This document summarizes the monitoring of pile driving work at the Batur cluster, block E9 by contractor PT. Bangun Beton Pratama over several days in March 2022. It includes details of the number of piles driven each day, total depths reached, and remaining depths to be driven. A total of 135 piles were driven with depths ranging from 17.3 to 21.3 meters and some piles requiring additional driving to reach final setting depths.
This document summarizes the monitoring of pile driving work at the Batur cluster, block E9 by contractor PT. Bangun Beton Pratama over several days in March 2022. It includes details of the number of piles driven each day, total depths reached, and remaining depths to be driven. A total of 135 piles were driven with depths ranging from 17.3 to 21.3 meters and some piles requiring additional driving to reach final setting depths.
This document summarizes the monitoring of pile driving work at the Batur cluster, block E9 by contractor PT. Bangun Beton Pratama over several days in March 2022. It includes details of the number of piles driven each day, total depths reached, and remaining depths to be driven. A total of 135 piles were driven with depths ranging from 17.3 to 21.3 meters and some piles requiring additional driving to reach final setting depths.
Disposable email - is a free email service that allows to receive email at a temporary address that self-destructed after a certain time elapses. It is also known by names like tempmail, 10minutemail, 10minmail, - Copy (3)