ITP - VergeT1 - Macro Air Wall System (Macro)
ITP - VergeT1 - Macro Air Wall System (Macro)
Document Review
Activity Company Name Title Signature Date
Prepared by MACRO Maria Soledad T. Natividad QAQC Supervisor
Recommended by MDC Donoven Mauring Jr. Project Superintendent
Approved by MDC Michael Tan Sia Project in Charge
Validated by MDC Edgardo Amigo Jr QAQC Supervisor
1.3.1. EPS - Expanded Polysterene Wall Review/Check - Project Specification 100% as per required by Approval from X R R
- Plans general note specs Consultant / RFA
- Contract Agreement
- Codes and applicable
regulatory
1.3.2. PU foam Review/Check - Project Specification 100% as per required by Approval from X R R
- Plans general note specs Consultant / RFA
- Contract Agreement
- Codes and applicable
regulatory
1.3.3. Concrete Epoxy Review/Check - Project Specification 100% as per required by Approval from X R R
- Plans general note specs Consultant / RFA
- Contract Agreement
- Codes and applicable
regulatory
Avida Towers Verge Tower 1
Inspection & Test Plan FORM NO.: F-PQP-QP06-01
1.3.4. Macro Air Premix 1 Review/Check - Project Specification 100% as per required by Approval from X R R
- Plans general note specs Consultant / RFA
- Contract Agreement
- Codes and applicable
regulatory
1.3.5.Macro Air Premix 2 Review/Check - Project Specification 100% as per required by Approval from X R R
- Plans general note specs Consultant / RFA
- Contract Agreement
- Codes and applicable
regulatory
1.3.6. Macro Air Additive Review/Check - Project Specification 100% as per required by Approval from X R R
- Plans general note specs Consultant / RFA
- Contract Agreement
- Codes and applicable
regulatory
1.3.7. Sand Review/Check - Project Specification 100% as per required by Approval from X R R
- Plans general note specs Consultant / RFA
- Contract Agreement
- Codes and applicable
regulatory
1.3.8. Sealant Review/Check - Project Specification 100% as per required by Approval from X R R
- Plans general note specs Consultant / RFA
- Contract Agreement
- Codes and applicable
regulatory
1.3.9. Cement Review/Check - Project Specification 100% as per required by Approval from X R R
- Plans general note specs Consultant / RFA
- Contract Agreement
- Codes and applicable
regulatory
Avida Towers Verge Tower 1
Inspection & Test Plan FORM NO.: F-PQP-QP06-01