000 600,000 600,000
21 Agun Kn 6 75,000 450,000 450,000
22 Likin Tk. Batu 6 100,000 600,000 600,000
23 Hoki Kn 6 70,000 420,000 420,000
24 Diki Tk. Air 6 110,000 660,000 660,000
25 Sandro Tk. Gypsum 5 115,000 575,000 575,000
26 Bindo Tk. Gypsum 6 115,000 690,000 690,000
27 Sarwo Tk. Batu 5 100,000 500,000 500,000
28 Surya Kn 1 70,000 70,000 70,000
29 Gito Tk. Kayu 6 110,000 660,000 660,000
30 Irsan Kn 6 70,000 420,000 420,000
31 Hendro Kn 6 70,000 420,000 420,000
32 Jefri Tk. Keramik 6 130,000 780,000 780,000
33 Cipto Tk. Las 6 80,000 480,000 480,000
34 Rizky Kn 5 70,000 350,000 350,000
35 Alex Kn 5 70,000 350,000 350,000

16,997,500 - - 16,997,500

Total Rp 16,997,500

Medan, 6 Maret 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 8 MARET 2021 S/D 13 MARET 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Fahmi Kn 6 70,000 420,000 420,000
2 Veri Kn 6 70,000 420,000 420,000
3 Dipong Tk. Kayu 5 100,000 500,000 500,000
4 Vijai Kn 5 70,000 350,000 350,000
5 Irsan Kn 6 70,000 420,000 420,000
6 Primus Kn 6 70,000 420,000 420,000
7 Agun Kn 6 75,000 450,000 450,000
8 Kembar Tk. Keramik 6 130,000 780,000 780,000
9 Bengbeng Kn 6 70,000 420,000 420,000
10 Irwan Kn 6 70,000 420,000 420,000
11 Bindo Tk. Gypsum 6 115,000 690,000 690,000
12 Riko Tk. Kayu 6 110,000 660,000 660,000
13 Sudar Kn 6 70,000 420,000 420,000
14 Riadi Tk. Keramik 6 130,000 780,000 780,000
15 Arman Tk. Cat 6 95,000 570,000 570,000
16 Darma Kn 6 70,000 420,000 420,000
17 Iwan Tk. Keramik 6 120,000 720,000 720,000
18 Angga Kn 5 70,000 350,000 350,000
19 Anto Tk. Cat 5 100,000 500,000 500,000
20 Diki Tk. Air 6 110,000 660,000 660,000
21 Farhan Kn 6 70,000 420,000 420,000
22 Roni Kn 6 75,000 450,000 450,000
23 Alex Kn 6 70,000 420,000 420,000
24 Hendro Kn 6 70,000 420,000 420,000
25 Gito Tk. Kayu 5 110,000 550,000 550,000
26 Jefri Tk. Keramik 6 130,000 780,000 780,000
27 Sarwo Tk. Batu 6 100,000 600,000 600,000
28 Labung Kn 6 70,000 420,000 420,000
29 Likin Tk. Batu 5 100,000 500,000 500,000
30 Tanjung Kn 4 70,000 280,000 280,000
31 Sarul Tk. Kayu 6 105,000 630,000 630,000
32 Yetno Tk. Melamin 3 100,000 300,000 300,000
33 Alpin Kn 3 70,000 210,000 210,000
- -
- -

16,350,000 - - 16,350,000

Total Rp 16,350,000

Medan, 13 Maret 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 15 MARET 2021 S/D 20 MARET 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Ijul Tk. Kayu 6 100,000 600,000 600,000
2 Bengbeng Kn 6 70,000 420,000 420,000
3 Irwan Kn 6 70,000 420,000 420,000
4 Sarul Tk. Kayu 6 105,000 630,000 630,000
5 Tanjung Kn 6 70,000 420,000 420,000
6 Fahmi Kn 6 70,000 420,000 420,000
7 Yogi Kn 6 70,000 420,000 420,000
8 Dipong Tk. Kayu 6 100,000 600,000 600,000
9 Sulaiman Tk. Kayu 6 100,000 600,000 600,000
10 Riko Tk. Kayu 6 110,000 660,000 660,000
11 Irsan Kn 6 70,000 420,000 420,000
12 Primus Kn 5 70,000 350,000 350,000
13 Agun Kn 6 75,000 450,000 450,000
14 Andi Tk, listrik 5.5 130,000 715,000 715,000
15 Sudar Kn 3 70,000 210,000 210,000
16 Alpin Kn 6 70,000 420,000 420,000
17 Arman Tk. Cat 6 95,000 570,000 570,000
18 Darma Kn 6 70,000 420,000 420,000
19 Riadi Tk. Keramik 6 130,000 780,000 780,000
20 Ilham Kn 6 70,000 420,000 420,000
21 Bindo Tk. Gypsum 6 115,000 690,000 690,000
22 Anto Tk. Cat 6 100,000 600,000 600,000
23 Diki Tk. Air 5.5 110,000 605,000 605,000
24 Sarwo Tk. Batu 6 100,000 600,000 600,000
25 Lawong Kn 6 70,000 420,000 420,000
26 Andri Kn 6 60,000 360,000 360,000
27 Gito Tk. Kayu 6 110,000 660,000 660,000
28 Alex Kn 5 70,000 350,000 350,000
29 Hendro Kn 6 70,000 420,000 420,000
30 Roni Kn 6 75,000 450,000 450,000
31 Farhan Kn 6 70,000 420,000 420,000
32 Likin Tk.Batu 6 100,000 600,000 600,000
33 Kembar Tk. Keramik 5 130,000 650,000 650,000
34 Vijai Kn 5 70,000 350,000 350,000
35 Iwan Tk. Keramik 5 120,000 600,000 600,000
36 Angga Kn 5 70,000 350,000 350,000
37 Gugun Kn 5 70,000 350,000 350,000
38 Misnan Tk. Kayu 5 100,000 500,000 500,000
39 Hamdan Tk. Kayu 5 100,000 500,000 500,000
40 Jefri Tk. Keramik 5 130,000 650,000 650,000
41 Yetno Tk. Melamin 4 100,000 400,000 400,000

20,470,000 - - 20,470,000

Total Rp 20,470,000

Medan, 20 Maret 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 22 MARET 2021 S/D 27 MARET 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Vijai Kn 6 70,000 420,000 420,000
2 Reja Kn 6 70,000 420,000 420,000
3 Sarul Tk. Kayu 5 105,000 525,000 525,000
4 Doyok Kn 5 70,000 350,000 350,000
5 Agun Kn 6 75,000 450,000 450,000
6 Irsan Kn 6 70,000 420,000 420,000
7 Riko Tk. Kayu 6 110,000 660,000 660,000
8 Fahmi Kn 1 70,000 70,000 70,000
9 Yogi Kn 6 70,000 420,000 420,000
10 Kembar Tk. Keramik 6 130,000 780,000 780,000
11 Priadi Tk. Keramik 6 130,000 780,000 780,000
12 Arman Tk. Cat 6 95,000 570,000 570,000
13 Iwan Tk. Keramik 6 120,000 720,000 720,000
14 Angga Kn 6 70,000 420,000 420,000
15 Anto Tk. Cat 6 100,000 600,000 600,000
16 Primus Kn 5 70,000 350,000 350,000
17 Gugun Kn 5 70,000 350,000 350,000
18 Bengbeng Kn 5 70,000 350,000 350,000
19 Irwan Kn 6 70,000 420,000 420,000
20 Likin Tk. Batu 6 100,000 600,000 600,000
21 Alpin Kn 6 70,000 420,000 420,000
22 Alex Kn 6 70,000 420,000 420,000
23 Roni Kn 6 75,000 450,000 450,000
24 Farhan Kn 6 70,000 420,000 420,000
25 Diki Tk. Air 6 110,000 660,000 660,000
26 Sandro Tk. Gypsum 6 115,000 690,000 690,000
27 Bindo Tk. Gypsum 6 115,000 690,000 690,000
28 Hendro Kn 6 70,000 420,000 420,000
29 Yetno Tk. Melamin 1 100,000 100,000 100,000
30 Jefri Tk. Keramik 6 130,000 780,000 780,000
31 Gito Tk. Kayu 6 110,000 660,000 660,000
32 Darma Kn 5 70,000 350,000 350,000
33 Sarwo Tk. Batu 5 100,000 500,000 500,000
34 Rendi Kn 4 70,000 280,000 280,000
35 Kristo Kn 4 70,000 280,000 280,000
- -

16,795,000 - - 16,795,000

Total Rp 16,795,000

Medan, 27 Maret 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 29 MARET 2021 S/D 3 APRIL 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Kristi Kn 6 70,000 420,000 420,000
2 Vijai Kn 6 70,000 420,000 420,000
3 Reja Kn 6 70,000 420,000 420,000
4 Yogi Kn 6 70,000 420,000 420,000
5 Rendi Kn 6 70,000 420,000 420,000
6 Irsan Kn 6 70,000 420,000 420,000
7 Primus Kn 6 70,000 420,000 420,000
8 Priadi Tk. Keramik 6 130,000 780,000 780,000
9 Kembar Tk. Keramik 6 130,000 780,000 780,000
10 Riko Tk. Kayu 6 110,000 660,000 660,000
11 Agun Kn 6 75,000 450,000 450,000
12 Anto Tk. Cat 6 100,000 600,000 600,000
13 Iwan Tk. Keramik 4 120,000 480,000 480,000
14 Angga Kn 5 70,000 350,000 350,000
15 Arman Tk. Cat 6 95,000 570,000 570,000
16 Irwan Kn 6 70,000 420,000 420,000
17 Diki Tk. Air 6 110,000 660,000 660,000
18 Bengbeng Kn 6 70,000 420,000 420,000
19 Likin Tk. Batu 6 100,000 600,000 600,000
20 Sandro Tk. Gypsum 5 115,000 575,000 575,000
21 Bindo Tk. Gypsum 4 115,000 460,000 460,000
22 Alpin Kn 6 70,000 420,000 420,000
23 Alex Kn 6 70,000 420,000 420,000
24 Farhan Kn 6 70,000 420,000 420,000
25 Fadil Kn 6 70,000 420,000 420,000
26 Roni Kn 6 75,000 450,000 450,000
27 Hendro Kn 5 70,000 350,000 350,000
28 Gito Tk. Kayu 6 110,000 660,000 660,000
29 Darma Kn 6 70,000 420,000 420,000
30 Sarwo Tk. Batu 5 100,000 500,000 500,000
31 Jefri Tk. Keramik 6 130,000 780,000 780,000
32 Sarul Tk. Kayu 4 105,000 420,000 420,000
33 Doyok Kn 4 70,000 280,000 280,000
34 Gugun Kn 5 70,000 350,000 350,000
35 Yetno Tk. Melamin 5 100,000 500,000 500,000
36 Juni Tk. Batu 1 100,000 100,000 100,000
37 Udin Tk. Batu 2 100,000 200,000 200,000
38 Viktor Kn 1 70,000 70,000 70,000
39 Adit Kn 2 70,000 140,000 140,000

17,645,000 - - 17,645,000

Total Rp 17,645,000

Medan, 3 April 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 5 APRIL 2021 S/D 10 APRIL 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Kembar Tk. Keramik 6 130,000 780,000 780,000
2 Vijai Kn 6 70,000 420,000 420,000
3 Reja Kn 5 70,000 350,000 350,000
4 Yogi Kn 6 70,000 420,000 420,000
5 Rendi Kn 6 70,000 420,000 420,000
6 Kristi Kn 6 70,000 420,000 420,000
7 Agun Kn 6 75,000 450,000 450,000
8 Arman Tk. Cat 6 95,000 570,000 570,000
9 Iwan Tk. Keramik 6 120,000 720,000 720,000
10 Angga Kn 6 70,000 420,000 420,000
11 Bengbeng Kn 6 70,000 420,000 420,000
12 Irsan Kn 6 70,000 420,000 420,000
13 Primus Kn 3 70,000 210,000 210,000
14 Riko Tk. Kayu 4 110,000 440,000 440,000
15 Darma Kn 5.5 70,000 385,000 385,000
16 Anto Tk. Cat 6 100,000 600,000 600,000
17 Irwan Kn 6 70,000 420,000 420,000
18 Gito Tk. Kayu 6 110,000 660,000 660,000
19 Sarul Tk. Kayu 5.5 105,000 577,500 577,500
20 Adit Kn 5.5 70,000 385,000 385,000
21 Diki Tk. Air 6 110,000 660,000 660,000
22 Bindo Tk. Gypsum 6 115,000 690,000 690,000
23 Sandro Tk. Gypsum 6 115,000 690,000 690,000
24 Roni Kn 6 75,000 450,000 450,000
25 Likin Tk. Batu 6 100,000 600,000 600,000
26 Yetno Tk. Melamin 6 100,000 600,000 600,000
27 Jefri Tk. Keramik 6 130,000 780,000 780,000
28 Fadil Kn 5 70,000 350,000 350,000
29 Hendro Kn 6 70,000 420,000 420,000
30 Sarwo Tk. Batu 6 100,000 600,000 600,000
31 Alex Kn 4 70,000 280,000 280,000
32 Liman Tk. Batu 5 100,000 500,000 500,000
33 Udin Tk. Batu 5 100,000 500,000 500,000
34 Tanjung Kn 5 70,000 350,000 350,000
35 Priadi Tk. Keramik 4 130,000 520,000 520,000
36 Alpin Kn 4 70,000 280,000 280,000
37 Farhan Kn 4 70,000 280,000 280,000

18,037,500 - - 18,037,500

Total Rp 18,037,500

Medan, 10 April 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 12 APRIL 2021 S/D 17 APRIL 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Vijai Kn 5 70,000 350,000 350,000
2 Dendi Kn 5 70,000 350,000 350,000
3 Reja Kn 5 70,000 350,000 350,000
4 Danda Kn 5 70,000 350,000 350,000
5 Kembar Tk. Keramik 6 130,000 780,000 780,000
6 Yogi Kn 6 70,000 420,000 420,000
7 Rendi Kn 5 70,000 350,000 350,000
8 Priadi Tk. Keramik 6 130,000 780,000 780,000
9 Arman Tk. Cat 5 95,000 475,000 475,000
10 Kristi Kn 4 70,000 280,000 280,000
11 Iwan Tk. Keramik 5 120,000 600,000 600,000
12 Ilham Kn 5 70,000 350,000 350,000
13 Anto Tk. Cat 5 100,000 500,000 500,000
14 Bengbeng Kn 5 70,000 350,000 350,000
15 Agun Kn 5 75,000 375,000 375,000
16 Irsan Kn 5 70,000 350,000 350,000
17 Darma Kn 6 70,000 420,000 420,000
18 Farhan Kn 5 70,000 350,000 350,000
19 Fadil Kn 4 70,000 280,000 280,000
20 Alex Kn 6 70,000 420,000 420,000
21 Alpin Kn 5 70,000 350,000 350,000
22 Roni Kn 5 75,000 375,000 375,000
23 Diki Tk. Air 6 110,000 660,000 660,000
24 Gito Tk. Kayu 6 110,000 660,000 660,000
25 Yetno Tk. Melamin 5 100,000 500,000 500,000
26 Likin Tk. Batu 5 100,000 500,000 500,000
27 Sarwo Tk. Batu 4 100,000 400,000 400,000
28 Liman Tk. Batu 5 100,000 500,000 500,000
29 Bindo Tk. Gypsum 6 115,000 690,000 690,000
30 Sandro Tk. Gypsum 6 115,000 690,000 690,000
31 Hendra Kn 6 70,000 420,000 420,000
32 Jefri Tk. Keramik 5 130,000 650,000 650,000
33 Sarul Tk. Kayu 4 105,000 420,000 420,000
34 Adit Kn 4 70,000 280,000 280,000
35 Andi Tk. Listrik 4 130,000 520,000 520,000
36 Angga Kn 4 70,000 280,000 280,000
37 Irwan Kn 4 70,000 280,000 280,000
38 Tanjung Kn 3 70,000 210,000 210,000

