You are on page 1of 1
DAMAC Lad DAMAC CRFSCFNT PROPFRTIFS DELTA ANA SCON Form No.: SPM/PA/STS/001/00 t [SHOP DRAWING TRANSMITTAL SHE # SD-ELEC-004 a ~ [igpiectName — [ DAMAC HILLS SILVER SPRING 3 Project No. PO2LAT ‘ E Main Works for 46 Villas (G+1+R) Date ‘31-Mar-22 [Submiteal No P021.47-DB52-SD-ELEC-004 _|Revision: joo mittal Title: Shop Drawing submittal oF telephone system layout [We are sending herewith under separate cover the drawings / documents / samples listed below: FEM POS HEWES. SECS DESCRIPTION type | COPIES |REMARKS| 01 Thard copy] Drawing | As per attached [Underground telephone system sD & attached layout athe FIZPE:SD= Shop Drawings SM= Sample, T= Guarantee, Mi» Manufacturers Data CT Cortifiates, TT= TestResilts,OT= Other [cect that the documents / materials submitted herewith have been reviewed in detail and are in strict coptfact drawings and specifications except as otherwise stated. conti (sconk UO /|signature: Received By ,|[Vinod EMfiectwe-, \'"° “WDate} [Project: DAuA © 4, oe Mohammad, Date: Sigtature: Date: RECEIVED 7138S g if [Consultant Decision (‘A Approved © B Approved As Noted © ‘CNotApproved © ‘D’Not Required Signature Received By Contractor: [Resident Engineer Review Comments Resident Engineer's (Nam Date: [Corectons or comments made Telatve to submitale Guing The Tevew do not relieve the contactor fom complance wih he] requirements of The Contract. This check is only for review of general conformance withthe design concept of the project and genera Jcompiance wih the information given in the contract documents. The contractor is responsible for confirming and corelating ai Jauantties and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of other trades [and performing his work ina safe and satisfactory manner Copy to: Employer [~] Consultant [7] as Other L Sheet No, of ___ Head Office LL _

You might also like