You are on page 1of 3

PROFESSIONAL ENGINEER

Summary Statement
Paragraph in the career
A brief summary of how you
Competency Element episode(s) where the
have applied the element
element is addressed
PE1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive, theory- CE 1.6, CE 1.7, CE 1.8, CE
based understanding of the 1.9, CE 1.10, CE 2.6, CE
underpinning natural and I implemented the knowledge and 2.7, CE 2.8, CE 3.6, CE 3.7,
physical sciences and the fundamentals of Civil Engineering CE 3.8
engineering fundamentals to achieve the goals of the projects
applicable to the engineering
discipline
By performing atterberge lab test,, CE 1.9, CE 1.10, CE 2.8, CE
PE1.2 Conceptual understanding
I determined the plastic and liquid 3.7, CE 3.8
of the mathematics, numerical
limits related to soil and also
analysis, statistics and computer
determine the strength of soil by
and information sciences which
conducting CBR test. I also
underpin the engineering
performed Jack Pressure
discipline
Calculation for the slab and beam
By using MS-Project Management CE 2.9
PE1.3 In-depth understanding of
software, I kept the track of
specialist bodies of knowledge
project activities
within the engineering discipline
I performed an extensive amount CE 1.11
of investigation analysis and
PE1.4 Discernment of
ensuring of accurate testing
knowledge development and
procedures. I took help from
research directions within the
relevant research journals, books
engineering discipline
and online sources to acquire
proper information and data
All the testing procedures were CE 1.11, CE 2.9, CE 3.5
PE1.5 Knowledge of contextual conducted in compliance with the
factors impacting the engineering requisite engineering skills and
discipline standards.

PE1.6 Understanding of the My designs incorporated both,


scope, principles, norms, primal and latest methods and I CE 1.6, CE 1.7, CE 1.8, CE
accountabilities and bounds of was able to abide by various codes 1.9, CE 1.10, CE 2.6, CE
contemporary engineering of practice 2.7, CE 2.8, CE 3.6, CE 3.7,
practice in the specific discipline CE 3.8
I applied International standards
and specifications to strengthen CE 1.11, CE 2.9, CE 3.5
my designs

I assured that none of the project


activity cause damage to the
environment. During open pit
design, I ensured project will not CE 2.10, CE 3.9
cause quality deterioration of both
groundwater and surface water by
implementing remedial measures

PE2 ENGINEERING APPLICATION ABILITY


I identified and targeted salient CE 2.7, CE 3.6, CE 3.7
PE2.1 Application of established
issues that arose in the project and
engineering methods to complex
pulled them out by root to save
engineering problem solving
costs and time of the project
PE2.2 Fluent application of I used MS-Project Management CE 2.9
engineering techniques, tools and software to complete the project
resources on-time
The projects were crafted by
PE2.3 Application of systematic following the International CE 1.6, CE 1.7, CE 1.8, CE
engineering synthesis and design Engineering Standards and by 1.9, CE 1.10, CE 2.6, CE
processes implementing the latest knowledge 2.7, CE 2.8, CE 3.6, CE 3.7,
and strategies CE 3.8
I managed a team of engineers by CE 2.5, CE 3.5
closely working with them and
PE2.4 Application of systematic communicated with them
approaches to the conduct and
management of engineering
projects I addressed contextual issues
efficiently to save the incurring
costs of the project
PE3 PROFESSIONAL AND PERSONAL ATTRIBUTES
I upheld International engineering
norms and professional code of CE 1.11, CE 2.9, CE 3.5
ethics to devise my designs
PE3.1 Ethical conduct and
professional accountability I tried my best to make sure that
all the activities of the project CE 2.10, CE 3.9
were fulfilling the health and
safety standards
PE3.2 Effective oral and written I called meetings with the team CE 2.5, CE 2.9, CE 3.6
communication in professional and instructed to remain active
and lay domains throughout the meeting.
I thoroughly read the research CE 1.11
PE3.3 Creative innovative and journals, books and online sources
proactive demeanour to acquire proper information and
data.
I developed the document to CE 1.11, CE 2.5, CE 2.9
represents the comprehensive
PE3.4 Professional use and
project details. I also made the
management of information
survey report and submitted it to
the manager
Being organized in nature, I
CE 2.9, CE 3.5
developed project schedules by
using WBS which showed each
,PE3.5 Orderly management of and construction activities
self, and professional conduct
I researched all the technical
processes to determine the
accurate testing procedures
CE 1.11
I had an understanding of team
dynamics to a great extent and CE 2.5, CE 3.5
PE3.6 Effective team
used it to keep my team under
membership and team leadership
control for the benefit of the
projects

You might also like