16,865,000 - - 16,865,000

Total Rp 16,865,000

Medan, 17 April 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 19 APRIL 2021 S/D 24 APRIL 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Reza Kn 6 70,000 420,000 420,000
2 Danda Kn 6 70,000 420,000 420,000
3 Vijai Kn 5.5 70,000 385,000 385,000
4 Dandi Kn 6 70,000 420,000 420,000
5 Kembar Tk. Keramik 6 130,000 780,000 780,000
6 Irsan Kn 6 70,000 420,000 420,000
7 Yogi Kn 6 70,000 420,000 420,000
8 Rendi Kn 6 70,000 420,000 420,000
9 Priadi Tk. Keramik 6 130,000 780,000 780,000
10 Arman Tk. Cat 6 95,000 570,000 570,000
11 Yetno Tk. Melanin 6 100,000 600,000 600,000
12 Gito Tk. Kayu 6 110,000 660,000 660,000
13 Dino Kn 6 70,000 420,000 420,000
14 Sarul Tk. Kayu 6 105,000 630,000 630,000
15 Adit Kn 6 70,000 420,000 420,000
16 Roni Kn 6 75,000 450,000 85,000 kerja ruang HD RSUBK 535,000
17 Farhan Kn 6 70,000 420,000 80,000 kerja ruang HD RSUBK 500,000
18 Anto Tk. Cat 5 100,000 500,000 500,000
19 Alex Kn 5 70,000 350,000 350,000
20 Bengbeng Kn 6 70,000 420,000 420,000
21 Tomo Kn 6 70,000 420,000 420,000
22 Agun Kn 6 75,000 450,000 450,000
23 Ilham Kn 1 70,000 70,000 70,000
24 Likin Tk. Batu 6 100,000 600,000 600,000
25 Andi Tk. Listrik 3 130,000 390,000 390,000
26 Diki Tk. Air 5 110,000 550,000 120,000 kerja ruang HD RSUBK 670,000
27 Hendro Kn 6 70,000 420,000 420,000
28 Darma Kn 6 70,000 420,000 420,000
29 Bindo Tk. Gypsum 5.5 115,000 632,500 632,500
30 Sandro Tk. Gypsum 6 115,000 690,000 690,000
31 Liman Tk. Batu 6 100,000 600,000 600,000
32 Sugio Tk. Batu 6 100,000 600,000 600,000
33 Sarwo Tk. Batu 5 100,000 500,000 500,000
34 Jefri Tk. Keramik 6 130,000 780,000 780,000
35 Primus Kn 5 70,000 350,000 350,000
36 Kian Tk. Keramik 6 130,000 780,000 140,000 kerja ruang HD RSUBK 920,000
37 Tanjung Kn 5 70,000 350,000 350,000
38 Angga Kn 5 70,000 350,000 350,000
39 Riko Tk. Kayu 4 110,000 440,000 440,000
40 Kristin Kn 4 70,000 280,000 280,000

19,577,500 425,000 - 20,002,500

Total Rp 20,002,500

Medan, 24 April 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 26 APRIL 2021 S/D 1 Mei 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Reza Kn 6 70,000 420,000 420,000
2 Danda Kn 2 70,000 140,000 140,000
3 Vijai Kn 6 70,000 420,000 420,000
4 Dandi Kn 2 70,000 140,000 140,000
5 Kembar Tk. Keramik 2.5 130,000 325,000 325,000
6 Priadi Tk. Keramik 6 130,000 780,000 780,000
7 Yogi Kn 2.5 70,000 175,000 175,000
8 Irsan Kn 6 70,000 420,000 420,000
9 Arman Tk. Cat 6 95,000 570,000 570,000
10 Riko Tk. Kayu 6 110,000 660,000 660,000
11 Likin Tk. Tk. Batu 6 100,000 600,000 110,000 plaster bobokan pintu HD RSUBK 710,000
12 Kristi Kn 5 70,000 350,000 350,000
13 Darma Kn 6 70,000 420,000 420,000
14 Primus Kn 6 70,000 420,000 420,000
15 Andi Tk. Listrik 3 130,000 390,000 390,000
16 Deni Kn 6 70,000 420,000 420,000
17 Yetno Tk. Melamin 6 100,000 600,000 600,000
18 Roni Kn 6 75,000 450,000 85,000 plaster bobokan pintu HD RSUBK 535,000
19 Farhan Kn 6 70,000 420,000 420,000
20 Jefri Tk, Keramik 6 130,000 780,000 780,000
21 Hendro Kn 6 70,000 420,000 420,000
22 Liman Tk. Batu 6 100,000 600,000 600,000
23 Sarwo Tk. Batu 6 100,000 600,000 600,000
24 Sandro Tk. Gypsum 4 115,000 460,000 460,000
25 Bindo Tk. Gypsum 4.5 115,000 517,500 517,500
26 Bengbeng Kn 4 70,000 280,000 280,000
27 Tomo Kn 3 70,000 210,000 210,000
28 Sarul Tk. Kayu 3 105,000 315,000 315,000
29 Tanjung Kn 5 70,000 350,000 350,000
30 Anto Tk. Cat 1 100,000 100,000 100,000
31 Namek Tk. Batu 4 100,000 400,000 400,000
32 Adit Kn 4 70,000 280,000 280,000
33 Rendi Kn 3 70,000 210,000 210,000

13,642,500 195,000 - 13,837,500

Total Rp 13,837,500

Medan, 1 Mei 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (Ari Surbakti) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 3 MEI 2021 S/D 8 MEI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Reja Kn 6 70,000 420,000 420,000
2 Vijai Kn 6 70,000 420,000 420,000
3 Kembar Tk. Keramik 5 130,000 650,000 650,000
4 Farel Tk. Batu 6 100,000 600,000 600,000
5 Priadi Tk. Keramik 6 130,000 780,000 780,000
6 Rendi Kn 6 70,000 420,000 420,000
7 Riko Tk.Kayu 6 110,000 660,000 660,000
8 Yetno Tk. Melamin 6 100,000 600,000 600,000
9 Arman Tk. Cat 6 95,000 570,000 570,000
10 Primus Kn 6 70,000 420,000 420,000
11 Deni Kn 6 70,000 420,000 420,000
12 Bilal Tk. Batu 6 100,000 600,000 600,000
13 Adit Kn 6 70,000 420,000 420,000
14 Gito Tk. Kayu 6 110,000 660,000 660,000
15 Likin Tk. Batu 6 100,000 600,000 600,000
16 Liman Tk. Batu 4 100,000 400,000 400,000
17 Sarwo Tk. Batu 6 100,000 600,000 600,000
18 Hendro Kn 5 70,000 350,000 350,000
19 Andi Tk. Listrik 6 130,000 780,000 780,000
20 Rahman Kn 6 70,000 420,000 420,000
21 Jepri Tk. Keramik 6 130,000 780,000 780,000
22 Tanjung Kn 5 70,000 350,000 350,000
23 Anto Tk. Cat 4 100,000 400,000 400,000

12,320,000 - - 12,320,000

Total Rp 12,320,000

Medan, 8 Mei 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (Ari Surbakti) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 10 MEI 2021 S/D 12 MEI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Reza Kn 3 70,000 210,000 210,000
2 Vijai Kn 3 70,000 210,000 210,000
3 Priadi Tk. Keramik 3 130,000 390,000 390,000
4 Kembar Tk. Keramik 3 130,000 390,000 390,000
5 Farel Tk. Batu 3 100,000 300,000 300,000
6 Deni Kn 3 70,000 210,000 210,000
7 Primus Kn 3 70,000 210,000 210,000
8 Irsan Kn 3 70,000 210,000 210,000
9 Arman Tk. Cat 3 95,000 285,000 285,000
10 Riko Tk. Kayu 3 110,000 330,000 330,000
11 Yogi Kn 3 70,000 210,000 210,000
12 Rendi Kn 3 70,000 210,000 210,000
13 Agun Kn 3 75,000 225,000 225,000
14 Angga Kn 3 70,000 210,000 210,000
15 Yetno Tk. Melamin 3 100,000 300,000 300,000
16 Diki Tk. Air 3 110,000 330,000 330,000
17 Likin Tk. Batu 3 100,000 300,000 300,000
18 Anto Tk. Cat 3 100,000 300,000 300,000
19 Kian Tk. Keramik 3 130,000 390,000 390,000
20 Sarul Tk. Kayu 3 105,000 315,000 315,000
21 Bilal Tk. Batu 3 100,000 300,000 300,000
22 Gito Tk. Kayu 3 110,000 330,000 330,000
23 Liman Tk. Batu 3 100,000 300,000 300,000
24 Sarwo Tk. Batu 3 100,000 300,000 300,000
25 Sandro Tk. Gypsum 3 115,000 345,000 345,000
26 Bindo Tk. Gypsum 3 115,000 345,000 345,000
27 Darman Kn 3 70,000 210,000 210,000
28 Andi Tk. Listrik 3 130,000 390,000 16,000 tgl 10/5 pulang jam 16 374,000
29 Rahmat Kn 3 70,000 210,000 210,000
30 Jepri Tk. Keramik 3 130,000 390,000 390,000
31 Hendro Kn 3 70,000 210,000 210,000
32 Adit Kn 2 70,000 140,000 140,000
33 Tanjung Kn 1 70,000 70,000 70,000

9,075,000 - 16,000 9,059,000

Total Rp 9,059,000

Medan, 12 Mei 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 17 MEI 2021 S/D 22 MEI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Primus Kn 6 70,000 420,000 420,000
2 Deni Kn 6 70,000 420,000 420,000
3 Kembar Tk. Keramik 6 130,000 780,000 780,000
4 Farel Tk. Batu 6 100,000 600,000 600,000
5 Irsan Kn 6 70,000 420,000 420,000
6 Arman Tk. Cat 6 95,000 570,000 570,000
7 Rendi Kn 5 70,000 350,000 350,000
8 Kian Tk. Keramik 6 130,000 780,000 780,000
9 Darma Kn 6 70,000 420,000 420,000
10 Anto Tk. Cat 6 100,000 600,000 600,000
11 Riko Tk. Kayu 6 110,000 660,000 660,000
12 Agun Kn 6 75,000 450,000 450,000
13 Farhan Kn 6 70,000 420,000 420,000
14 Gito Tk. Kayu 6 110,000 660,000 660,000
15 Sarwo Tk. Batu 6 100,000 600,000 600,000
16 Andi Tk. Listrik 5.5 130,000 715,000 715,000
17 Rahmad Kn 6 70,000 420,000 420,000
18 Diki Tk. Air 6 110,000 660,000 660,000
19 Roni Kn 6 75,000 450,000 450,000
20 Vijai Kn 4 70,000 280,000 280,000
21 Wak Roni Kn 6 70,000 420,000 420,000
22 Likin Tk. Batu 5 100,000 500,000 500,000
23 Tomo Kn 6 70,000 420,000 420,000
24 Jefri Tk. Keramik 6 130,000 780,000 780,000
25 Priadi Tk. Keramik 5 130,000 650,000 650,000
26 Tanjung Kn 3.5 70,000 245,000 245,000
27 Bengbeng Kn 4 70,000 280,000 280,000
28 Angga Kn 5 70,000 350,000 350,000
29 Reza Kn 5 70,000 350,000 350,000
30 Yetno Tk. Melamin 5 100,000 500,000 500,000
31 Sandro Tk. Gypsum 5 115,000 575,000 575,000
32 Bindo Tk. Gypsum 1.5 115,000 172,500 172,500
33 Hendro Kn 5 70,000 350,000 350,000
34 Ruli Kn 5 70,000 350,000 350,000
35 Dian Tk. Batu 2 100,000 200,000 200,000
36 Nasir Kn 3 70,000 210,000 210,000
37 Ilham Tk. Listrik 2 90,000 180,000 180,000

17,207,500 - - 17,207,500

Total Rp 17,207,500

Medan, 22 Mei 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 24 MEI 2021 S/D 29 MEI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Kembar Tk. Keramik 6 130,000 780,000 780,000
2 Deni Kn 6 70,000 420,000 420,000
3 Vijai Kn 6 70,000 420,000 420,000
4 Reza Kn 6 70,000 420,000 420,000
5 Farel Tk. Batu 6 100,000 600,000 600,000
6 Nasir Kn 6 70,000 420,000 420,000
7 Irsan Kn 6 70,000 420,000 420,000
8 Agun Kn 6 75,000 450,000 450,000
9 Angga Kn 6 70,000 420,000 420,000
10 Priadi Tk. Keramik 6 130,000 780,000 780,000
11 Diki Tk. Air 6 110,000 660,000 660,000
12 Arman Tk. Cat 6 95,000 570,000 570,000
13 Ilham Tk. Listrik 5 90,000 450,000 450,000
14 Andi Tk. Listrik 5 130,000 650,000 650,000
15 Rahmad Kn 4 70,000 280,000 280,000
16 Gito Tk. Kayu 6 110,000 660,000 660,000
17 Anto Tk. Cat 6 100,000 600,000 600,000
18 Bengbeng Kn 6 70,000 420,000 420,000
19 Kian Tk. Keramik 6 130,000 780,000 780,000
20 Dian Tk. Batu 1 100,000 100,000 100,000
21 Likin Tk. Batu 5 100,000 500,000 500,000
22 Riko Tk. Kayu 3 110,000 330,000 330,000
23 Roni Kn 1 75,000 75,000 75,000
24 Farhan Kn 1 70,000 70,000 70,000
25 Sandro Tk. Gypsum 6 115,000 690,000 690,000
26 Bindo Tk. Gypsum 5 115,000 575,000 575,000
27 Tanjung Kn 4 70,000 280,000 280,000
28 Darma Kn 6 70,000 420,000 420,000
29 Sarwo Tk. Batu 5 100,000 500,000 500,000
30 Jefri Tk. Keramik 6 130,000 780,000 780,000
31 Ruli Kn 6 70,000 420,000 420,000
32 Yetno Tk. Melamin 5 100,000 500,000 500,000
33 Hendro Kn 6 70,000 420,000 420,000
34 Wak Roni Kn 6 70,000 420,000 420,000
35 Primus Kn 5 70,000 350,000 350,000
36 Tomo Kn 3 70,000 210,000 210,000
16,840,000 - - 16,840,000

Total Rp 16,840,000

Medan, 29 Mei 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 31 MEI 2021 S/D 5 Juni 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Farel Tk. Batu 6 100,000 600,000 600,000
2 Danda Kn 6 70,000 420,000 420,000
3 Vijai Kn 6 70,000 420,000 420,000
4 Reza Kn 6 70,000 420,000 420,000
5 Kembar Tk. Keramik 6 130,000 780,000 780,000
6 Nasir Kn 6 70,000 420,000 420,000
7 Agun Kn 6 75,000 450,000 450,000
8 Angga Kn 6 70,000 420,000 420,000
9 Irsan Kn 6 70,000 420,000 420,000
10 Kian Tk. Keramik 6 130,000 780,000 780,000
11 Arman Tk. Cat 3 95,000 285,000 285,000
12 Priadi Tk. Keramik 6 130,000 780,000 780,000
13 Riko Tk. Kayu 6 110,000 660,000 660,000
14 Primus Kn 4.5 70,000 315,000 315,000
15 Andi Tk. Listrik 2 130,000 260,000 260,000
16 Rahmad Kn 3 70,000 210,000 210,000
17 Gito Tk. Kayu 5 110,000 550,000 550,000
18 Diki Tk. Air 6 110,000 660,000 15,000 pemasangan panel IM 675,000
19 Anto Tk. Cat 2 100,000 200,000 200,000
20 Ilham Tk. Listrik 4 90,000 360,000 360,000
21 Likin Tk. Batu 6 100,000 600,000 600,000
22 Bindo Tk. Gypsum 6 115,000 690,000 690,000
23 Darma Kn 6 70,000 420,000 420,000
24 Tomo Kn 6 70,000 420,000 15,000 pemasangan panel IM 435,000
25 Bengbeng Kn 2 70,000 140,000 15,000 pemasangan panel IM 155,000
26 Sarwo Tk. Batu 4 100,000 400,000 400,000
27 Jefri Tk. Keramik 6 130,000 780,000 780,000
28 Hendro Kn 5 70,000 350,000 350,000
29 Wak Roni Kn 5 70,000 350,000 350,000
30 Ruli Kn 6 70,000 420,000 15,000 pemasangan panel IM 435,000
31 Yetno Tk. Melamin 3 100,000 300,000 300,000
32 Dani S Tk. Listrik 5 90,000 450,000 450,000
33 Sandro Tk. Gypsum 5 115,000 575,000 575,000
- -
15,305,000 60,000 - 15,365,000

