You are on page 1of 5

PROFESSIONAL ENGINEER

SUMMARY STATEMENT

Paragraph number
A Brief Summary of How you Have in career episode(s)
Competency Element
applied the element where the element
is addressed
PE 1 KNOWLEDGE AND SKILL BASE

I Studied Environmental Engineering,


Applied Mechanics, Engineering
Mathematics, Surveying, in my 1.3.6
graduation and used the knowledge in 1.3.9
performing the design calculation as 1.3.12
PE 1.1 well generating technical specifications.
Comprehensive, theory-
based understanding of the My syllabus included engineering
underpinning natural and graphics which helped me in analyzing
physical sciences and the and reviewing building structural and 2.3.3
engineering fundamentals architectural drawings and vendor
applicable to the engineering deliverables.
discipline
To know the design parameters for the
preparation of engineering studies and
construction method statements, I 3.3.2
went through many Engineering design
books.
I performed mathematical
computations and numerical analysis
1.3.12
for my projects on various stages as
and when required.
I underwent the procedure of
PE1.2
purchasing the materials for the
Conceptual understanding of
construction of the building. I acquired 2.3.2
the mathematics, numerical
the high-quality materials includes
analysis, statistics and
cement, steels, paints etc.
computer and information
I did the project estimation and
sciences which underpin the
construction procedure according to
engineering discipline
the requirements. I prepared the bill of
quantity in which I did itemization of
3.3.2
the manpower, materials and
estimated the cost for mobilization to
meet the schedule timely.
PE1.3 I did extensive research about the
In-depth understanding of various water treatment plants and its
specialist bodies of operational requirements. I performed 1.3.2
knowledge within the population forecast survey of the 1.3.5
engineering discipline particular area to design the plant
considering the population growth.
Following the methodology for soil 2.3.4
testing, I conducted soil tests on the
proposed construction site to assess its
characteristics.
In order to ensure the layer meets the
intended specifications, I tested the
density of the DBGM layer (Dense
3.3.6
Graded Bituminous Macadam surface)
on the final layer of the road.
I researched various engineering
journals, text books and internet to
1.3.5
finalize the water treatment plant
design according to the standards.
I searched various sources such as a
PE1.4 journal, textbooks, websites etc. for
Discernment of knowledge more data and information for the pile 2.3.7
development and research footing requirements and quality tests. 2.3.2
directions within the I also conversed with my mentor and
engineering discipline experts.
To know the design procedure and to
prepare the construction method
statement, I was guide by the civil 3.3.2
engineering design books and 3.3.3
references.

I understood the water treatment


process and the various stages
1.3.6
involved with the operation. I gained
1.3.7
the knowledge on the properties of the
1.3.8
materials and its grades required for
the water treatment plants.

PE1.5
Knowledge of contextual
factors impacting the I studied several quality testing text
engineering discipline 2.3.4
books to find out the characteristics of
2.3.5
the soil and the load test of the pile
2.3.7
footings strength.

I am aware of the necessary interface


inherent between engineering systems
and the different stakeholders of every 3.3.9
project.
I understood the purpose of preparing
MTO, MDS, MR, weld map and as-built 1.3.
drawings in the project.
PE1.6
Understanding of the scope, I understood the policies of the
principles, norms, engineering standards which were 2.3.2
accountabilities and bounds implemented while working on the 2.3.8
of contemporary engineering project.
practice in the specific
discipline
I ensured all the safety gears (eye
glasses, steel toe boots, hand gloves
and mask) were worn to avoid injury 3.3.5
during the construction activities.
PE 2 ENGINEERING APPLICATION ABILITY
I did the sedimentation facilities design
and correlated with the similar plant
drawings and the assumptions 1.3.11
considered in the design to verify the
design accuracy.
PE2.1
Application of established I studied the design requirements of
engineering methods to the project and implied the quality
2.3.2
complex engineering control according to the technical so,
problem solving on each phase of construction.
In the project, I ensured that, major
activities were carried out based on
sound and fundamental engineering 3.3.9
principles.
I used AUTOCAD to draw the 3D
1.3.9
models.

