PPAP REQUIREMENTS
HANDBOOK
V3
2015-11-05
Proprietary
IMPORTANT
This process is derived from, but not equal to, the Ford process.
It is important to ensure that the Volvo Car version is always used for Volvo Car business as they are NOT
interchangeable.
For any queries regarding the process described in this document, please contact your Volvo Car Site SQM.
Volvo Car PPAP will provide Volvo Car and the Supplier with an improved understanding of Supplier
manufacturing process and part readiness.Volvo Car PPAP organizes the Production Part Approval
Process into four deliveries:
Teamwork
Volvo Car and its Suppliers must work together to deliver a quality part, produced on-time, that meets
all Volvo Car requirements.
To drive flawless execution in launching and delivering products that surpass customer expectations,
Volvo Car and its Suppliers must place trust, integrity and accuracy above all else in the Production
Part Approval Process.
Scope
PPAP must be completed for any of the situations already specified by the current edition AIAG PPAP
Manual. In addition, any increase in the Invested Normal weekly Capacity (NWC) declared by the
customer above the verified declared NWC will require the Supplier to re-complete any affected PPAP
deliveries.
Name of document Page
Issue
Volvo Car - 3 (8)
PPAP Requirements HandbookIssue
Type of document Security class: Date
Issue
Instruction Proprietary V3 2015-11-05
Issuer Appendix
Issue
Supplier Quality Management - Hans Pettersson,
hpetter2
PPAP Objectives
Trial Runs
Objectives:
• To trim the process until Requirements are met to support a Run-at-Rate.
• Trial’s must be planned to support Run-at-Rate timing.
Run-at-Rate
Objectives:
• To provide an indicator that the process/tool/facility design has the potential to produce
acceptable parts at the planned ideal cycle time.
Important notes:
R@R is a limited production run of parts for at least one production stream, and is not a demonstration
that all PPAP requirements have been met for that production stream.
Objectives:
• To verify that the process/tool/facility has the potential to produce product consistently meeting
all customer design records and specification requirements (Part Folder For Supplier) by
operating a minimum of one selected production stream.
Important notes:
For suppliers with only one production stream completion of TR Testing & Product Approval (Ph1&2)
occur at the same time. It is required that prior to TR Testing (Ph1) submission that sub-supplier(s)
material status from Tierx has also achieved TR Testing Approval (Ph1).
Name of document Page
Issue
Volvo Car - 4 (8)
PPAP Requirements HandbookIssue
Type of document Security class: Date
Issue
Instruction Proprietary V3 2015-11-05
Issuer Appendix
Issue
Supplier Quality Management - Hans Pettersson,
hpetter2
Important notes:
• The approach adopted for PPAP of multiple production streams is scenario-specific and must
be agreed between the Supplier and SQM.
• Production & Capacity Approval (Ph2 and Ph3) can happen concurrently if requirements for
both deliveries are fulfilled.
PPAP Approval
Process Approval (Ph0+) require a PPAP Submission Warrant (PSW), however a Capacity
Analysis Report Report (CAR) and supporting documentation must be submitted with the Part
Submission Warrant and signed by the Supplier.
• In addition, the Supplier should have results from Run-at-Rate readily available for Site SQM
review and approval when required
• All PPAP delivery timings require a Part Submission Warrant (PSW) and customer approval in
line with the AIAG PPAP submission level.
• Capacity Approval (Ph3) requires Suppliers to complete the Capacity Analysis Report in
addition to the Part Submission Warrant.
• Suppliers to Volvo Car and its affiliates utilize the Volvo Car Part Submission Warrant (PSW).
SQM will review and either Approve, Reject or Interim Approve (TPD required) the Part
Submission Warrant (PSW).
• Any temporary exception due to non-compliance with a PPAP element or build timing
requirement is handled in line with the Handling Part Deviation Process.
Name of document Page
Issue
Volvo Car - 5 (8)
PPAP Requirements HandbookIssue
Type of document Security class: Date
Issue
Instruction Proprietary V3 2015-11-05
Issuer Appendix
Issue
Supplier Quality Management - Hans Pettersson,
hpetter2
Expectations
PPAP Deviation
It is the responsibility of the Supplier to complete the 18 requirements of PPAP and get an Approved
or Interim PSW using the latest Partfolder prior to the date when approved material is required to
support customer manufacturing.
Site VQE Part Status PPAP PPAP Status PPAP Status PPAP Status PPAP Status
Status Submission Process TR Testing Production Capacity
Level (Ph0+) (Ph1) (Ph2) (Ph3)
VQE Non-Priority 1 Supplier Site self-certifies to Volvo Car PPAP Requirements
No VQE Non-Priority 3 SQM desktop review of PPAP submission and accompanying
documentation
Regardless of Priority 5 SQM On-Site review of Supplier Site PPAP submission and
VQE Status accompanying documentation
Documentation PSW PSW PSW PSW
Support Doc. Support Doc. Support Doc.
CAR CAR
Sample parts Sample parts
if requested. if requested.
Name of document Page
Issue
Volvo Car - 6 (8)
PPAP Requirements HandbookIssue
Type of document Security class: Date
Issue
Instruction Proprietary V3 2015-11-05
Issuer Appendix
Issue
Supplier Quality Management - Hans Pettersson,
hpetter2
Definitions
Production Stream:
A single production stream is a sequence of a minimum of one line, machine, tool,
cavity, facility, equipment, gauge, operator and other required items at the intended
location and with the intended layout that will be used to produce parts that meet
Volvo Car specifications.
All production streams must include any additional items not included in the single
production stream that are required to meet the Invested Normal Weekly Capacity (NWC)
requirements for all parts produced in the line (e.g. additional tools,cavities, lines, conveyors,
machines).
Interim Acceptance
• Part deviates from Partfolder specifications but meets customer specifications by a valid
Temporary Part Deviation(TPD).
• Process deviates from Customer Process Requirements (e.g. poka-yoke) but meets customer
expectations by a valid Temporary Part Deviation(TPD).
Approved PSW
• Part meets all customer specifications and requirements.
Tables
• Hard Tools • Hard Tools • Hard Tools - Grained • Hard Tools - Grained
(Graining not required if (Graining not required if
agreed with Site SQM). agreed with Site SQM).
Important notes:
When a TR Testing verification (Ph1) has been approved for ALL production streams a Production
Warrant (Ph2) can be issued. Tool payment Requires an approved Production PSW (Ph2).