Total Rp 15,365,000

Medan, 5 Juni 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 7 Juni 2021 S/D 12 Juni 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Vijai Kn 6 70,000 420,000 420,000
2 Iwan Tk. Keramik 6 120,000 720,000 720,000
3 Farel Tk. Batu 6 100,000 600,000 600,000
4 Danda Kn 6 70,000 420,000 420,000
5 Agun Kn 6 75,000 450,000 450,000
6 Angga Kn 5 70,000 350,000 350,000
7 Kembar Tk. Keramik 6 130,000 780,000 780,000
8 Nasir Kn 6 70,000 420,000 420,000
9 Riko Tk. Batu 6 110,000 660,000 660,000
10 Ive Kn 6 70,000 420,000 420,000
11 Irsan Kn 4 70,000 280,000 280,000
12 Priadi Tk. Keramik 6 130,000 780,000 780,000
13 Ilham Tk. Listrik 6 90,000 540,000 540,000
14 Kian Tk. Listrik 6 130,000 780,000 780,000
15 Sarwo Tk. Batu 5 100,000 500,000 500,000
16 Primus Kn 6 70,000 420,000 420,000
17 Gito Tk. Kayu 6 110,000 660,000 660,000
18 Likin Tk. Batu 6 100,000 600,000 600,000
19 Darma Kn 6 75,000 450,000 450,000
20 Bengbeng Kn 6 70,000 420,000 420,000
21 Tomo Kn 6 70,000 420,000 420,000
22 Bindo Tk. Gypsum 5 115,000 575,000 575,000
23 Sandro Tk. Gypsum 5 115,000 575,000 575,000
24 Ruli Kn 6 70,000 420,000 420,000
25 Roni Kn 5 75,000 375,000 375,000
26 Farhan Kn 5 70,000 350,000 350,000
27 Wak Roni Kn 5 70,000 350,000 350,000
28 Reza Kn 5 70,000 350,000 350,000
29 Hendro Kn 4 70,000 280,000 280,000
- -
14,365,000 - - 14,365,000

Total Rp 14,365,000

Medan, 12 Juni 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 14 Juni 2021 S/D 19 Juni 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Kembar Tk. Keramik 6 130,000 780,000 780,000
2 Vijai Kn 6 70,000 420,000 420,000
3 Reja Kn 6 70,000 420,000 420,000
4 Iwan Tk. Keramik 6 120,000 720,000 720,000
5 Agun Kn 6 75,000 450,000 450,000
6 Angga Kn 6 70,000 420,000 420,000
7 Farel Tk. Batu 6 100,000 600,000 600,000
8 Danda Kn 6 70,000 420,000 420,000
9 Priadi Tk. Keramik 6 130,000 780,000 780,000
10 Kian Tk. Keramik 6 130,000 780,000 780,000
11 Riko Tk. Kayu 6 110,000 660,000 660,000
12 Ive Kn 6 70,000 420,000 420,000
13 Gito Tk. Kayu 5.5 110,000 605,000 605,000
14 Primus Kn 6 70,000 420,000 420,000
15 Ilham Tk. Listrik 5 90,000 450,000 450,000
16 Diki Tk. Air 6 110,000 660,000 660,000
17 Sarwo Tk. Batu 6 100,000 600,000 600,000
18 Likin Tk. Batu 5 100,000 500,000 500,000
19 Roni Kn 6 75,000 450,000 450,000
20 Farhan Kn 6 70,000 420,000 420,000
21 Wak Roni Kn 6 70,000 420,000 420,000
22 Hendro Kn 6 70,000 420,000 420,000
23 Darma Kn 6 75,000 450,000 450,000
24 Irsan Kn 4 70,000 280,000 280,000
25 Bindo Tk. Gypsum 6 115,000 690,000 690,000
26 Sandro Tk. Gypsum 4 115,000 460,000 460,000
27 Bengbeng Kn 6 70,000 420,000 420,000
28 Tomo Kn 6 70,000 420,000 420,000
29 Supri Tk. AC 5 70,000 350,000 350,000
30 Doni S Tk. Listrik 5 90,000 450,000 450,000
31 Nasir Kn 5 70,000 350,000 350,000
- -
15,685,000 - - 15,685,000

Total Rp 15,685,000

Medan, 19 Juni 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 21 JUNI 2021 S/D 26 JUNI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Vijai Kn 6 70,000 420,000 420,000
2 Reza Kn 6 70,000 420,000 420,000
3 Riko Tk. Kayu 6 110,000 660,000 660,000
4 Ive Kn 6 70,000 420,000 420,000
5 Farel Tk. Batu 6 110,000 660,000 660,000
6 Danda Kn 6 70,000 420,000 420,000
7 Darma Kn 6 75,000 450,000 450,000
8 Kembar Tk. Keramik 6 130,000 780,000 780,000
9 Agun Kn 6 75,000 450,000 450,000
10 Angga Kn 5 70,000 350,000 350,000
11 Kian Tk. Keramik 6 130,000 780,000 780,000
12 Priadi Tk. Keramik 6 130,000 780,000 780,000
13 Ilham Tk. Listrik 5.5 90,000 495,000 495,000
14 Gito Tk. Kayu 6 110,000 660,000 660,000
15 Primus Kn 6 70,000 420,000 420,000
16 Sarwo Tk. Batu 6 100,000 600,000 600,000
17 Roni Kn 6 75,000 450,000 450,000
18 Farhan Kn 6 70,000 420,000 420,000
19 Hendro Kn 6 70,000 420,000 420,000
20 Wak Roni Kn 5 70,000 350,000 350,000
21 Sando Tk. Gypsum 6 115,000 690,000 690,000
22 Bindo Tk. Gypsum 5 115,000 575,000 575,000
23 Tomo Kn 6 70,000 420,000 420,000
24 Bengbeng Kn 6 70,000 420,000 420,000
25 Likin Tk. Batu 5 100,000 500,000 500,000
26 Diki * Tk. Air 2 110,000 220,000 220,000
27 Iwan * Tk. Keramik 6 120,000 720,000 720,000
28 Nasir * Kn 6 70,000 420,000 420,000
29 Irsan * Kn 5 70,000 350,000 350,000
30 Anto * Tk. Cat 6 100,000 600,000 600,000
31 Rudi * Tk. Cat 6 105,000 630,000 630,000
- -
15,950,000 - - 15,950,000

Total Rp 15,950,000

Medan, 26 Juni 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 21 JUNI 2021 S/D 26 JUNI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Vijai Kn 6 70,000 420,000 420,000
2 Reza Kn 6 70,000 420,000 420,000
3 Riko Tk. Kayu 6 110,000 660,000 660,000
4 Ive Kn 6 70,000 420,000 420,000
5 Farel Tk. Batu 6 110,000 660,000 660,000
6 Danda Kn 6 70,000 420,000 420,000
7 Darma Kn 6 75,000 450,000 450,000
8 Kembar Tk. Keramik 6 130,000 780,000 780,000
9 Agun Kn 6 75,000 450,000 450,000
10 Angga Kn 5 70,000 350,000 350,000
11 Kian Tk. Keramik 6 130,000 780,000 780,000
12 Priadi Tk. Keramik 6 130,000 780,000 780,000
13 Ilham Tk. Listrik 5.5 90,000 495,000 495,000
14 Gito Tk. Kayu 6 110,000 660,000 660,000
15 Primus Kn 6 70,000 420,000 420,000
16 Sarwo Tk. Batu 6 100,000 600,000 600,000
17 Roni Kn 6 75,000 450,000 450,000
18 Farhan Kn 6 70,000 420,000 420,000
19 Hendro Kn 6 70,000 420,000 420,000
20 Wak Roni Kn 5 70,000 350,000 350,000
21 Sando Tk. Gypsum 6 115,000 690,000 690,000
22 Bindo Tk. Gypsum 5 115,000 575,000 575,000
23 Tomo Kn 6 70,000 420,000 420,000
24 Bengbeng Kn 6 70,000 420,000 420,000
25 Likin Tk. Batu 5 100,000 500,000 500,000
26 Diki Tk. Air 1 110,000 110,000 110,000
- -
13,120,000 - - 13,120,000

Total Rp 13,120,000

LAPORAN GAJI TUKANG DAN KENEK


PROYEK RSU KASIH INSANI
PERIODE TGL 21 JUNI 2021 S/D 26 JUNI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Diki Tk. Air 1 110,000 110,000 110,000
2 Iwan Tk. Keramik 6 120,000 720,000 720,000
3 Nasir Kn 6 70,000 420,000 420,000
4 Irsan Kn 5 70,000 350,000 350,000
5 Anto Tk. Cat 6 100,000 600,000 600,000
6 Rudi Tk. Cat 6 105,000 630,000 630,000

2,830,000 - - 2,830,000

Total Rp 2,830,000

Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (Ari Surbakti) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 28 JUNI 2021 S/D 3 JULI 2021
Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Kembar Tk. Keramik 6 130,000 780,000 780,000
2 Farel Tk. Batu 6 100,000 600,000 600,000
3 Danda Kn 5 70,000 350,000 350,000
4 Vijai Kn 6 70,000 420,000 420,000
5 Iwan Tk. Keramik 5 120,000 600,000 600,000
6 Nasir Kn 5 70,000 350,000 350,000
7 Kian Tk. Keramik 4 130,000 520,000 520,000
8 M, Salah Kn 6 70,000 420,000 420,000
9 Agun Kn 6 75,000 450,000 450,000
10 Angga Kn 5 70,000 350,000 350,000
11 Gito Tk. Kayu 6 110,000 660,000 660,000
12 Primus Kn 6 70,000 420,000 420,000
13 Ilham Tk. Listrik 5.5 90,000 495,000 495,000
14 Priadi Tk. Keramik 6 130,000 780,000 780,000
15 Darma Kn 6 75,000 450,000 450,000
16 Ive Kn 6 70,000 420,000 420,000
17 Riko Tk. Kayu 6 110,000 660,000 660,000
18 Likin Tk. Batu 6 100,000 600,000 600,000
19 Bembeng Kn 6 70,000 420,000 420,000
20 Farhan Kn 6 70,000 420,000 420,000
21 Tomo Kn 6 70,000 420,000 420,000
22 Roni Kn 6 75,000 450,000 450,000
23 Wak Roni Kn 6 70,000 420,000 420,000
24 Hendro Kn 4 70,000 280,000 280,000
25 Irsan Kn 5 70,000 350,000 350,000
26 Masnur Kn 5 70,000 350,000 350,000
27 Sarwo Tk. Batu 5 100,000 500,000 500,000
28 Imam Kn 5 70,000 350,000 350,000
29 Sandro Tk. Gypsum 5 115,000 575,000 575,000
30 Bindo Tk. Gypsum 5 115,000 575,000 575,000
31 Reza Kn 5 70,000 350,000 350,000
32 Diki Tk. Air 4 110,000 440,000 440,000
33 Supriadi Tk. Keramik 3 120,000 360,000 360,000
15,585,000 - - 15,585,000

Total Rp 15,585,000
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH INSANI
PERIODE TGL 28 JUNI 2021 S/D 3 JULI 2021
Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Anto Tk. Cat 4 100,000 400,000 400,000
2 Rudi Tk. Cat 6 105,000 630,000 630,000
3 Iwan Tk. Keramik 1 120,000 120,000 120,000
4 Nasir Kn 1 70,000 70,000 70,000
5 Irsan Kn 1 70,000 70,000 70,000

1,290,000 - - 1,290,000

Total Rp 1,290,000
Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (Ari Surbakti) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 5 JULI 2021 S/D 10 JULI 2021
Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Iwan Tk. Keramik 6 120,000 720,000 720,000
2 Vijai Kn 6 70,000 420,000 420,000
3 Kembar Tk. Keramik 6 130,000 780,000 780,000
4 Reja Kn 6 70,000 420,000 420,000
5 Nasir Kn 6 70,000 420,000 420,000
6 Priadi Tk. Keramik 6 130,000 780,000 780,000
7 Farel Tk. Batu 6 100,000 600,000 600,000
8 Danda Kn 6 70,000 420,000 420,000
9 M. Salah Kn 6 70,000 420,000 420,000
10 Riko Tk. Kayu 5 110,000 550,000 550,000
11 Ive Kn 6 70,000 420,000 420,000
12 Masnur Kn 6 70,000 420,000 420,000
13 Angga Kn 6 70,000 420,000 420,000
14 Agun Kn 6 75,000 450,000 450,000
15 Kian Tk. Keramik 6 130,000 780,000 780,000
16 Irsan Kn 6 70,000 420,000 420,000
17 Wak. Roni Kn 5 70,000 350,000 350,000
18 Roni Kn 6 75,000 450,000 450,000
19 Darma Kn 6 75,000 450,000 450,000
20 Harianto Tk. Resin 6 100,000 600,000 600,000
21 Nanda Kn 6 70,000 420,000 420,000
22 Diki Tk. Air 6 110,000 660,000 660,000
23 Primus Kn 6 70,000 420,000 420,000
24 Gito Tk. Kayu 6 110,000 660,000 660,000
25 Sarwo Tk. Batu 6 100,000 600,000 600,000
26 Likin Tk. Batu 6 100,000 600,000 600,000
27 Sandro Tk. Gypsum 6 115,000 690,000 690,000
28 Bindo Tk. Gypsum 6 115,000 690,000 690,000
29 Supriadi Tk. Keramik 5 120,000 600,000 600,000
30 Tomo Kn 6 70,000 420,000 420,000
31 Bembeng Kn 6 70,000 420,000 420,000
32 Hendro Kn 6 70,000 420,000 420,000
33 Ilham Tk. Listrik 4 90,000 360,000 360,000
34 Imam Kn 5 70,000 350,000 350,000
35 Farhan Kn 3 70,000 210,000 210,000
- -
17,810,000 - - 17,810,000

Total Rp 17,810,000

LAPORAN GAJI TUKANG DAN KENEK


PROYEK RSU KASIH INSANI
PERIODE TGL 5 JULI 2021 S/D 10 JULI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Anto Tk. Cat 6 100,000 600,000 600,000
2 Rudi Tk. Cat 6 105,000 630,000 630,000

1,230,000 - - 1,230,000
Total Rp 1,230,000
Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (Ari) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 12 JULI 2021 S/D 17 JULI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Priadi Tk. Keramik 6 130,000 780,000 780,000
2 Riko Tk. Kayu 6 110,000 660,000 660,000
3 Ive Kn 6 70,000 420,000 420,000
4 Kian Tk. Keramik 6 130,000 780,000 780,000
5 Vijai Kn 6 70,000 420,000 420,000
6 Reza Kn 6 70,000 420,000 420,000
7 Kembar Tk. Keramik 6 130,000 780,000 780,000
8 Iwan Tk. Keramik 6 120,000 720,000 720,000
9 Farel Tk. Batu 6 100,000 600,000 600,000
10 Nasir Kn 6 70,000 420,000 420,000
11 Danda Kn 6 70,000 420,000 420,000
12 Hengki Kn 6 70,000 420,000 420,000
13 Agun Kn 6 75,000 450,000 450,000
14 Angga Kn 6 70,000 420,000 420,000
15 Ilham Tk. Listrik 6 90,000 540,000 540,000
16 Primus Kn 6 70,000 420,000 420,000
17 Gito Tk. Kayu 6 110,000 660,000 660,000
18 Diki Tk. Air 6 110,000 660,000 660,000
19 Sarwo Tk. Batu 6 100,000 600,000 600,000
20 Likin Tk. Batu 6 100,000 600,000 600,000
21 Tomo Kn 5 70,000 350,000 350,000
22 Bengbeng Kn 5 70,000 350,000 350,000
23 Sandro Tk. Gypsum 6 115,000 690,000 690,000
24 Bindo Tk. Gypsum 6 115,000 690,000 690,000
25 Hendro Kn 6 70,000 420,000 420,000
26 Roni Kn 6 75,000 450,000 450,000
27 Farhan Kn 6 70,000 420,000 420,000
28 Wak Roni Kn 6 70,000 420,000 420,000
29 Iman Kn 6 70,000 420,000 420,000
30 Irsan Kn 6 70,000 420,000 420,000
31 Masnur Kn 5 70,000 350,000 350,000
32 Harianto Tk. Resin 5 100,000 500,000 500,000
33 Nanda Kn 4 70,000 280,000 280,000
34 Supriadi Tk. Keramik 4 120,000 480,000 480,000
35 Darma Kn 4 75,000 300,000 300,000
- -
17,730,000 - - 17,730,000

