EPC FOR ASAB PHASE II STAGE-I PROJECT

Project No. 14403 Contract No. 16702.02

FITUP AND WELD VISUAL INSPECTION REPORT


Form Number: P14403-ASB-MECH-004
Report No: AP2-PL-RDS1-449-VI-009 Welding Date : 16-Nov-2019
Location: Sb-449 / RDS-1 Material Spec : API 5L Grade X52NS (PSL2) Diam. 6 Inches

Welder Id No's:
Sl No Line/Drawing No: Pipe No. Heat no. Length Thickness Bend Details Joint Joint No. Fit Up WPS No. Visual Insp.
(Mtrs) (mm) Type F/C Result
Root Hot
F1 F2 F3 C1 C2

14-78-22-1604 Rev.1 031 N4513V 11.75 12.5 KP00/ 14403-ALASAB-WPS/ AP2-PL-W001


1 N/A BW Accepted Accepted
Sheet 1/1 083 N4513V 11.69 12.5 J-026 PL-001A AP2-PL-W002

Nothing Follows

Cumulative Today: Electrode Brand / Dia / Batch No.


TODAY
(No's) PREVIOUS (No'S) CUMULATIVE (No's)

LINE-UP 1 10 11 Esab Pipeweld E6010 Plus 3.2mm Diam. VT919E8683


Esab Pipeweld E7010 Plus 4.0mm Diam. VT915E8400
WELDING COMPLETED 1 10 11

Remarks :

COMPLETED BY AL ASAB - CONSTRUCTION AL ASAB - QA/ QC COMPANY / TPI

SIGNATURE:
Jamel Khardani Edison Walit
NAME:
Construction Manager QC Welding Inspector
DESIGNATION:
16-Nov-19 16-Nov-19
DATE: