NEW DESIGNED PART CARRYOVER PART

DFMEA REVIEWED FOR YC / YS DESIGNATION DFMEA REVIEWED FOR YC / YS DESIGNATION

CC / ▼ // OS
▼(CC) OS FORMALIZED
FORMALIZED and
and RELEASED
RELEASED ON
ON FORD
FORD PRINT
PRINT ▼(CC) / OS REVIEWED AND UPDATED ON FORD PRINT

SC / HIC FORMALIZED ON PFMEA SC / HIC REVIEWED ON PFMEA - ALL OCC UPDATED

NEW TOOLING FOR ASSY (YES/NO) or SUB-ASSY (YES/NO) COMPLETE SUPPLEMENT K FOR:
1) ▼(CC) / SC DIMENSIONS FOR FINAL ASSY
2) ALL ▼(CC) / SC DIMENSIONS OF SUB ASSY
IF YES TO ALL OF THE ABOVE - COMPLETE SUPPLEMENT K FOR: 3) MIN. 6PC LAYOUTS W/ DATA FOR ALL OTHER DIMENSIONS
1) ALL DIMENSIONS FOR FINAL ASSY
2) ALL DIMENSIONS OF SUB ASSY ALL DIMENSIONS MUST BE CAPABLE (PPK > 1.67) OR MUST BE
100% ERROR PROOFED WITHIN PROCESS PRIOR TO
ALL DIMENSIONS MUST BE CAPABLE (PPK > 1.67) OR MUST BE
100% ERROR PROOFED WITHIN PROCESS PRIOR TO SUCCESSFUL LAUNCH
SUCCESSFUL LAUNCH
CONTROL PLAN SPECIAL CHARACTERISTICS

SUPPLEMENT K - SPECIAL CHARACTERISTICS LINKAGE


Prototype Pre-Launch Production
Control Plan Key Contact / Phone Date (Orig.) Date (Rev)

Part Number / Latest Change Level Core Team Customer Engineering Approval Date

Part Name / Description Supplier / Plant Approval Date Customer Quality Approval Date

Supplier / Plant Supplier Code Other Approval Date (if Req'd.) Other Approvals Date

KEY CLASSIFICATIONS (CLASS): CC = CRITICAL CHARACTERISTIC SC = SIGNIFICANT CHARACTERISTI HIC = HIGH IMPACT CHARACTERISTIC DFMEA PFMEA
Sev 9, 10 → YC Sev 9, 10 → ▼ (CC), OS
SUPPLIER NOTES / COMMENTS: SPECIAL CHAR. LINKAGE Sev 5-8 AND Occ 4-10 → YS Sev 5-8 AND Occ 4-10 → SC, HIC
Item Characteristic Description Operation Machine Specification / Tolerance Ford Design Process Con Pln EP GR&R mean std dev. Ppk Pp Process Control / Control Plan Process action plan Person Due
Print FMEA FMEA Responsible
Frequency of Checks Date
Gage Diameter 21.0 +/- 0.2 mm 11.80% 21.02 0.036 1.67 1.852 Caliper check at setup & 1part/hour - SPC Improve clamping blocks to reduce G R&R ZZ Top 25-Dec
Rough Length Tube Cut to 154.75 +/- 0.75 ▼ YC CC CC √ 9.40% 155.2 0.098 1.02
Machine
Op # 001 Length Sub-
Apprearance 224-5 No nicks, scratches 100% Visual, Boundary Samples on line Update Visual Standards ZZ Top 25-Dec
assy
Slot Width 15.75 Min Go / No-go gauge block - 1 part / hour

Op #

Op #

Op #

Op #

Op #

Op #

Op #
CONTROL PLAN SPECIAL CHARACTERISTICS

SUPPLEMENT K - SPECIAL CHARACTERISTICS LINKAGE


Prototype Pre-Launch Production
Control Plan Key Contact / Phone Date (Orig.) Date (Rev)

Part Number / Latest Change Level Core Team Customer Engineering Approval Date

Part Name / Description Supplier / Plant Approval Date Customer Quality Approval Date

Supplier / Plant Supplier Code Other Approval Date (if Req'd.) Other Approvals Date

KEY CLASSIFICATIONS (CLASS): CC = CRITICAL CHARACTERISTIC SC = SIGNIFICANT CHARACTERISTI HIC = HIGH IMPACT CHARACTERISTIC DFMEA PFMEA
Sev 9, 10 → YC Sev 9, 10 → ▼ (CC), OS
SUPPLIER NOTES / COMMENTS: SPECIAL CHAR. LINKAGE Sev 5-8 AND Occ 4-10 → YS Sev 5-8 AND Occ 4-10 → SC, HIC
Item Characteristic Description Operation Machine Specification / Tolerance Ford Design Process Con Pln EP GR&R mean std dev. Ppk Pp Process Control / Control Plan Process action plan Person Due
Print FMEA FMEA Responsible
Op # Frequency of Checks Date