Total Rp 17,730,000

Medan, 17 Juli 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 19 JULI 2021 S/D 24 JULI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Kembar Tk. Keramik 5 130,000 650,000 650,000
2 Agun Kn 5 75,000 375,000 375,000
3 Angga Kn 5 70,000 350,000 350,000
4 Priadi Tk. Keramik 4.5 130,000 585,000 585,000
5 Hengki Kn 5 70,000 350,000 350,000
6 Farel Tk. Batu 5 100,000 500,000 500,000
7 Danda Kn 5 70,000 350,000 350,000
8 Iwan Tk. Keramik 5 120,000 600,000 600,000
9 Nasir Kn 5 70,000 350,000 350,000
10 Masnur Kn 5 70,000 350,000 350,000
11 Kian Tk. Keramik 5 130,000 650,000 650,000
12 Harianto Tk. Resin 5 100,000 500,000 500,000
13 Nanda Kn 3 70,000 210,000 210,000
14 Riko Tk. Kayu 5 110,000 550,000 550,000
15 Iven Kn 5 70,000 350,000 350,000
16 Ilham Tk. Listrik 4 90,000 360,000 360,000
17 Wak Roni Kn 5 70,000 350,000 350,000
18 Farhan Kn 4 70,000 280,000 280,000
19 Diki Tk. Air 5 110,000 550,000 550,000
20 Darma Kn 5 75,000 375,000 375,000
21 Primus Kn 5 70,000 350,000 350,000
22 Gito Tk. Kayu 5 110,000 550,000 550,000
23 Likin Tk. Batu 5 100,000 500,000 500,000
24 Supriadi Tk. Keramik 5 120,000 600,000 600,000
25 Roni Kn 5 75,000 375,000 375,000
26 Irsan Kn 4 70,000 280,000 280,000
27 Iman Kn 2 70,000 140,000 140,000
28 Sarwo Tk. Batu 2 100,000 200,000 200,000
29 Sandro Tk. Gypsum 5 115,000 575,000 575,000
30 Bindu Tk. Gypsum 5 115,000 575,000 575,000
31 Tomo Kn 4 70,000 280,000 280,000
32 Bembeng Kn 5 70,000 350,000 350,000
33 Hendro Kn 5 70,000 350,000 350,000
34 Vijai Kn 4 70,000 280,000 280,000
35 Reza Kn 4 70,000 280,000 280,000
- -
14,320,000 - - 14,320,000

Total Rp 14,320,000

Medan, 24 Juli 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 26 JULI 2021 S/D 31 JULI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Danda Kn 6 70,000 420,000 420,000
2 Nasir Kn 6 70,000 420,000 420,000
3 Priadi Tk. Keramik 6 130,000 780,000 780,000
4 Kembar Tk. Keramik 6 130,000 780,000 780,000
5 Harianto Tk. Resin 6 105,000 630,000 630,000
6 Riko Tk. Kayu 6 110,000 660,000 660,000
7 Ive Kn 6 70,000 420,000 420,000
8 Rendi Kn 6 70,000 420,000 420,000
9 Kian Tk. Keramik 6 130,000 780,000 780,000
10 Agun Kn 6 75,000 450,000 450,000
11 Angga Kn 6 70,000 420,000 420,000
12 Hengki Kn 6 70,000 420,000 420,000
13 Masnur Kn 6 70,000 420,000 420,000
14 Ilham Tk. Listrik 6 90,000 540,000 540,000
15 Nanda Kn 6 70,000 420,000 420,000
16 Sandro Tk. Gypsum 6 115,000 690,000 690,000
17 Bindo Tk. Gypsum 6 115,000 690,000 690,000
18 Diki Tk. Air 6 110,000 660,000 660,000
19 Likin Tk. Batu 6 105,000 630,000 630,000
20 Sarwo Tk. Batu 5 105,000 525,000 525,000
21 Darma Kn 6 75,000 450,000 450,000
22 Tomo Kn 6 70,000 420,000 420,000
23 Bembeng Kn 6 70,000 420,000 420,000
24 Farhan Kn 3 70,000 210,000 210,000
25 Supriadi Tk. Keramik 6 120,000 720,000 720,000
26 Primus Kn 6 70,000 420,000 420,000
27 Irsan Kn 5 70,000 350,000 350,000
28 Gito Tk. Kayu 5 110,000 550,000 550,000
29 Hendro Kn 4 70,000 280,000 280,000
- -
14,995,000 - - 14,995,000

Total Rp 14,995,000

Medan, 31 Juli 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 2 AGUSTUS 2021 S/D 7 AGUSTUS 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Rendi Kn 5 70,000 350,000 350,000
2 Kembar Tk. Gypsum 6 130,000 780,000 780,000
3 Danda Kn 6 70,000 420,000 420,000
4 Harianto Tk. Resin 5 105,000 525,000 525,000
5 Priadi Tk. Keramik 6 130,000 780,000 780,000
6 Agun Kn 6 75,000 450,000 450,000
7 Kian Tk. Keramik 6 130,000 780,000 780,000
8 Ive Kn 6 70,000 420,000 420,000
9 Riko Tk. Kayu 6 110,000 660,000 660,000
10 Diki Tk. Air 6 110,000 660,000 660,000
11 Masnur Kn 5 70,000 350,000 350,000
12 Ilham Tk. Listrik 6 90,000 540,000 540,000
13 Gito Tk. Kayu 5 110,000 550,000 550,000
14 Irsan Kn 6 70,000 420,000 420,000
15 Sandro Tk. Gypsum 5 115,000 575,000 575,000
16 Bindo Tk. Gypsum 6 115,000 690,000 690,000
17 Darma Kn 6 75,000 450,000 450,000
18 Sarwo Tk. Batu 6 105,000 630,000 630,000
19 Likin Tk. Batu 6 105,000 630,000 630,000
20 Supriadi Tk. Keramik 6 120,000 720,000 720,000
21 Hendro Kn 6 70,000 420,000 420,000
22 Tomo Kn 6 70,000 420,000 420,000
23 Bembeng Kn 5 70,000 350,000 350,000
24 Angga Kn 6 70,000 420,000 420,000
25 Hengki Kn 6 70,000 420,000 420,000
26 Arman Tk. Cat 6 95,000 570,000 570,000
27 Rudi Tk. Cat 6 105,000 630,000 630,000
28 Nasir Kn 5 70,000 350,000 350,000
29 Roni Kn 6 75,000 450,000 450,000
- -
15,410,000 - - 15,410,000

Total Rp 15,410,000

Medan, 7 Agustus 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 9 AGUSTUS 2021 S/D 14 AGUSTUS 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Rendi Kn 4 70,000 280,000 280,000
2 Danda Kn 6 70,000 420,000 420,000
3 Kembar Tk. Keramik 6 130,000 780,000 780,000
4 Nasir Kn 6 70,000 420,000 420,000
5 Harianto Tk. Resin 6 105,000 630,000 630,000
6 Hengki Kn 6 70,000 420,000 420,000
7 Kian Tk. Keramik 6 130,000 780,000 780,000
8 Priadi Tk. Keramik 6 130,000 780,000 780,000
9 Arman Tk. Cat 6 95,000 570,000 570,000
10 Angga Kn 5 70,000 350,000 350,000
11 Agun Kn 6 75,000 450,000 450,000
12 Riko Tk. Kayu 2 110,000 220,000 220,000
13 Ive Kn 6 70,000 420,000 420,000
14 Irsan Kn 6 70,000 420,000 420,000
15 Masnur Kn 6 70,000 420,000 420,000
16 Darma Kn 6 75,000 450,000 450,000
17 Diki Tk. Air 6 110,000 660,000 660,000
18 Ilhan Tk. Listrik 5 90,000 450,000 450,000
19 Gito Tk. Kayu 2 110,000 220,000 220,000
20 Likin Tk. Batu 6 105,000 630,000 630,000
21 Rudi Tk. Cat 6 105,000 630,000 630,000
22 Bindu Tk. Gypsum 6 115,000 690,000 690,000
23 Sarwo Tk. Batu 6 115,000 690,000 690,000
24 Supriadi Tk. Keramik 5 120,000 600,000 600,000
25 Roni Kn 6 75,000 450,000 450,000
26 Bembeng Kn 3 70,000 210,000 210,000
27 Tomok Kn 3 70,000 210,000 210,000
28 Hendro Kn 5 70,000 350,000 350,000
29 Yordan S Tk. Listrik 4 90,000 360,000 360,000
30 Bagol Kn 3 70,000 210,000 210,000
31 Dian Kn 3 70,000 210,000 210,000
32 Jimmi Kn 3 70,000 210,000 210,000
- -
14,590,000 - - 14,590,000

Total Rp 14,590,000

Medan, 14 Agustus 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 16 AGUSTUS 2021 S/D 21 AGUSTUS 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Kembar Tk. Keramik 5 130,000 650,000 650,000
2 Kian Tk. Keramik 5 130,000 650,000 650,000
3 Danda Kn 5 70,000 350,000 350,000
4 Nasir Kn 5 70,000 350,000 350,000
5 Bagol Kn 5 70,000 350,000 350,000
6 Dian Kn 5 70,000 350,000 350,000
7 Priadi Tk. Keramik 2 130,000 260,000 260,000
8 Hengki Kn 5 70,000 350,000 350,000
9 Yordan Tk. Listrik 5 90,000 450,000 450,000
10 Jimmi Kn 5 70,000 350,000 350,000
11 Ilham Tk. Listrik 5 90,000 450,000 450,000
12 Harianto Tk. Resin 5 105,000 525,000 525,000
13 Agun Kn 5 75,000 375,000 375,000
14 Angga Kn 5 70,000 350,000 350,000
15 Masnur Kn 5 70,000 350,000 350,000
16 Arman Tk. Cat 5 95,000 475,000 475,000
17 Ive Kn 5 70,000 350,000 350,000
18 Sarwo Tk. Batu 5 105,000 525,000 525,000
19 Darma Kn 5 75,000 375,000 375,000
20 Rudi Tk. Cat 5 105,000 525,000 525,000
21 Bindu Tk. Gypsum 4 115,000 460,000 460,000
22 Irsan Kn 5 70,000 350,000 350,000
23 Likin Tk. Batu 5 105,000 525,000 525,000
24 Supriadi Tk. Keramik 4 120,000 480,000 480,000
25 Hendro Kn 4 70,000 280,000 280,000
26 Roni Kn 5 75,000 375,000 375,000
27 Rendi Kn 4 70,000 280,000 280,000
28 Diki Tk. Air 5 110,000 550,000 550,000
29 Tomo Kn 4 70,000 280,000 280,000
30 Bengbeng Kn 4 70,000 280,000 280,000
31 Sandro Tk. Gypsum 4 115,000 460,000 460,000
- -
12,730,000 - - 12,730,000

Total Rp 12,730,000

Medan, 21 Agustus 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 23 AGUSTUS 2021 S/D 28 AGUSTUS 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Rendi Kn 5 70,000 350,000 350,000
2 Yordan Tk. Listrik 6 90,000 540,000 540,000
3 Hengki Kn 6 70,000 420,000 420,000
4 Jimmi Kn 6 70,000 420,000 420,000
5 Darma Kn 6 75,000 450,000 450,000
6 Kembar Tk. Keramik 6 130,000 780,000 780,000
7 Nasir Kn 5 70,000 350,000 350,000
8 Danda Kn 6 70,000 420,000 420,000
9 Priadi Tk. Keramik 5 130,000 650,000 650,000
10 Harianto Tk. Resin 6 105,000 630,000 630,000
11 Kian Tk. Keramik 6 130,000 780,000 780,000
12 Agun Kn 6 75,000 450,000 450,000
13 Angga Kn 6 70,000 420,000 420,000
14 Dian Kn 6 70,000 420,000 420,000
15 Bagol Kn 6 70,000 420,000 420,000
16 Masnur Kn 5 70,000 350,000 350,000
17 Arman Tk. Cat 6 95,000 570,000 570,000
18 Ilham Tk. Listrik 5 90,000 450,000 450,000
19 Diki Tk. Air 6 115,000 690,000 690,000
20 Irsan Kn 6 70,000 420,000 420,000
21 Rudi Tk. Cat 6 105,000 630,000 630,000
22 Sandro Tk. Gypsum 4 115,000 460,000 460,000
23 Bindu Tk. Gypsum 6 115,000 690,000 690,000
24 Sarwo Tk. Batu 6 105,000 630,000 630,000
25 Likin Tk. Batu 6 105,000 630,000 630,000
26 Supriadi Tk. Keramik 6 120,000 720,000 720,000
27 Hendro Kn 6 70,000 420,000 420,000
28 Roni Kn 6 75,000 450,000 450,000
29 Bengbeng Kn 5 70,000 350,000 350,000
30 Ive Kn 5 70,000 350,000 350,000
31 Tomo Kn 5 70,000 350,000 350,000
- -
15,660,000 - - 15,660,000

Total Rp 15,660,000

Medan, 28 Agustus 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 30 AGUSTUS 2021 S/D 4 SEPTEMBER 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Rendi Kn 6 70,000 420,000 420,000
2 Kembar Tk. Keramik 6 130,000 780,000 780,000
3 Kian Tk. Keramik 6 130,000 780,000 780,000
4 Bagol Kn 6 70,000 420,000 420,000
5 Dian Kn 6 70,000 420,000 420,000
6 Yordan Tk. Listrik 6 90,000 540,000 540,000
7 Jimmi Kn 6 70,000 420,000 420,000
8 Hengki Kn 6 70,000 420,000 420,000
9 Angga Kn 6 70,000 420,000 420,000
10 Agun Kn 6 75,000 450,000 450,000
11 Nasir Kn 6 70,000 420,000 420,000
12 Danda Kn 6 70,000 420,000 420,000
13 Priadi Tk. Keramik 6 130,000 780,000 780,000
14 Ive Kn 6 70,000 420,000 420,000
15 Masnur Kn 6 70,000 420,000 420,000
16 Diki Tk. Air 6 115,000 690,000 690,000
17 Darma Kn 6 75,000 450,000 450,000
18 Ilham Tk. Listrik 6 90,000 540,000 540,000
19 Likin Tk. Batu 6 105,000 630,000 630,000
20 Sarwo Tk. Batu 6 105,000 630,000 630,000
21 Roni Kn 6 75,000 450,000 450,000
22 Bengbeng Kn 6 70,000 420,000 420,000
23 Sandro Tk. Gypsum 6 115,000 690,000 690,000
24 Bindo Tk. Gypsum 6 115,000 690,000 690,000
25 Irsan Kn 6 70,000 420,000 420,000
26 Tomo Kn 6 70,000 420,000 420,000
27 Hendro Kn 6 70,000 420,000 420,000
28 Harianto Tk. Resin 5 105,000 525,000 525,000
29 Supriadi Tk. Keramik 5 120,000 600,000 600,000
- -
15,105,000 - - 15,105,000

