You are on page 1of 1

C/L OF MAIN TRANSFORMER (WORK IN PROGRESS)

1 2 3 4 5 6 7 8 9 10 11 12

C/L OF GANTRY (WORK IN PROGRESS)


6m WIDE ROAD
ELEV. +0.10m
(BITUMINOUS SURFACE)

C/L OF DS

C/L OF CB

C/L OF DS
C/L OF SA

C/L OF CT

C/L OF PT
6.0000 3.5000 3.0000 3.5000 3.5000 3.0000 3.4800

A A
AIL
DR
AR
GU

4.93 F1C1
X
XX

F1C1
X
XX

F1C1 F1C1
X
XX

F1C1
X
XX

F1C1
X
XX

F1C1 F1C1
X
XX

F1C1
X
XX

F1C1
XX
X
F1C1
XX
X
F1C1 F1C1
XX
X
F1C1
XX
X
F1C1 F1C1

OIL AND WATER E


ELEV. +1.30m OP
SEPARATOR %
SL
10

X
XX
F1C1
OIL CONTAINMENT

2.75 2.18 EL = 1.30m


TOP OF AGGREGATE COURSE FINISH

F1C1 F1C1

X
XX
3.0000

X
F1C1 F1C1

X
X
0.35
2.0000

CENTER LINE

X
PUMP ROOM

XX
2.0000
C1 C2 C3
3.0000
F1C1 F1C1

X
X
X
0.57 0.5 0.1 OIL AND WATER CATCHMENT

X
XX
F1C1 F1C1

ELEV. +0.10m
EL = 0.1 m
200MM THK RC FIREWALL

(BITUMINOUS SURFACE)

X
X
X
6m WIDE ROAD
F1C1 F1C1

0.3

X
XX
0.5
X X X X X X
XX XX XX XX XX XX

0
a
B

b
c
F1C1 F1C1 F1C1 F1C1 F1C1 F1C1 F1C1 F1C1 F1C1 F1C1

C
B B

0.83

0.83

X
X
XX
EL = 0.15 m
F1C1 F1C1

X
X
0.2 F1C1

X
0.52 0.9
1 2 3 4 5 6 7

SUBSTATION
ENTRANCE
F1C1 F1C1 F1C1

EL = 0.1 m EL = 0.2 m

1.07

3.03
EL = 0.1 m

SEPTIC
TANK
0.43
EL = 0.1 m

ELEV. +0.00m

PARKING AREA - 6 SLOTS

ELEV. +0.10m

0.23 0.59

C C

BLOW-UP PLAN
D D

0.1

0.1
1.55

1.55
A 11/24/22 For Approval JRC CVA THP

3.35

3.35
E 3.15 Prepd. Chkd. Appd. E

3.15
REV DATE DESCRIPTION
0.1

0.1
Project Title:

75 MWac Pinugay Solar Power Plant


0.3 0.05

Barangay Pinugay, Baras, Rizal, Philippines


0.35
1.6

1.6
0.05
0.25 0.15
0.45
0.9
0.3

F SECTION A-A SECTION C-C F

0.1
1.55
1.55

PRC No.: Validity:

3.35
G G
3.35

3.15
3.15

0.1
0.1

PTR No.: Date:

Place: TIN No.:

Document Title.:
CIVIL & ARCHITECTURAL

1.6
1.6

MAIN CONTROL BUILDING WATER LINE,


SANITARY, & STORM WATER LAYOUT AND DETAILS
Document No.: Page No.:
Prepd. GSO
Chkd. CVM GBPSAT-200-CE-3603-0006-A CE-3603
H Appd. THP SCALE: AS SHOWN
H
SECTION B-B SECTION D-D DATE. 11/24/2022 Project No. : 45-2020-GBP FILENAME: GBP02

1 2 3 4 5 6 7 8 9 10 11 12

You might also like