aaMaAc WME) BNASCON DAMAC CRESCENT PROPERTIES LLC Arit8Bintoak UAEForm No.: SPM/PA/RF/005/00 Request for Information # P021.47- DBS2-RFI-MECH-001 _] Project Name DAMAG HILLS SILVER SPRINGS -46 | Project No. | PO21.47 VILLAS (DB-52) [Date 13/04/2022 IRFITitle: [Shifting of gully chamber to avoid pipes clashing with electrical duct SPEC/DWG REF IMech-MH-301 With reference to the subject, the sections showing that electrical duct is clashing lwith pipes passing and in order to avoid the clash the gully chamber need to be shifted (refer! attached) Ikinaly confirm. SCON ©. IFC hvac drawing sections ‘Signature’ R wy [Sub Contractor Naséo IContractor: ‘Signature: Received ByR.E. Signature: AL EMARATE De | DB-52 Response By Consultant (RE) Ne ob aed hen “Plea Prscd Oihk AKL Papal } peas [Attachments Resident Engineer Received By Contractor 17 MAY Copy to: Employer Head Office [] Consultant [] as [] Lay Hash caf. pon Via ryie ABSh pn 9) AN sie} Aye croMDfL00R Ls. ‘oman TEM UNOUT ete) ance STEN VEU HBR