Total Rp 15,105,000

Medan, 4 September 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 6 SEPTEMBER 2021 S/D 11 SEPTEMBER 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Rendi Kn 6 70,000 420,000 420,000
2 Kian Tk. Keramik 6 130,000 780,000 780,000
3 Harianto Tk. Resin 6 105,000 630,000 630,000
4 Danda Kn 6 70,000 420,000 420,000
5 Nasir Kn 6 70,000 420,000 420,000
6 Yordan Tk. Listrik 5 90,000 450,000 450,000
7 Hengki Kn 6 70,000 420,000 420,000
8 Jimmi Kn 4 70,000 280,000 280,000
9 Kembar Tk. Keramik 6 130,000 780,000 780,000
10 Dandi Kn 6 70,000 420,000 420,000
11 Priadi Tk. Keramik 6 130,000 780,000 780,000
12 Agun Kn 6 75,000 450,000 450,000
13 Dian Kn 5 70,000 350,000 350,000
14 Bagol Kn 5 70,000 350,000 350,000
15 Diki Tk. Air 6 115,000 690,000 690,000
16 Irsan Kn 6 70,000 420,000 420,000
17 Sandro Tk. Gypsum 6 115,000 690,000 690,000
18 Bindu Tk. Gypsum 6 115,000 690,000 690,000
19 Likin Tk. Batu 6 105,000 630,000 630,000
20 Tomok Kn 6 70,000 420,000 70,000 pengecoran di Wira 490,000
21 Hendro Kn 6 70,000 420,000 420,000
22 Roni Kn 6 75,000 450,000 75,000 pengecoran di Wira 525,000
23 Bengbeng Kn 6 70,000 420,000 70,000 pengecoran di Wira 490,000
24 Sarwo Tk. Batu 6 105,000 630,000 630,000
25 Ive Kn 5 70,000 350,000 70,000 pengecoran di Wira 420,000
26 Angga Kn 5 70,000 350,000 350,000
27 Darma Kn 5 75,000 375,000 375,000
28 Supriadi Tk. Keramik 5 120,000 600,000 600,000
29 Ilham Tk. Listrik 4 90,000 360,000 360,000
- -
14,445,000 285,000 - 14,730,000

Total Rp 14,730,000

Medan, 11 September 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 13 SEPTEMBER 2021 S/D 18 SEPTEMBER 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Rendi Kn 4 70,000 280,000 280,000
2 Kian Tk. Keramik 6 130,000 780,000 780,000
3 Danda Kn 6 70,000 420,000 420,000
4 Nasir Kn 6 70,000 420,000 420,000
5 Yordan Tk. Listrik 6 90,000 540,000 540,000
6 Ive Kn 6 70,000 420,000 420,000
7 Harianto Tk. Resin 6 105,000 630,000 630,000
8 Kembar Tk. Keramik 6 130,000 780,000 780,000
9 Dandi Kn 6 70,000 420,000 420,000
10 Priadi Tk. Keramik 5 130,000 650,000 650,000
11 Dian Kn 6 70,000 420,000 420,000
12 Bagol Kn 6 70,000 420,000 420,000
13 Diki Tk. Air 6 115,000 690,000 690,000
14 Agun Kn 5 75,000 375,000 375,000
15 Angga Kn 5 70,000 350,000 350,000
16 Ilham Tk. Listrik 6 90,000 540,000 540,000
17 Darma Kn 6 75,000 450,000 450,000
18 Jimmi Kn 6 70,000 420,000 420,000
19 Hengki Kn 6 70,000 420,000 420,000
20 Supriadi Tk. Keramik 6 120,000 720,000 720,000
21 Irsan Kn 5 70,000 350,000 350,000
22 Sandro Tk. Gypsum 5 115,000 575,000 575,000
23 Bindo Tk. Gypsum 5 115,000 575,000 575,000
24 Likin Tk. Batu 6 105,000 630,000 630,000
25 Sarwo Tk. Batu 6 105,000 630,000 630,000
26 Tomo Kn 6 70,000 420,000 420,000
27 Roni Kn 6 75,000 450,000 450,000
28 Bembeng Kn 6 70,000 420,000 420,000
29 Hendro Kn 6 70,000 420,000 420,000
- -
14,615,000 - - 14,615,000

Total Rp 14,615,000

Medan, 18 September 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH INSANI
PERIODE TGL 13 SEPTEMBER 2021 S/D 18 SEPTEMBER 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Rudi Tk. Cat 6 105,000 630,000 630,000
2 Arman Tk. Cat 6 95,000 570,000 570,000

1,200,000 - - 1,200,000

Total Rp 1,200,000

Medan, 26 JUNI 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (Ari Surbakti) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH ABADI SIMPANG POS
PERIODE TGL 20 SEPTEMBER 2021 S/D 25 SEPTEMBER 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Rendi Kn 6 70,000 420,000 420,000
2 Kembar Tk. Keramik 6 130,000 780,000 780,000
3 Dandi Kn 6 70,000 420,000 420,000
4 Nasir Kn 6 70,000 420,000 420,000
5 Danda Kn 6 70,000 420,000 420,000
6 Yordan Tk. Listrik 6 90,000 540,000 540,000
7 Priadi Tk. Keramik 6 130,000 780,000 780,000
8 Agun Kn 6 75,000 450,000 450,000
9 Angga Kn 5 70,000 350,000 350,000
10 Harianto Tk. Resin 6 105,000 630,000 630,000
11 Bagol Kn 6 70,000 420,000 420,000
12 Dian Kn 6 70,000 420,000 420,000
13 Kian Tk. Keramik 6 130,000 780,000 780,000
14 Hengki Kn 6 70,000 420,000 420,000
15 Diki Tk. Air 6 115,000 690,000 690,000
16 Jimmi Kn 5 70,000 350,000 350,000
17 Darma Kn 5 75,000 375,000 375,000
18 Ive Kn 6 70,000 420,000 420,000
19 Supriadi Tk. Keramik 6 120,000 720,000 720,000
20 Sandro Tk. Gypsum 5 115,000 575,000 575,000
21 Bindo Tk. Gypsum 6 115,000 690,000 690,000
22 Sarwo Tk. Batu 4 105,000 420,000 420,000
23 Likin Tk. Batu 6 105,000 630,000 630,000
24 Hendro Kn 5 70,000 350,000 350,000
25 Bembeng Kn 5 70,000 350,000 350,000
26 Irsan Kn 5 70,000 350,000 350,000
- -
13,170,000 - - 13,170,000

Total Rp 13,170,000

Medan, 25 September 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN TUKANG KENEK KERJA DAN LEMBUR
PROYEK AKPER WIRAHUSADA
PERIODE 11 Mei 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Ijul Tk. Kayu 1 120,000 120,000 120,000 pengecoran lt 4 WH 240,000
2 Setiawan Tk. Besi 1 120,000 120,000 120,000 pengecoran lt 4 WH 240,000
3 Dani Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
4 Johanes Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
5 Junaidi Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
6 Rade Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
7 Iman Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
8 Rendi Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
9 Alpin Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
10 Rudi Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
11 Topik Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
12 Iwan TRG Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
13 Rahmat Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
14 Farhan Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
15 Roni Kn 1 95,000 95,000 95,000 pengecoran lt 4 WH 190,000
16 Ano Kn 1 90,000 90,000 90,000 pengecoran lt 4 WH 180,000
17 Adi PU PU 1 - - 140,000 pengecoran lt 4 WH 140,000
18 Misdi Tk. Kayu 1 - - 120,000 pengecoran lt 4 WH 120,000
19 Ajis Tk. Kayu 1 - - 120,000 pengecoran lt 4 WH 120,000
20 Riadi Tk. Kayu 1 - - 120,000 pengecoran lt 4 WH 120,000
21 Sutrisno Tk. Kayu 1 - - 120,000 pengecoran lt 4 WH 120,000
22 Edi Tk. Besi 1 - - 120,000 pengecoran lt 4 WH 120,000
23 Wanda Tk. Besi 1 - - 120,000 pengecoran lt 4 WH 120,000
- -
1,505,000 2,365,000 - 3,870,000

Total Rp 3,870,000
Medan, 12 Mei 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 1 MARET 2021 SD 6 MARET 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Ijul Tk. Kayu 6 100,000 600,000 600,000
2 Andri Kn 5 60,000 300,000 300,000
3 Riadi Tk. Kayu 6 100,000 600,000 600,000
4 Wak Roni Kn 5.5 70,000 385,000 385,000
5 Gugun Kn 5 70,000 350,000 350,000
6 Adi S PU 6 120,000 720,000 720,000
7 Topik Kn 6 70,000 420,000 420,000
- -
- -
3,375,000 - - 3,375,000

Total Rp 3,375,000

Medan, 6 Maret 2021


Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 8 MARET 2021 SD 13 MARET 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Ijul Tk Kayu 6 100,000 600,000 600,000
2 Nanda Kn 6 70,000 420,000 420,000
3 Andri Kn 6 60,000 360,000 360,000
4 Riadi Tk. Kayu 6 100,000 600,000 600,000
5 Wak Roni Kn 6 70,000 420,000 420,000
6 Gugun Kn 5 70,000 350,000 350,000
7 Adi S PU 6 120,000 720,000 720,000
8 Topik Kn 6 70,000 420,000 420,000
- -
3,890,000 - - 3,890,000

Total Rp 3,890,000

Medan, 13 Maret 2021


Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 15 MARET 2021 SD 20 MARET 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Nanda Kn 5 70,000 350,000 350,000
2 Riadi Tk. Kayu 6 100,000 600,000 600,000
3 Adi S PU 6 120,000 720,000 720,000
4 Wak Roni Kn 5.5 70,000 385,000 385,000
5 Topik Kn 6 70,000 420,000 420,000
- -
- -
2,475,000 - - 2,475,000

Total Rp 2,475,000

Medan, 20 Maret 2021


Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 22 MARET 2021 SD 27 MARET 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Ijul Tk. Kayu 6 100,000 600,000 600,000
2 Dipong Tk. Kayu 6 100,000 600,000 600,000
3 Sukiman Tk. Kayu 6 100,000 600,000 600,000
4 Nanda Kn 4.5 70,000 315,000 315,000
5 Riadi Tk. Kayu 6 100,000 600,000 600,000
6 Misdi Kn 5 70,000 350,000 350,000
7 Wak Roni Kn 5 70,000 350,000 350,000
8 Misnan Tk. Kayu 6 100,000 600,000 600,000
9 Hamdan Tk. Kayu 6 100,000 600,000 600,000
10 Sutrisno Tk. Kayu 6 100,000 600,000 600,000
11 Andri Kn 6 60,000 360,000 360,000
12 Topik Kn 6 70,000 420,000 420,000
13 Adi S PU 6 120,000 720,000 720,000
14 Edi Tk. Besi 4 100,000 400,000 400,000
15 Iwan K Tk. Besi 4 100,000 400,000 400,000
- -
- -
7,515,000 - - 7,515,000

Total Rp 7,515,000

Medan, 27 Maret 2021


Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 29 MARET 2021 SD 3 APRIL 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Ijul Tk. Kayu 6 100,000 600,000 600,000
2 Dipong Tk. Kayu 6 100,000 600,000 600,000
3 Sukiman Tk. Kayu 6 100,000 600,000 600,000
4 Riadi Tk. Kayu 5 100,000 500,000 500,000
5 Wak Roni Kn 5.5 70,000 385,000 385,000
6 Iwan TRG Kn 5 70,000 350,000 350,000
7 Sutrisno Tk. Kayu 6 100,000 600,000 600,000
8 Andri Kn 4 60,000 240,000 240,000
9 Topik Kn 6 70,000 420,000 420,000
10 Riki Kn 6 70,000 420,000 420,000
11 Rade Kn 6 70,000 420,000 420,000
12 Yono Tk. Besi 6 100,000 600,000 600,000
13 Adi Tk. Batu 6 100,000 600,000 600,000
14 Adi S PU 6 120,000 720,000 720,000
15 Hamdan Tk. Kayu 6 100,000 600,000 600,000
16 Kandar Tk. Kayu 5 100,000 500,000 500,000
17 Irwan KS Tk. Besi 6 100,000 600,000 600,000
18 Edi Tk. Besi 6 100,000 600,000 600,000
19 Misnan Tk. Kayu 5 100,000 500,000 500,000
20 Yudi Kn 4 70,000 280,000 280,000
21 Ajis Tk. Kayu 4 100,000 400,000 400,000
22 Misdi Kn 3 70,000 210,000 210,000
23 Rahmat Kn 3 70,000 210,000 210,000
24 Rudi H Kn 2 70,000 140,000 140,000
- -
11,095,000 - - 11,095,000

Total Rp 11,095,000

Medan, 3 April 2021


Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 5 APRIL 2021 SD 10 APRIL 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Ijul Tk Kayu 6 100,000 600,000 600,000
2 Iwan TRG Kn 6 70,000 420,000 420,000
3 Junaidi Kn 1 70,000 70,000 70,000
4 Dipong Tk. Kayu 6 100,000 600,000 600,000
5 Sukiman Tk. Kayu 6 100,000 600,000 600,000
6 Nanda Kn 6 70,000 420,000 420,000
7 Adi S PU 6 120,000 720,000 720,000
8 Yono Tk. Besi 6 100,000 600,000 600,000
9 Adi Tk. Batu 6 100,000 600,000 600,000
10 Rahmat Kn 6 70,000 420,000 420,000
11 Misnan Tk. Kayu 6 100,000 600,000 600,000
12 Hamdan Tk. Kayu 6 100,000 600,000 600,000
13 Riki Kn 6 70,000 420,000 420,000
14 Rade Kn 6 70,000 420,000 420,000
15 Iman Kn 6 70,000 420,000 420,000
16 Rudi H Kn 6 70,000 420,000 420,000
17 Irwan KS Tk. Besi 6 100,000 600,000 600,000
18 Edi Tk. Besi 6 100,000 600,000 600,000
19 Wak Roni Kn 4 70,000 280,000 280,000
20 Alpin Kn 6 70,000 420,000 420,000
21 Misdi Tk. Kayu 4 100,000 400,000 400,000
22 Riadi Tk. Kayu 5 100,000 500,000 500,000
23 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
24 Yetno Tk. Kayu 5 100,000 500,000 500,000
25 Kandar Tk. Kayu 3 100,000 300,000 300,000
26 Topik Kn 5 70,000 350,000 350,000
27 Yudi Kn 4 70,000 280,000 280,000
28 Wak Yono Tk. Kayu 5 100,000 500,000 500,000
29 Mislik Tk. Kayu 5 100,000 500,000 500,000
30 Kardi Tk. Batu 5 100,000 500,000 500,000
31 Amat Kn 5 70,000 350,000 350,000
32 Putra Kn 4 70,000 280,000 280,000
33 Ajis Tk. Kayu 3.5 100,000 350,000 350,000
34 Adriansah Kn 2.5 70,000 175,000 175,000
35 Ano Kn 2 70,000 140,000 140,000
- -
15,455,000 - - 15,455,000

Total Rp 15,455,000

Medan, 10 April 2021


Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 12 APRIL 2021 SD 17 APRIL 2021

Jlh
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Jumlah Diterima Tanda Terima
1 Iwan TRG Kn 5 70,000 350,000 350,000
2 Ijul Tk. Kayu 5 100,000 500,000 500,000
3 Alpin Kn 4 70,000 280,000 280,000
4 Wak Roni Kn 1 70,000 70,000 70,000
5 Misnan Tk. Kayu 4 100,000 400,000 400,000
6 Hamdan Tk. Kayu 4 100,000 400,000 400,000
7 Yono Tk. Besi 5 100,000 500,000 500,000
8 Riadi Tk. Kayu 5 100,000 500,000 500,000
9 Nanda Kn 4 70,000 280,000 280,000
10 Yetno Tk. Kayu 5 100,000 500,000 500,000
11 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
12 Rade Kn 4 70,000 280,000 280,000
13 Rudi H Kn 6 70,000 420,000 420,000
14 Adi S PU 6 120,000 720,000 720,000
15 Ajis Tk. Kayu 5 100,000 500,000 500,000
16 Riki Kn 5 70,000 350,000 350,000
17 Edi Tk. Besi 6 100,000 600,000 600,000
18 Irwan KS Tk. Besi 4.5 100,000 450,000 450,000
19 Topik Kn 5 70,000 350,000 350,000
20 Iman Kn 5 70,000 350,000 350,000
21 Ano Kn 6 70,000 420,000 420,000
22 Adriansah Kn 5 70,000 350,000 350,000
23 Adi Tk. Batu 5 100,000 500,000 500,000
24 Misdi Tk. Kayu 4 100,000 400,000 400,000
25 Sutrisno KLP Kn 4 70,000 280,000 280,000
26 Dani Kn 4 70,000 280,000 280,000
27 Dwi Kn 1 70,000 70,000 70,000
- -
10,600,000 - - 10,600,000