I applied my knowledge of IS codes in


design and construction of pile 2.3.7
PE2.2 foundations.
Fluent application of
engineering techniques,
tools and resources I made the quality control plans with
an in-depth assessment of each phase
3.3.3
of the project adhere to the codes and
3.3.6
standards recommended by National
Highway Authority.

I had prepared the final design


1.3.8
deliverables in conformance of
1.3.9
international codes and requirement.

I effectively determined the cost of the


PE2.3
entire components and material used in
Application of systematic
the project and evaluated the cost of 2.3.2
engineering synthesis and
the work of the labors during the
design processes
construction activity.
I evaluated the measure of work and
site offices and other necessary 3.3.2
facilities required for the work. I did 3.3.9
frequent site visits to ensure the
quality and the constructability.
PE2.4
Application of systematic I conducted a detailed survey for the
approaches to the conduct data collection and visited various 1.3.2
and management of authorities gather the detail 1.3.9
engineering projects information related to the project.

I conducted meeting with the site 2.3.2


construction team and supervisors for 2.3.8
preparing the work schedule and
methodologies and to gather the detail
information during the execution as
well.
I had a chance to resolve some of the
issues raised during the bid as well
execution phase. My suggestions were
3.3.1
implemented and achieved the results
3.3.5
within the time frame without any cost
or schedule deviations.

PE3 PROFESSIONAL AND PERSONAL ATTRIBUTES


I studied various design possibilities for
the treatment process improvements
by interact with experts and referring
various design philosophies outlined 1.3.10
and visited the nearby treatment plants
operated by Kerala Water Authority
(KWA).
PE3.1
Ethical conduct and I did the vertical load testing of piles
professional accountability after 28 days of concrete pouring in 2.3.7
accordance with IS 2911 (PART IV).

I worked adhered to all the codes and


standards set in my company. I made
sure the safety practice be followed 3.3.2
according to the standards of civil 3.3.9
construction.

I was in close contact with local


governing bodies to maximize the data 1.3.2
collection.
PE3.2
I was in close contact with the client to
Effective oral and written
understand their requirements and to 2.3.1
communication in
get clear about the technical query for 2.3.2
professional and lay
better workflow.
domains
I talked to the supervisor and experts
on a regular basis. I created a detail
report of project task and presented 3.3.2
the findings to my line manager.
I did the water sample analysis of all
the local water resources and 1.3.4
concluded on the design criteria.
I prepare the detailed site mobilization
PE3.3 as well the initial site set-up. All these
2.3.3
Creative innovative and helped me I avoiding idle time of crew
proactive demeanor in site.
I conducted the cost analysis of the
project task to ensure the profitability
of the project. The proposals
3.3.2
implemented and it results
effectiveness.
I conversed with the head of the
department- Civil Engineering and
PE3.4 other project members. I did extensive 1.3.4
Professional use and research in the engineering design 1.3.2
management of information books, journals and internet to gain
information about the plant design.
I prepared cost estimation for the 2.3.3
temporary attachments and support
structures. Ensured the plans are done
refer to project requirements and
submit to the client.
I eliminated the issues in the project
timely, so as to ensure the smooth
continuation of the work by discussing
3.3.9
and consulting with my line manager
as well as the supervisor and site team
I mentioned all the results and
conclusion in the final report of the 1.3.12
project.
I followed the specified codes of
conduct and safety. I behaved friendly
and mannerly with my colleagues, 2.3.8
PE3.5 technicians, supervisor and workforce. 2.5
Orderly management of self, I was unbiased towards personal
and professional conduct working under me.
I attended job safety analysis meeting
and decide on the execution plan to
make sure that no Loss Time Injury
(LTI) happens during the work and 3.3.9
ensured the project quality plans are
followed
I did daily meetings with my team
members to decide the development of
3.5
the work and to understand the hurdles
during the development of the project.
I ensured people working around were
PE3.6 motivated to do the task. I ensured
2.5
Effective team membership friendly environment be made in work
and team leadership. area.
I earned the trust and confidence of
the colleagues, by responding to their
3.5
queries and showing willingness to help
them to resolve technical issues.

You might also like