You are on page 1of 1
Arif&Bintoak DAMAC DAMAC CRESCENT PROPFRTIFS DETAMIilt WNASCON | Fe No.: SPM/PA/STSI001/00 Project Name Dane HILLS SILVER SPRING 3 Project No. P021.47 Main Works for 46 Villas (G+1+R) Date 03-April-22 [uvmitea No P021.47-DB52-SD-ELEC-002 za [Submittal Title: op Drawing submittal for telephone system layéut [We are sending herewith under separate cover the drawings / documents / samples listed below. MNS Roe cee DESCRIPTION TPE | COPIES |REMARKS o1 Thard copy] Drawing | As per attached [Underground telephone system sD & attached layout soft copy | DIEESD= Shop Drawn ‘SHE Sample, GT= Guarantee, MD= Manufacturers Data, CTs Cerficates, T= Test Revues OT= Other TERT Ate © pris submitted herewith have been reviewed in detail and are in strc codlitaahe and specifications except as otherwise stated, TS. [Contractori(¥ascon):013 |Signature: Received By Ke ee fe 4 rauhas! Date: Mohammad Nata Signature: mien Date: 1713SS [Resident Engineer Review Comments [Consultant Decision © ‘A’Approved (C P’Approved As Noted © ‘C’Not Approved C)_ ‘D’Not Required Resident Engineer's (Name): Signature: Received By Contractor Date: Date: Copy to: Employer Head Office [Corectons ‘or comments made relative to submitals durng tis review Go nol releve the contracior fom complanoe wih The Jeauirements of The Contract. This check is only for review of general conformance withthe design concept ofthe project and general Jcompliance with the information given in the contract documents. The contractor & tesponsile for confirming and correlating al Jevantties end dmensions, selecting fabrication processes and techniques of construction, coordinating his work with that of other trades Jang performing his work n'a sae and salistaciory manner Consultant |" [] [|

You might also like