Total Rp 10,600,000

Medan, 17 April 2021


Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 19 APRIL 2021 SD 24 APRIL 2021

Jlh
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Jumlah Diterima Tanda Terima
hari
1 Ijul Tk. Kayu 5 100,000 500,000 500,000
2 Iwan TRG Kn 6 70,000 420,000 420,000
3 Misdi Tk. Kayu 6 100,000 600,000 600,000
4 Nanda Kn 6 70,000 420,000 420,000
5 Alpin Kn 2 70,000 140,000 140,000
6 Rahmat Kn 6 70,000 420,000 420,000
7 Adi S PU 6 120,000 720,000 720,000
8 Riadi Tk. Kayu 5 100,000 500,000 500,000
9 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
10 Dani Kn 6 70,000 420,000 420,000
11 Sutrisno KLP Kn 5 70,000 350,000 350,000
12 Yono Tk. Besi 6 100,000 600,000 600,000
13 Ajis Tk. Kayu 6 100,000 600,000 600,000
14 Topik Kn 3 70,000 210,000 210,000
15 Rade Kn 6 70,000 420,000 420,000
16 Riki Kn 6 70,000 420,000 420,000
17 Iman Kn 5 70,000 350,000 350,000
18 Irwan KS Tk. Besi 6 100,000 600,000 600,000
19 Ano Kn 6 70,000 420,000 420,000
20 Rudi H Kn 6 70,000 420,000 420,000
21 Edi Tk. Besi 6 100,000 600,000 600,000
22 Adriansah Kn 1 70,000 70,000 70,000
23 Adi Tk. Batu 6 100,000 600,000 600,000
24 Johanes Kn 6 70,000 420,000 420,000
25 Junaidi Kn 5 70,000 350,000 350,000
26 Salim Tk. Besi 3 100,000 300,000 300,000
- -
11,370,000 - - 11,370,000

Total Rp 11,370,000

Medan, 24 April 2021


Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 26 APRIL 2021 SD 1 Mei 2021

Jlh
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Jumlah Diterima Tanda Terima
hari
1 Ijul Tk. Kayu 6 100,000 600,000 600,000
2 Salim Tk. Besi 6 100,000 600,000 600,000
3 Iwan TRG Kn 6 70,000 420,000 420,000
4 Riadi Tk. Kayu 4.5 100,000 450,000 450,000
5 Yono Tk. Besi 6 100,000 600,000 600,000
6 Rahmat Kn 6 70,000 420,000 420,000
7 Sutrisno KLP Kn 6 70,000 420,000 420,000
8 Sutrisno Tk. Kayu 6 100,000 600,000 600,000
9 Dani Kn 5 70,000 350,000 350,000
10 Edi Tk. Besi 6 100,000 600,000 600,000
11 Irwan KS Tk. Besi 6 100,000 600,000 600,000
12 Junaidi Kn 6 70,000 420,000 420,000
13 Nanda Kn 5 70,000 350,000 350,000
14 Rudi H Kn 5 70,000 350,000 350,000
15 Iman Kn 5 70,000 350,000 350,000
16 Adi S PU 6 120,000 720,000 120,000 pembuatan peti 840,000
17 Rade Kn 5 70,000 350,000 350,000
18 Riki Kn 6 70,000 420,000 420,000
19 Ajis Tk. Kayu 4 100,000 400,000 400,000
20 Adi Tk. Batu 6 100,000 600,000 600,000
21 Alpin Kn 2 70,000 140,000 140,000
22 Johanes Kn 3 70,000 210,000 210,000
23 Misdi Tk. Kayu 5 100,000 500,000 500,000
24 Ano Kn 1 70,000 70,000 70,000
- -
10,540,000 120,000 - 10,660,000

Total Rp 10,660,000

Medan, 1 Mei 2021


Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 3 MEI 2021 SD 8 Mei 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Ijul Tk. Kayu 6 100,000 600,000 50,000 perakitan besi lt 4 WH 650,000
2 Iwan TRG Kn 6 70,000 420,000 52,000 perakitan besi lt 4 WH 472,000
3 Rahmat Kn 6 70,000 420,000 52,000 perakitan besi lt 4 WH 472,000
4 Dani Kn 6 70,000 420,000 52,000 perakitan besi lt 4 WH 472,000
5 Sutrisno KLP Kn 6 70,000 420,000 52,000 perakitan besi lt 4 WH 472,000
6 Nanda Kn 6 70,000 420,000 52,000 perakitan besi lt 4 WH 472,000
7 Riadi Tk. Kayu 5 100,000 500,000 500,000
8 Rendi Kn 6 70,000 420,000 52,000 perakitan besi lt 4 WH 472,000
9 Alpin Kn 6 70,000 420,000 52,000 perakitan besi lt 4 WH 472,000
10 Jepri Kn 6 70,000 420,000 52,000 perakitan besi lt 4 WH 472,000
11 Johanes Kn 6 70,000 420,000 52,000 perakitan besi lt 4 WH 472,000
12 Salim Tk. Besi 6 100,000 600,000 75,000 perakitan besi lt 4 WH 675,000
13 Edi Tk. Besi 6 100,000 600,000 600,000
14 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
15 Misdi Tk. Kayu 6 100,000 600,000 600,000
16 Yono Tk. Besi 6 100,000 600,000 600,000
17 Rudi H Kn 6 70,000 420,000 17,000 perakitan besi lt 4 WH 437,000
18 Iman Kn 6 70,000 420,000 420,000
19 Junaidi Kn 6 70,000 420,000 52,000 perakitan besi lt 4 WH 472,000
20 Ano Kn 5 70,000 350,000 350,000
21 Irwan KS Tk. Besi 5 100,000 500,000 500,000
22 Rade Kn 6 70,000 420,000 35,000 perakitan besi lt 4 WH 455,000
23 Riki Kn 6 70,000 420,000 35,000 perakitan besi lt 4 WH 455,000
24 Adi Tk, Batu 6 100,000 600,000 75,000 perakitan besi lt 4 WH 675,000
25 Adi S PU 6 120,000 720,000 90,000 perakitan besi lt 4 WH 810,000
26 Jurianko Tk. Kayu 1 100,000 100,000 100,000
27 Darwin Tk. Kayu 1 100,000 100,000 100,000
28 Ajis Tk. Kayu 5 100,000 500,000 50,000 perakitan besi lt 4 WH 550,000
29 Alamsah Kn 5 70,000 350,000 52,500 perakitan besi lt 4 WH 402,500
30 Wanda Tk. Besi 5.5 100,000 550,000 25,000 perakitan besi lt 4 WH 575,000
31 Supriadi Tk. Besi 5 100,000 500,000 500,000
32 Dayat Tk. Kayu 6 105,000 630,000 79,000 perakitan besi lt 4 WH 709,000
33 Rizal Kn 6 70,000 420,000 420,000
34 Dedi Tk. Kayu 6 105,000 630,000 26,000 perakitan besi lt 4 WH 656,000
35 Pupung Kn 5 70,000 350,000 17,000 perakitan besi lt 4 WH 367,000
36 Toni Tk. Besi 6 100,000 600,000 600,000
37 Muri Tk. Besi 6 100,000 600,000 600,000
38 Setiawan Tk. Besi 6 100,000 600,000 25,000 perakitan besi lt 4 WH 625,000
39 Kuswadi Tk. Kayu 5 105,000 525,000 26,000 perakitan besi lt 4 WH 551,000
40 Ngatemmin Tk. Batu 6 105,000 630,000 630,000
41 Sagimin Tk. Kayu 6 105,000 630,000 630,000
42 Hambali Tk. Kayu 6 105,000 630,000 630,000
43 Roni Kn 6 75,000 450,000 37,000 perakitan besi lt 4 WH 487,000
44 Bembeng Kn 4 70,000 280,000 17,000 perakitan besi lt 4 WH 297,000
45 Tomok Kn 4 70,000 280,000 17,000 perakitan besi lt 4 WH 297,000
46 Farhan Kn 6 70,000 420,000 35,000 perakitan besi lt 4 WH 455,000
21,825,000 1,303,500 - 23,128,500

Total Rp 23,128,500
Medan, 8 Mei 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 10 MEI 2021 SD 12 Mei 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Ijul Tk. Kayu 3 100,000 300,000 200,000 pengecoran lt 4 WH 500,000
2 Dani Kn 3 70,000 210,000 110,000 pengecoran lt 4 WH 320,000
3 Ajis Tk. Kayu 2 100,000 200,000 300,000 pengecoran lt 4 WH 500,000
4 Yono Tk. Besi 3 100,000 300,000 300,000
5 Sutrisno KLP Kn 3 70,000 210,000 210,000
6 Roni Kn 3 75,000 225,000 275,000 pengecoran lt 4 WH 500,000
7 Farhan Kn 3 70,000 210,000 360,000 pengecoran lt 4 WH 570,000
8 Riadi Tk. Kayu 3 100,000 300,000 200,000 pengecoran lt 4 WH 500,000
9 Rade Kn 2 70,000 140,000 110,000 pengecoran lt 4 WH 250,000
10 Junaidi Kn 3 70,000 210,000 200,000 pengecoran lt 4 WH 410,000
11 Sutrisno Tk. Kayu 3 100,000 300,000 200,000 pengecoran lt 4 WH 500,000
12 Misdi Tk. Kayu 3 100,000 300,000 200,000 pengecoran lt 4 WH 500,000
13 Edi Tk. Besi 3 100,000 300,000 200,000 pengecoran lt 4 WH 500,000
14 Irwan KS Tk. Besi 3 100,000 300,000 300,000
15 Topik Kn 2 70,000 140,000 200,000 pengecoran lt 4 WH 340,000
16 Nanda Kn 1.5 70,000 105,000 105,000
17 Rudi H Kn 2 70,000 140,000 200,000 pengecoran lt 4 WH 340,000
18 Iman Kn 2 70,000 140,000 200,000 pengecoran lt 4 WH 340,000
19 Alpin Kn 2 70,000 140,000 200,000 pengecoran lt 4 WH 340,000
20 Johanes Kn 2 70,000 140,000 200,000 pengecoran lt 4 WH 340,000
21 Rendi Kn 2 70,000 140,000 200,000 pengecoran lt 4 WH 340,000
22 Jepri Kn 1 70,000 70,000 70,000
23 Adi S PU 3 120,000 360,000 360,000 pengecoran lt 4 WH 720,000
24 Wanda Tk. Besi 2 100,000 200,000 180,000 pengecoran lt 4 WH 380,000
25 Supriadi Tk. Besi 3 100,000 300,000 300,000
26 Toni Tk. Besi 2 100,000 200,000 200,000
27 Muri Tk. Besi 2 100,000 200,000 200,000
28 Setiawan Tk. Besi 2 100,000 200,000 200,000 pengecoran lt 4 WH 400,000
29 Iwan TRG Kn 2 70,000 140,000 200,000 pengecoran lt 4 WH 340,000
30 Rahmat Kn 1 70,000 70,000 200,000 pengecoran lt 4 WH 270,000
31 Ano Kn 1 70,000 70,000 200,000 pengecoran lt 4 WH 270,000
- -
6,260,000 4,895,000 - 11,155,000

Total Rp 11,155,000
Medan, 12 Mei 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 17 MEI 2021 SD 22 Mei 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Ijul Tk. Kayu 6 100,000 600,000 600,000
2 Dani Kn 6 70,000 420,000 420,000
3 Ajis Tk. Kayu 5 100,000 500,000 500,000
4 Rasidi Tk. Besi 6 100,000 600,000 600,000
5 Sutrisno KLP Kn 6 70,000 420,000 420,000
6 Yono Tk. Besi 6 100,000 600,000 600,000
7 Nanda Kn 6 70,000 420,000 420,000
8 Adi S PU 6 120,000 720,000 720,000
9 Rendi Kn 5 70,000 350,000 350,000
10 Johanes Kn 6 70,000 420,000 420,000
11 Jepri Kn 6 70,000 420,000 420,000
12 Rade Kn 6 70,000 420,000 420,000
13 Riki Kn 6 70,000 420,000 420,000
14 Rahmat Kn 6 70,000 420,000 420,000
15 Riadi Tk. Kayu 4 100,000 400,000 400,000
16 Riko Kn 5 70,000 350,000 350,000
17 Sutrisno Tk. Kayu 4 100,000 400,000 400,000
18 Topik Kn 3 70,000 210,000 210,000
19 Adi Tk. Batu 5 100,000 500,000 500,000
20 Alamsah Kn 5 70,000 350,000 350,000
21 Setiawan Tk. Besi 5 100,000 500,000 500,000
22 Iwan TRG Kn 5 70,000 350,000 350,000
23 Junaidi Kn 4 70,000 280,000 280,000
24 Edi Tk. Besi 4 100,000 400,000 400,000
25 Supriadi Tk. Besi 4 100,000 400,000 400,000
26 Wanda Tk. Besi 3 100,000 300,000 300,000
27 Rian Kn 3 70,000 210,000 210,000
28 Muri Tk. Besi 3 100,000 300,000 300,000
- -
11,680,000 - - 11,680,000

Total Rp 11,680,000
Medan, 22 Mei 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 24 MEI 2021 SD 29 Mei 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Ajis Tk. Kayu 4 100,000 400,000 400,000
2 Ijul Tk. Kayu 6 110,000 660,000 660,000
3 Dani Kn 6 70,000 420,000 420,000
4 Rian Kn 5 70,000 350,000 350,000
5 Adi Tk. Batu 6 110,000 660,000 660,000
6 Sutrisno KLP Kn 6 70,000 420,000 420,000
7 Topik Kn 6 70,000 420,000 420,000
8 Yono Tk. Besi 6 100,000 600,000 600,000
9 Rasidi Tk. Besi 6 100,000 600,000 600,000
10 Riadi Tk. Kayu 6 100,000 600,000 600,000
11 Rade Kn 6 70,000 420,000 420,000
12 Nanda Kn 4 70,000 280,000 280,000
13 Junaidi Kn 6 70,000 420,000 420,000
14 Rendi Kn 4 70,000 280,000 280,000
15 Jefri Kn 5 70,000 350,000 350,000
16 Johanes Kn 5 70,000 350,000 350,000
17 Alamsah Tk. Besi 5 80,000 400,000 400,000
18 Sutrisno Tk. Kayu 6 100,000 600,000 600,000
19 Rahmat Kn 6 70,000 420,000 420,000
20 Riki Kn 6 70,000 420,000 420,000
21 Iwan TRG Kn 1 70,000 70,000 70,000
22 Salim Tk. Besi 6 100,000 600,000 600,000
23 Adi S PU 6 120,000 720,000 720,000
24 Riko KLP Kn 5 70,000 350,000 350,000
25 Edi Tk. Besi 5 100,000 500,000 500,000
26 Riko Tk. Kayu 3 110,000 330,000 330,000
27 Roni Kn 5 75,000 375,000 375,000
28 Farhan Kn 5 70,000 350,000 350,000
- -
12,365,000 - - 12,365,000

Total Rp 12,365,000
Medan, 29 Mei 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 31 MEI 2021 SD 5 Juni 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Ijul Tk. Kayu 6 110,000 660,000 660,000
2 Ajis Tk. Kayu 6 100,000 600,000 600,000
3 Nanda Kn 5 70,000 350,000 350,000
4 Yono Tk. Besi 6 100,000 600,000 600,000
5 Dani Kn 6 70,000 420,000 420,000
6 Sutrisno KLP Kn 6 70,000 420,000 420,000
7 Rade Kn 4.5 70,000 315,000 315,000
8 Rian Kn 6 70,000 420,000 420,000
9 Riadi Tk. Kayu 6 100,000 600,000 600,000
10 Adi Tk. Batu 6 110,000 660,000 660,000
11 Topik Kn 6 70,000 420,000 420,000
12 Johanes Kn 6 70,000 420,000 420,000
13 Junaidi Kn 6 70,000 420,000 420,000
14 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
15 Jepri Kn 6 70,000 420,000 8,750 terlambat 1 jam 411,250
16 Rendi Kn 6 70,000 420,000 8,750 terlambat 1 jam 411,250
17 Roni Kn 6 75,000 450,000 450,000
18 Farhan Kn 6 70,000 420,000 420,000
19 Riki Kn 6 70,000 420,000 420,000
20 Iwan TRG Kn 6 70,000 420,000 420,000
21 Difa Kn 6 70,000 420,000 420,000
22 Aidil Kn 6 70,000 420,000 420,000
23 Adi S PU 6 120,000 720,000 120,000 pembuatan peti di RSUBK 840,000
24 Alamsah Tk. Besi 5 80,000 400,000 400,000
25 Rahmat Kn 4 70,000 280,000 280,000
- -
11,595,000 120,000 17,500 11,697,500

Total Rp 11,697,500
Medan, 5 Juni 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 7 Juni 2021 SD 12 Juni 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 6 70,000 420,000 420,000
2 Yono Tk. Kayu 6 100,000 600,000 600,000
3 Ijul Tk. Kayu 6 110,000 660,000 660,000
4 Aidil Kn 6 70,000 420,000 420,000
5 Difa Kn 6 70,000 420,000 420,000
6 Nanda Kn 6 70,000 420,000 420,000
7 Iwan TRG Kn 6 70,000 420,000 420,000
8 Sutrisno KLP Kn 6 70,000 420,000 420,000
9 Rade Kn 5 70,000 350,000 350,000
10 Adi S PU 6 120,000 720,000 720,000
11 Rian Kn 6 70,000 420,000 420,000
12 Junaidi Kn 6 70,000 420,000 420,000
13 Adi Tk. Besi 5 110,000 550,000 550,000
14 Sutrisno Tk. Kayu 6 100,000 600,000 600,000
15 Alamsah Tk. Besi 6 80,000 480,000 480,000
16 Rendi Kn 4 70,000 280,000 280,000
17 Johanes Kn 6 70,000 420,000 420,000
18 Jepri Kn 6 70,000 420,000 420,000
19 Riadi Tk. Kayu 4.5 100,000 450,000 450,000
20 Ajis Tk. Kayu 4 100,000 400,000 400,000
21 Riki Kn 5 70,000 350,000 350,000
22 Topik Kn 5 70,000 350,000 350,000
23 Salim Tk. Besi 3 100,000 300,000 300,000
24 Edi Tk. Besi 3 100,000 300,000 300,000
10,590,000 - - 10,590,000

Total Rp 10,590,000
Medan, 12 Juni 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 14 Juni 2021 SD 19 Juni 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 6 70,000 420,000 420,000
2 Ijul Tk. Kayu 6 110,000 660,000 660,000
3 Iwan TRG Kn 6 70,000 420,000 420,000
4 Ajis Tk. Kayu 6 100,000 600,000 600,000
5 Sutrisno KLP Kn 6 70,000 420,000 420,000
6 Yono Tk. Besi 6 100,000 600,000 600,000
7 Difa Kn 6 70,000 420,000 420,000
8 Aidil Kn 5 70,000 350,000 350,000
9 Adi S PU 6 120,000 720,000 720,000
10 Adi Tk. Batu 6 110,000 660,000 660,000
11 Riadi Tk.Kayu 5 100,000 500,000 500,000
12 Rade Kn 6 70,000 420,000 420,000
13 Junaidi Kn 4 70,000 280,000 280,000
14 Edi Tk. Besi 6 100,000 600,000 600,000
15 Nanda Kn 5 70,000 350,000 350,000
16 Salim Tk. Besi 6 100,000 600,000 600,000
17 Alamsah Tk. Besi 6 80,000 480,000 480,000
18 Rendi Kn 6 70,000 420,000 420,000
19 Jepri Kn 6 70,000 420,000 420,000
20 Topik Kn 6 70,000 420,000 420,000
21 Johanes Kn 5 70,000 350,000 350,000
22 Riki Kn 5 70,000 350,000 350,000
23 Ardi Kn 6 70,000 420,000 420,000
24 Rian Kn 5 70,000 350,000 350,000
25 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
26 Aldi Kn 2 70,000 140,000 140,000
- -
11,870,000 - - 11,870,000

Total Rp 11,870,000
Medan, 19 Juni 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 21 JUNI 2021 SD 26 JUNI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 5.5 70,000 385,000 385,000
2 Ijul Tk. Kayu 6 110,000 660,000 660,000
3 Iwan TRG Kn 6 70,000 420,000 420,000
4 Sutrisno KLP Kn 6 70,000 420,000 420,000
5 Rian Kn 6 70,000 420,000 420,000
6 Yono Tk. Besi 6 100,000 600,000 600,000
7 Difa Kn 1 70,000 70,000 70,000
8 Aidil Kn 6 70,000 420,000 420,000
9 Rade Kn 5 70,000 350,000 350,000
10 Riadi Tk. Kayu 6 100,000 600,000 600,000
11 Sutrisno Tk. Kayu 6 100,000 600,000 600,000
12 Ardi Kn 6 70,000 420,000 420,000
13 Adi S PU 6 120,000 720,000 720,000
14 Edi Tk. Besi 5 100,000 500,000 500,000
15 Topik Kn 6 70,000 420,000 420,000
16 Johanes Kn 6 70,000 420,000 420,000
17 Dimas Kn 4 70,000 280,000 280,000
18 Adi Tk. Batu 6 110,000 660,000 660,000
19 Riki Kn 6 70,000 420,000 420,000
20 Salim Tk. Besi 6 100,000 600,000 600,000
21 Alamsah Tk. Besi 6 80,000 480,000 480,000
22 Jepri Kn 6 70,000 420,000 420,000
23 Rendi Kn 6 70,000 420,000 420,000
24 Sabran Kn 6 70,000 420,000 420,000
25 Ajis Tk. Kayu 3 100,000 300,000 300,000
26 Nanda Kn 5 70,000 350,000 350,000
- -
11,775,000 - - 11,775,000

Total Rp 11,775,000
Medan, 26 Juni 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 28 JUNI 2021 SD 3 JULI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 6 70,000 420,000 420,000
2 Iwan TRG Kn 6 70,000 420,000 420,000
3 Nanda Kn 5.5 70,000 385,000 385,000
4 Sutrisno KLP Kn 6 70,000 420,000 420,000
5 Yono Tk. Besi 5 100,000 500,000 500,000
6 Adi Tk. Batu 5 110,000 550,000 550,000
7 Salim Tk. Besi 6 100,000 600,000 600,000
8 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
9 Rade Kn 5 70,000 350,000 350,000
10 Hasbulah Tk. Kayu 6 100,000 600,000 600,000
11 Sabran Kn 6 70,000 420,000 420,000
12 Adi S Pu 3 120,000 360,000 360,000
13 Topik Kn 5.5 70,000 385,000 385,000
14 Edi Tk. Besi 5 100,000 500,000 500,000
15 Riki Kn 5 70,000 350,000 350,000
16 Dimas Kn 5 70,000 350,000 350,000
17 Alamsah Tk. Besi 5 80,000 400,000 400,000
18 Riadi Tk. Kayu 5 100,000 500,000 500,000
19 Rian Kn 4.5 70,000 315,000 315,000
20 Ardi Kn 5 70,000 350,000 350,000
21 Rendi Kn 4.5 70,000 315,000 315,000
22 Jepri Kn 5 70,000 350,000 350,000
23 Difa Kn 5 70,000 350,000 350,000
24 Aidil Kn 5 70,000 350,000 350,000
25 Imran Kn 6 70,000 420,000 420,000
26 Ijul Tk. Kayu 5 110,000 550,000 550,000
27 Miko Tk. Batu 5 100,000 500,000 500,000
28 Ajis Tk. Kayu 3.5 100,000 350,000 350,000
29 Johanes Kn 3.5 70,000 245,000 245,000
- -
12,105,000 - - 12,105,000

Total Rp 12,105,000
Medan, 3 Juli 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 5 JULI 2021 SD 10 JULI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 6 70,000 420,000 420,000
2 Ijul Tk. Kayu 6 110,000 660,000 660,000
3 Miko Tk. Batu 6 100,000 600,000 600,000
4 Hasbulah Tk. Kayu 6 100,000 600,000 600,000
5 Imran Kn 6 70,000 420,000 420,000
6 Sabran Kn 6 70,000 420,000 420,000
7 Adi Tk. Batu 6 110,000 660,000 660,000
8 Yono Tk. Besi 6 100,000 600,000 600,000
9 Iwan TRG Kn 6 70,000 420,000 420,000
10 Sutrisno KLP Kn 6 70,000 420,000 420,000
11 Riadi Tk. Kayu 6 100,000 600,000 600,000
12 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
13 Dimas Kn 5 70,000 350,000 350,000
14 Difa Kn 1 70,000 70,000 70,000
15 Aidil Kn 6 70,000 420,000 420,000
16 Ardi Kn 6 70,000 420,000 420,000
17 Edi Tk. Besi 6 100,000 600,000 600,000
18 Salim Tk. Besi 2 100,000 200,000 200,000
19 Alamsah Tk. Besi 6 80,000 480,000 480,000
20 Topik Kn 6 70,000 420,000 420,000
21 Johanes Kn 5 70,000 350,000 350,000
22 Jepri Kn 6 70,000 420,000 420,000
23 Rendi Kn 5 70,000 350,000 350,000
24 Adi S PU 5 120,000 600,000 600,000
25 Rade Kn 5 70,000 350,000 350,000
26 Riki Kn 5 70,000 350,000 350,000
27 Ajis Tk. Kayu 2.5 100,000 250,000 250,000
- -
11,950,000 - - 11,950,000

Total Rp 11,950,000
Medan, 10 Juli 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 12 JULI 2021 SD 17 JULI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Rade Kn 5 70,000 350,000 350,000
2 Adi S PU 6 120,000 720,000 720,000
3 Miko Tk. Batu 6 100,000 600,000 600,000
4 Riadi TK. Kayu 4 100,000 400,000 400,000
5 Dani Kn 6 70,000 420,000 420,000
6 Sutrisno KLP Kn 6 70,000 420,000 420,000
7 Alamsah Tk. Besi 6 80,000 480,000 480,000
8 Ijul Tk. Kayu 6 110,000 660,000 660,000
9 Ajis Tk. Kayu 2 100,000 200,000 200,000
10 Adi Tk. Batu 6 110,000 660,000 660,000
11 Yono Tk. Besi 6 100,000 600,000 600,000
12 Riki Kn 6 70,000 420,000 420,000
13 Hasbulah Tk. Kayu 6 100,000 600,000 600,000
14 Sabran Kn 5 70,000 350,000 350,000
15 Imran Kn 1.5 70,000 105,000 105,000
16 Edi Tk. Besi 6 100,000 600,000 600,000
17 Iwan TRG Kn 4 70,000 280,000 280,000
18 Topik Kn 2 70,000 140,000 140,000
19 Rendi Kn 4 70,000 280,000 280,000
20 Aidil Kn 5 70,000 350,000 350,000
21 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
22 Ardi Kn 5 70,000 350,000 350,000
23 Jepri Kn 4 70,000 280,000 280,000
24 Johanes Kn 4 70,000 280,000 280,000
- -
10,045,000 - - 10,045,000

Total Rp 10,045,000
Medan, 17 Juli 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 19 JULI 2021 SD 24 JULI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 5 70,000 350,000 350,000
2 Ijul Tk. Kayu 5 110,000 550,000 550,000
3 Miko Tk. Batu 4 100,000 400,000 400,000
4 Sutrisno KLP Kn 5 70,000 350,000 350,000
5 Sabran Kn 4 70,000 280,000 280,000
6 Yono Tk. Besi 5 100,000 500,000 500,000
7 Adi S PU 5 120,000 600,000 600,000
8 Adi Tk. Batu 5 110,000 550,000 550,000
9 Riadi Tk. Kayu 3 100,000 300,000 300,000
10 Edi Tk. Besi 5 100,000 500,000 500,000
11 Jepri Kn 5 70,000 350,000 350,000
12 Rendi Kn 4 70,000 280,000 280,000
13 Topik Kn 5 70,000 350,000 350,000
14 Johanes Kn 5 70,000 350,000 350,000
15 Iwan TRG Kn 2.5 70,000 175,000 175,000
16 Hasbulah Tk. Kayu 4 100,000 400,000 400,000
17 Rade Kn 3 70,000 210,000 210,000
18 Sutrisno Tk. Kayu 4 100,000 400,000 400,000
19 Riki Kn 4 70,000 280,000 280,000
20 Ardi Kn 4 70,000 280,000 280,000
21 Alamsah Tk. Besi 4 80,000 320,000 320,000
22 Aidil Kn 3 70,000 210,000 210,000
- -
7,985,000 - - 7,985,000

Total Rp 7,985,000
Medan, 24 Juli 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 26 JULI 2021 SD 31 JULI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Ijul Tk. Kayu 6 110,000 660,000 660,000
2 Dani Kn 6 70,000 420,000 420,000
3 Miko Tk. Batu 6 100,000 600,000 600,000
4 Hasbulah Tk. Kayu 6 100,000 600,000 600,000
5 Sutrisno KLP Kn 5 70,000 350,000 350,000
6 Yono Tk. Besi 6 100,000 600,000 600,000
7 Sabran Kn 6 70,000 420,000 420,000
8 Aidil Kn 6 70,000 420,000 420,000
9 Adi Tk. Batu 6 110,000 660,000 660,000
10 Adi S PU 6 120,000 720,000 720,000
11 Sutrisno Tk. Kayu 6 100,000 600,000 600,000
12 Rade Kn 6 70,000 420,000 420,000
13 Riki Kn 6 70,000 420,000 420,000
14 Edi Tk. Besi 6 100,000 600,000 600,000
15 Jepri Kn 3.5 70,000 245,000 245,000
16 Topik Kn 4 70,000 280,000 280,000
17 Johanes Kn 6 70,000 420,000 420,000
18 Roni Kn 6 75,000 450,000 160,000 tgl 25/7 partisi di lt 4 RSUBK 610,000
19 Giatno Tk. Kayu 4 115,000 460,000 460,000
20 Ardi Kn 5 70,000 350,000 350,000
21 Rendi Kn 2.5 70,000 175,000 175,000
22 Alamsah Tk. Besi 4 80,000 320,000 320,000
10,190,000 160,000 - 10,350,000

Total Rp 10,350,000
Medan, 31 Juli 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 2 AGUSTUS 2021 SD 7 AGUSTUS 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Giatno Tk. Kayu 5 115,000 575,000 575,000
2 Miko Tk. Batu 5 100,000 500,000 500,000
3 Dani Kn 6 70,000 420,000 420,000
4 Ijul Tk. Kayu 6 110,000 660,000 660,000
5 Sukirno KLP Kn 6 70,000 420,000 420,000
6 Yono Tk. Besi 5 100,000 500,000 500,000
7 Adi Tk. Besi 6 110,000 660,000 660,000
8 Riadi Tk. Kayu 6 100,000 600,000 600,000
9 Adi S PU 6 120,000 720,000 720,000
10 Ardi Kn 6 70,000 420,000 420,000
11 Sabran Kn 4 70,000 280,000 280,000
12 Edi Tk. Besi 6 100,000 600,000 600,000
13 Jepri Kn 5 70,000 350,000 17,000 pulang jam 15 333,000
14 Rendi Kn 3 70,000 210,000 210,000
15 Johanes Kn 4 70,000 280,000 280,000
16 Alamsah Tk. Besi 5 80,000 400,000 400,000
17 Hasbulah Tk. Kayu 5 100,000 500,000 500,000
18 Rade Kn 5 70,000 350,000 350,000
19 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
20 Riki Kn 5 70,000 350,000 350,000
21 Topik Kn 4 70,000 280,000 17,000 pulang jam 15 263,000
22 Ajis Tk. Kayu 1.5 100,000 150,000 150,000
9,725,000 - 34,000 9,691,000

Total Rp 9,691,000
Medan, 7 Agustus 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 9 AGUSTUS 2021 SD 14 AGUSTUS 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Giatno Tk. Kayu 5 115,000 575,000 575,000
2 Ijul Tk. Kayu 6 110,000 660,000 660,000
3 Dani Kn 6 70,000 420,000 420,000
4 Sutrisno KLP Kn 5 70,000 350,000 350,000
5 Sabran Kn 5 70,000 350,000 350,000
6 Yono Tk. Besi 6 100,000 600,000 600,000
7 Riadi Tk. Kayu 5 100,000 500,000 500,000
8 Hasbulah Tk. Kayu 5.5 100,000 550,000 550,000
9 Adi Tk. Besi 6 110,000 660,000 660,000
10 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
11 Rade Kn 5 70,000 350,000 350,000
12 Ardi Kn 5 70,000 350,000 18,000 11/8 sakit pulang jam 15 332,000
13 Alamsah Tk. Besi 6 80,000 480,000 480,000
14 Edi Tk. Besi 6 100,000 600,000 600,000
15 Topik Kn 6 70,000 420,000 420,000
16 Johanes Kn 6 70,000 420,000 420,000
17 Adi S PU 6 120,000 720,000 720,000
18 Ajis Tk. Kayu 2.5 100,000 250,000 250,000
19 Riki Kn 5 70,000 350,000 350,000
20 Haris Kn 4 70,000 280,000 280,000
21 Dulah Kn 4 70,000 280,000 280,000
22 Paiman Tk. Besi 3 100,000 300,000 300,000
23 Toni Tk. Besi 2 100,000 200,000 200,000
24 Wanda Tk. Besi 3 100,000 300,000 300,000
25 Supriadi Tk. Besi 3 100,000 300,000 300,000
- -
10,765,000 - 18,000 10,747,000

Total Rp 10,747,000
Medan, 14 Agustus 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 16 AGUSTUS 2021 SD 21 AGUSTUS 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 5 70,000 350,000 350,000
2 Ijul Tk. Kayu 5 110,000 550,000 550,000
3 Sutrisno KLP Kn 5 70,000 350,000 350,000
4 Sabran Kn 1 70,000 70,000 70,000
5 Yono Tk. Besi 5 100,000 500,000 500,000
6 Haris Kn 5 70,000 350,000 350,000
7 Rade Kn 5 70,000 350,000 350,000
8 Adi Tk Batu 3 110,000 330,000 330,000
9 Adi S PU 5 120,000 600,000 600,000
10 Dulah Kn 5 70,000 350,000 350,000
11 Paiman Tk. Besi 5 100,000 500,000 500,000
12 Topik Kn 5 70,000 350,000 350,000
13 Wanda Tk. Besi 5 100,000 500,000 500,000
14 Supriadi Tk. Besi 5 100,000 500,000 500,000
15 Edi Tk. Besi 5 100,000 500,000 500,000
16 Alamsah Tk. Besi 4 80,000 320,000 320,000
17 Ardi Kn 4 70,000 280,000 280,000
18 Toni Tk. Besi 4 100,000 400,000 400,000
19 Ajis Tk. Kayu 4 100,000 400,000 400,000
20 Salim Tk. Besi 4 100,000 400,000 400,000
21 Riadi Tk. Kayu 2 100,000 200,000 200,000
22 Sutrisno Tk. Kayu 2 100,000 200,000 200,000
23 Johanes Kn 3 70,000 210,000 210,000
24 Riko Tk. Kayu 2 110,000 220,000 220,000
25 Gito Tk. Kayu 2 110,000 220,000 220,000
- -
9,000,000 - - 9,000,000

Total Rp 9,000,000
Medan, 21 Agustus 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 23 AGUSTUS 2021 SD 28 AGUSTUS 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 6 70,000 420,000 420,000
2 Ijul Tk. Kayu 6 110,000 660,000 660,000
3 Yono Tk. Besi 6 100,000 600,000 600,000
4 Hasbulah Tk. Kayu 6 100,000 600,000 600,000
5 Toni Tk. Besi 6 100,000 600,000 600,000
6 Riadi Tk. Kayu 5 100,000 500,000 500,000
7 Sutrisno KLP Kn 6 70,000 420,000 420,000
8 Dulah Kn 6 70,000 420,000 420,000
9 Salim Tk.Besi 6 100,000 600,000 600,000
10 Alamsah Tk. Besi 5 80,000 400,000 400,000
11 Riko Tk. Kayu 6 110,000 660,000 660,000
12 Adi Tk. Batu 6 110,000 660,000 660,000
13 Adi S PU 6 120,000 720,000 720,000
14 Sutrisno Tk. Kayu 3.5 100,000 350,000 350,000
15 Rade Kn 5 70,000 350,000 350,000
16 Gito Tk. Kayu 6 110,000 660,000 660,000
17 Ardi Kn 6 70,000 420,000 420,000
18 Edi Tk. Besi 6 100,000 600,000 600,000
19 Wanda Tk. Besi 6 100,000 600,000 600,000
20 Supriadi Tk. Besi 6 100,000 600,000 600,000
21 Riki Kn 6 70,000 420,000 420,000
22 Haris Kn 6 70,000 420,000 420,000
23 Topik Kn 6 70,000 420,000 420,000
24 Johanes Kn 6 70,000 420,000 420,000
25 Paiman Tk. Besi 6 100,000 600,000 600,000
26 Sabran Kn 5 70,000 350,000 350,000
27 Ajis Tk. Kayu 4 100,000 400,000 400,000
- -
13,870,000 - - 13,870,000

Total Rp 13,870,000
Medan, 28 Agustus 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 30 AGUSTUS 2021 SD 4 SEPTEMBER 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 6 70,000 420,000 420,000
2 Ijul Tk. Kayu 6 110,000 660,000 660,000
3 Yono Tk. Besi 6 100,000 600,000 600,000
4 Sutrisno KLP Kn 5 70,000 350,000 350,000
5 Hasbulah Tk. Kayu 6 100,000 600,000 600,000
6 Riadi Tk. Kayu 6 100,000 600,000 600,000
7 Toni Tk. Besi 6 100,000 600,000 600,000
8 Ajis Tk. Kayu 5.5 100,000 550,000 550,000
9 Salim Tk. Besi 6 100,000 600,000 600,000
10 Riko Tk. Kayu 6 110,000 660,000 660,000
11 Adi Tk. Batu 5 110,000 550,000 550,000
12 Rade Kn 6 70,000 420,000 420,000
13 Haris Kn 6 70,000 420,000 420,000
14 Sutrisno Tk. Kayu 5 100,000 500,000 500,000
15 Supriadi Tk. Besi 6 100,000 600,000 600,000
16 Topik Kn 6 70,000 420,000 420,000
17 Johanes Kn 6 70,000 420,000 420,000
18 Gito Tk. Kayu 6 110,000 660,000 660,000
19 Adi S PU 6 120,000 720,000 720,000
20 Alamsah Tk. Besi 6 80,000 480,000 480,000
21 Edi Tk. Besi 6 100,000 600,000 600,000
22 Riki Kn 6 70,000 420,000 420,000
23 Ardi Kn 6 70,000 420,000 420,000
24 Wanda Tk. Besi 6 100,000 600,000 600,000
25 Sabran Kn 5 70,000 350,000 350,000
26 Paiman Tk. Besi 4 100,000 400,000 400,000
27 Dulah Kn 5 70,000 350,000 350,000
- -
13,970,000 - - 13,970,000

Total Rp 13,970,000
Medan, 4 September 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 6 SEPTEMBER 2021 SD 11 SEPTEMBER 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 6 70,000 420,000 70,000 pengecoran di wira 490,000
2 Ijul Tk. Kayu 6 110,000 660,000 110,000 pengecoran di wira 770,000
3 Riadi Tk. Kayu 5 100,000 500,000 100,000 pengecoran di wira 600,000
4 Sutrisno KLP Kn 6 70,000 420,000 420,000
5 Yono Tk. Besi 5 100,000 500,000 500,000
6 Ajis Tk. Kayu 2.5 100,000 250,000 100,000 pengecoran di wira 350,000
7 Sabran Kn 6 70,000 420,000 420,000
8 Gito Tk. Kayu 6 110,000 660,000 110,000 pengecoran di wira 770,000
9 Riko Tk. Kayu 6 110,000 660,000 110,000 pengecoran di wira 770,000
10 Salim Tk. Besi 6 100,000 600,000 100,000 pengecoran di wira 700,000
11 Sutrisno Tk. Kayu 4 100,000 400,000 100,000 pengecoran di wira 500,000
12 Adi Tk. Batu 6 110,000 660,000 110,000 pengecoran di wira 770,000
13 Adi S PU 6 120,000 720,000 120,000 pengecoran di wira 840,000
14 Rade Kn 6 70,000 420,000 70,000 pengecoran di wira 490,000
15 Dulah Kn 6 70,000 420,000 70,000 pengecoran di wira 490,000
16 Ardi Kn 6 70,000 420,000 70,000 pengecoran di wira 490,000
17 Edi Tk. Besi 6 100,000 600,000 100,000 pengecoran di wira 700,000
18 Riki Kn 6 70,000 420,000 70,000 pengecoran di wira 490,000
19 Topik Kn 6 70,000 420,000 70,000 pengecoran di wira 490,000
20 Johanes Kn 6 70,000 420,000 70,000 pengecoran di wira 490,000
21 Alamsah Tk. Besi 5 80,000 400,000 80,000 pengecoran di wira 480,000
22 Haris Kn 6 70,000 420,000 70,000 pengecoran di wira 490,000
23 Hasbulah Tk. Kayu 3 100,000 300,000 300,000
11,110,000 1,700,000 - 12,810,000

Total Rp 12,810,000
Medan, 11 September 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 13 SEPTEMBER 2021 SD 18 SEPTEMBER 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 6 70,000 420,000 420,000
2 Ijul Tk. Kayu 6 110,000 660,000 660,000
3 Sutrisno KLP Kn 4 70,000 280,000 280,000
4 Yono Tk. Besi 6 100,000 600,000 600,000
5 Adi S PU 6 120,000 720,000 720,000
6 Adi Tk. Batu 6 110,000 660,000 660,000
7 Ardi Kn 6 70,000 420,000 420,000
8 Alamsah Tk. Besi 6 80,000 480,000 480,000
9 Gito Tk. Kayu 6 110,000 660,000 660,000
10 Riko Tk. Kayu 6 110,000 660,000 660,000
11 Rade Kn 3.5 70,000 245,000 245,000
12 Edi Tk. Besi 6 100,000 600,000 600,000
13 Haris Kn 6 70,000 420,000 420,000
14 Hasbulah Tk. Kayu 6 100,000 600,000 600,000
15 Topik Kn 6 70,000 420,000 420,000
16 Johanes Kn 6 70,000 420,000 420,000
17 Riadi Tk. Kayu 5 100,000 500,000 500,000
18 Salim Tk. Besi 5 100,000 500,000 500,000
19 Dulah Kn 2.5 70,000 175,000 175,000
20 Riiki Kn 5 70,000 350,000 350,000
21 Sutrisno Tk. Kayu 4 100,000 400,000 400,000
22 Ajis Tk. Kayu 3 100,000 300,000 300,000
- -
10,490,000 - - 10,490,000

Total Rp 10,490,000

LAPORAN GAJI TUKANG DAN KENEK


PROYEK RSU KASIH INSANI
PERIODE TGL 13 SEPTEMBER 2021 S/D 18 SEPTEMBER 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Rudi Tk. Cat 6 105,000 630,000 630,000
2 Arman Tk. Cat 6 95,000 570,000 570,000

1,200,000 - - 1,200,000

Total Rp 1,200,000
Medan, 18 September 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK AKPER WIRAHUSADA
PERIODE TGL 20 SEPTEMBER 2021 SD 25 SEPTEMBER 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Dani Kn 6 70,000 420,000 420,000
2 Ijul Tk. Kayu 6 110,000 660,000 660,000
3 Sutrisno KLP Kn 6 70,000 420,000 420,000
4 Yono Tk. Besi 6 100,000 600,000 600,000
5 Salim Tk. Besi 4 100,000 400,000 400,000
6 Adi Tk. Batu 6 110,000 660,000 660,000
7 Riadi Tk. Kayu 5 100,000 500,000 500,000
8 Adi S PU 6 120,000 720,000 720,000
9 Rade Kn 6 70,000 420,000 420,000
10 Edi Tk. Besi 6 100,000 600,000 600,000
11 Riko Tk. Kayu 6 110,000 660,000 660,000
12 Ilham Tk. Listrik 5 90,000 450,000 450,000
13 Gito Tk. Kayu 6 110,000 660,000 660,000
14 Sutrisno Tk. Kayu 6 100,000 600,000 600,000
15 Ardi Kn 5 70,000 350,000 350,000
16 Roni Kn 6 75,000 450,000 450,000
17 Tomok Kn 6 70,000 420,000 420,000
18 Topik Kn 6 70,000 420,000 420,000
19 Johanes Kn 6 70,000 420,000 420,000
20 Riki Kn 5 70,000 350,000 350,000
21 Haris Kn 5 70,000 350,000 350,000
22 Alamsah Tk. Besi 3 80,000 240,000 240,000
- -
10,770,000 - - 10,770,000

Total Rp 10,770,000

LAPORAN GAJI TUKANG DAN KENEK


PROYEK RSU KASIH INSANI
PERIODE TGL 20 SEPTEMBER 2021 S/D 25 SEPTEMBER 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan Tanda Terima
hari Diterima
1 Rudi Tk. Cat 6 105,000 630,000 630,000
2 Arman Tk. Cat 6 95,000 570,000 570,000

1,200,000 - - 1,200,000

Total Rp 1,200,000
Medan, 25 September 2021
Maret 2021
Dibuat Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Laurensus) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH INSANI
PERIODE TGL 26 APRIL 2021 S/D 1 Mei 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Kembar Tk. Keramik 2 130,000 260,000 260,000
2 Yogi Kn 3.5 70,000 245,000 245,000
3 Andi Tk. Listrik 3 130,000 390,000 390,000
4 Angga Kn 6 70,000 420,000 420,000
5 Agun Kn 6 75,000 450,000 450,000
6 Kian Tk. Keramik 6 130,000 780,000 780,000
7 Diki Tk. Air 6 110,000 660,000 660,000
8 Sarul Tk. Kayu 3 105,000 315,000 315,000
9 Tomo Kn 3 70,000 210,000 210,000
10 Tanjung Kn 1 70,000 70,000 70,000

3,800,000 - - 3,800,000

Total Rp 3,800,000

Medan, 1 Mei 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (Ari Surbakti) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH INSANI
PERIODE TGL 5 JULI 2021 S/D 10 JULI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Anto Tk. Cat 6 100,000 600,000 600,000
2 Rudi Tk. Cat 6 105,000 630,000 630,000

1,230,000 - - 1,230,000

Total Rp 1,230,000

Medan, 8 Mei 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (Ari Surbakti) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)
LAPORAN GAJI TUKANG DAN KENEK
PROYEK RSU KASIH INSANI
PERIODE TGL 21 JUNI 2021 S/D 26 JUNI 2021

Jlh Jumlah
No Nama Status Upah /Hari Jumlah Lembur Potong Ket Kegiatan
hari Diterima Tanda Terima
1 Diki Tk. Air 1 110,000 110,000 110,000
2 Iwan Tk. Keramik 6 120,000 720,000 720,000
3 Nasir Kn 6 70,000 420,000 420,000
4 Irsan Kn 5 70,000 350,000 350,000
5 Anto Tk. Cat 6 100,000 600,000 600,000
6 Rudi Tk. Cat 6 105,000 630,000 630,000

2,830,000 - - 2,830,000

Total Rp 2,830,000

Medan, 26 JUNI 2021


Disetujui Diperiksa
PJ Logistik Security Pimpinan Pengawas Bangunan

(Agustinus Ginting) (Religo) (Ari Surbakti) (DR. dr Antonius Ginting SpOG. MARS) (Hamzah) (Halma) (Yustinus Bukit)

You might also like